Power grid investment optimization method based on big data analysis

Through big data analysis methods, the demand for energy storage systems in power planning areas is optimized, which solves the problem of insufficient attention to energy storage system construction in traditional power grid investment optimization, improves the flexibility and stability of the power grid, and achieves more scientific power resources. configuration.

CN118868072AActive Publication Date: 2024-10-29TECH & ECONOMIC CONSULTING CENT FOR ELECTRIC POWER CONSTR OF CHINA ELECTRICITY COUNCIL

Patent Information

Application Number
CN202411027814.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-29
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

Traditional power grid investment optimization methods mainly focus on power balance and do not pay enough attention to the construction and optimization of energy storage systems, resulting in the flexibility and stability of the power grid being suppressed.

Method used

Using a method based on big data analysis, by monitoring and predicting meteorological data and historical load data in the power planning area, the energy storage system demand construction scale data is constructed, and combined with the virtual energy storage compensation parameters for optimization, the optimal energy storage system is determined. Best construction scale.

Benefits of technology

It achieves more accurate prediction of power demand and supply, improves the flexibility and stability of the power grid, optimizes the allocation of power resources, and avoids power shortages or excesses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118868072A_ABST
    Figure CN118868072A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power grid investment optimization, and particularly discloses a power grid investment optimization method based on big data analysis, and the method comprises the steps: carrying out the monitoring and processing of meteorological data of a power planning region, and obtaining a new energy station generating capacity time sequence function of the power planning region; the demand load is predicted according to the historical load data of the power planning area, and energy storage system demand construction scale data of the power planning area is obtained through comprehensive analysis; obtaining new energy vehicle use data of the power planning area, and performing comprehensive analysis to obtain a virtual energy storage compensation parameter of the power planning area; and optimizing the energy storage system demand construction scale data of the power planning area according to the virtual energy storage compensation parameter of the power planning area. According to the method, the charging demand and the discharging capacity of the electric vehicle are comprehensively considered, the optimal construction scale of the energy storage system is determined, and a more scientific basis is provided for power grid investment optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid investment optimization, and in particular to a power grid investment optimization method based on big data analysis. Background Art

[0002] Grid investment optimization plays a vital role in the current power system, aiming to improve the operation efficiency, safety and economy of the grid through rational allocation of resources.

[0003] For example, the invention patent with announcement number CN117252707B is a method and device for optimizing power grid project investment. It includes collecting power parameters and analyzing them to obtain existing problems of the power grid; confirming business needs and the proposed project library based on the existing problems of the power grid; analyzing the business needs and the proposed project library to obtain project construction goals and divide the project construction goals and quantify the indicators; using the quantified indicators to build an investment portfolio optimization model; inputting the quantified indicator data into the investment portfolio optimization model to obtain the power grid project investment portfolio optimization plan.

[0004] For example, the invention patent with announcement number CN113793022B is a method and system for generating a power grid investment planning scheme based on distributed cloud energy storage. By obtaining the current status of the power system of the power grid, the power grid is planned and the power balance analysis is performed on the power grid to generate a predicted power distribution point, capacity and required power generation of the power grid; at the same time, combined with the actual situation of the power grid, a plan for the installation of power grid substations and transmission lines and a distributed cloud energy storage platform architecture plan are generated; and multiple power grid investment planning schemes are formulated; operational data analysis is performed on the multiple power grid investment planning schemes, and the optimal power grid investment planning scheme is obtained based on the results of the operational data analysis.

[0005] Based on the above solution, it is found that there are still some shortcomings in the optimization of power grid investment. Specifically, the traditional power grid investment optimization mainly revolves around power balance. By predicting future power demand and supply, new energy sites and transmission lines are planned. This method ensures the stable operation of the power grid to a certain extent, but does not pay enough attention to the construction and optimization of the energy storage system, which inhibits the flexibility and stability of the power grid to a certain extent. Summary of the invention

[0006] In view of the deficiencies in the prior art, the present invention provides a power grid investment optimization method based on big data analysis, which can effectively solve the problems involved in the above-mentioned background technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: The first aspect of the present invention provides a method for optimizing power grid investment based on big data analysis, including: monitoring the meteorological data of the power planning area, processing to obtain the time series function of the power generation of new energy sites in the power planning area, and predicting the demand load based on the historical load data of the power planning area, and comprehensively analyzing to obtain the demand construction scale data of the energy storage system in the power planning area.

[0008] The new energy vehicle usage data in the power planning area is obtained, and the virtual energy storage compensation parameters in the power planning area are obtained through comprehensive analysis.

[0009] The energy storage system demand construction scale data in the power planning area is optimized according to the virtual energy storage compensation parameters in the power planning area.

[0010] As a further method, the processing obtains the time series function of the power generation of the new energy stations in the power planning area. The specific process is: deploy a number of environmental monitoring points, collect the solar radiation and wind speed in the power planning area at each environmental monitoring point, and obtain the power generation impact weight factors corresponding to the set solar radiation and wind speed from the power planning database, and comprehensively analyze to obtain the power generation evaluation index of the power planning area.

[0011] The power generation evaluation indicators of the power planning area are compared one by one with the estimated power generation corresponding to each power generation evaluation indicator interval stored in the power planning database to obtain the estimated power generation of the power planning area. At the same time, the historical data of the power generation of the new energy sites in the power planning area are obtained, and the time series function of the power generation of the new energy sites in the power planning area is obtained through curve fitting.

[0012] As a further method, the demand load is predicted based on the historical load data of the power planning area. The specific process is: based on the historical load data of the power planning area, the historical load time series function of the power planning area is obtained by curve fitting.

[0013] Deploy several historical monitoring time points, obtain the historical load at each historical monitoring time point, and obtain the demand load in the power planning area after processing.

[0014] As a further method, the comprehensive analysis obtains the energy storage system demand construction scale data in the power planning area. The specific analysis process is: comparing and analyzing the time series function of the power generation of the new energy station in the power planning area with the historical load time series function, obtaining the historical monitored power supply and demand difference, and extracting the maximum value of the historical monitored power supply and demand difference.

[0015] The power supply and demand difference threshold is extracted from the power planning database. If the power supply and demand difference in a certain time period is greater than or equal to the power supply and demand difference threshold, the time period is marked as the demand power scheduling time period, the historical demand power scheduling time periods are counted, and the sum result is marked as the historical scheduling duration of the energy storage system.

[0016] A comprehensive analysis is conducted to obtain an energy storage system dispatch demand assessment index for the power planning area, and the energy storage system demand construction scale data for the power planning area is matched.

[0017] As a further method, the comprehensive analysis obtains the virtual energy storage compensation parameters of the power planning area. The specific analysis process is: the new energy vehicle usage data of the power planning area, including the number of operating new energy vehicles in the power planning area and user vehicle usage habit data.

[0018] Based on the user's car usage habit data, the virtual energy storage regulation capacity evaluation index of the power planning area is obtained after processing, and the virtual energy storage compensation parameters of the power planning area are obtained through comprehensive analysis.

[0019] As a further method, the matching obtains the energy storage system demand construction scale data of the power planning area, and the specific process is: the energy storage system dispatch demand degree assessment index of the power planning area is compared one by one with the energy storage system demand construction scale data corresponding to each energy storage system dispatch demand degree assessment index interval stored in the power planning database, so as to obtain the energy storage system demand construction scale data of the power planning area, wherein the energy storage system demand construction scale data includes the energy storage capacity and energy storage power of the energy storage system.

[0020] As a further method, the energy storage system demand construction scale data of the power planning area is optimized according to the virtual energy storage compensation parameters of the power planning area. The specific process is: the virtual energy storage compensation parameters of the power planning area are compared one by one with the optimizable energy storage capacity and the optimizable energy storage power corresponding to each virtual energy storage compensation parameter interval stored in the power planning database to obtain the optimizable energy storage capacity and the optimizable energy storage power of the power planning area, and the energy storage system demand construction scale data of the power planning area is optimized according to the optimizable energy storage capacity and the optimizable energy storage power of the power planning area.

[0021] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: (1) The present invention provides a grid investment optimization method based on big data analysis, which comprehensively considers factors such as the charging demand and discharge capacity of electric vehicles and the power balance of the grid, determines the optimal construction scale of the energy storage system, and can more accurately predict future power demand and supply conditions, providing a more scientific basis for grid investment optimization.

[0022] (2) By analyzing historical load data, the present invention can evaluate the stability of the power system in different time periods, help discover potential system bottlenecks and failure points, and provide a basis for the optimization and transformation of the power system.

[0023] (3) By analyzing the difference between electricity supply and demand, the present invention can accurately grasp the imbalance between electricity supply and demand, thereby formulating targeted adjustment strategies, more accurately predicting future electricity demand, optimizing electricity resource allocation, and improving electricity utilization efficiency.

[0024] (4) By analyzing the historical demand for power dispatch time, the present invention can discover the law of changes in power demand and provide a more scientific basis for power production, transmission and distribution. At the same time, by analyzing the historical demand for power dispatch time, the response capability of the power system in different seasons and time periods can be evaluated, providing strong support for the planning, construction and operation of the power system, helping to predict future supply and demand trends and avoid power shortages or surpluses. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0026] Figure 1 It is a schematic diagram of the method flow of the present invention.

[0027] Figure 2 It is a schematic diagram of a functional relationship curve between the maximum value of the historical monitored power supply and demand difference and the energy storage system scheduling demand evaluation index involved in an embodiment of the present invention. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0029] Reference Figure 1 As shown, the first aspect of the present invention provides a method for optimizing power grid investment based on big data analysis, including: monitoring meteorological data in the power planning area, processing to obtain a time series function of power generation of new energy sites in the power planning area, and predicting demand load based on historical load data in the power planning area, and comprehensively analyzing to obtain data on the construction scale of energy storage system demand in the power planning area.

[0030] Specifically, the time series function of the power generation of new energy stations in the power planning area is processed. The specific process is: deploy a number of environmental monitoring points, collect the solar radiation and wind speed in the power planning area at each environmental monitoring point, and obtain the power generation impact weight factors corresponding to the set solar radiation and wind speed from the power planning database, and comprehensively analyze the power generation evaluation indicators of the power planning area.

[0031] In this embodiment, the power planning database is used to store data related to power grid investment optimization, including power generation impact weight factors corresponding to solar radiation and wind speed, historical solar radiation minimum, historical wind speed minimum, estimated power generation corresponding to each power generation evaluation index interval, load forecast impact weight factors corresponding to historical load minimum, historical load maximum and historical load average, power supply and demand difference threshold, historical power supply and demand difference, energy storage system historical scheduling duration and expected power supply and demand difference corresponding to energy storage system scheduling demand degree assessment impact factor, critical power supply and demand difference, critical energy storage system historical scheduling duration, battery capacity and charging rate corresponding to virtual energy storage regulation capacity impact factor, critical battery capacity, critical charging rate, number of new energy vehicle users and virtual energy storage regulation capacity assessment index corresponding to virtual energy storage compensation impact factor, critical number of new energy vehicle users, energy storage system demand construction scale data corresponding to each energy storage system scheduling demand degree assessment index interval, and optimizable energy storage capacity and optimizable energy storage power corresponding to each virtual energy storage compensation parameter interval. The data in the database can be obtained through experimental fitting.

[0032] In a specific embodiment, the historical minimum solar radiation and the historical minimum wind speed of the power planning area are extracted from the power planning database, and the power generation evaluation index of the power planning area is obtained by comprehensive analysis. The specific numerical expression is: ; In the formula, represents the power generation evaluation index of the power planning area, j represents the number of each environmental monitoring point, j=1,2,3,...,m, m represents the total number of environmental monitoring points, represents the solar radiation at the jth environmental monitoring point, represents the wind speed at the jth environmental monitoring point, Indicates the minimum historical solar radiation. Indicates the historical minimum wind speed. Indicates the weight factor affecting the power generation corresponding to the set solar radiation, Indicates the power generation impact weight factor corresponding to the set wind speed.

[0033] Table 1 Example of power generation evaluation index data

[0034] As shown in Table 1, the value of the power generation evaluation index is jointly determined by the solar radiation and wind speed. The greater the solar radiation and wind speed, the greater the corresponding power generation evaluation index, indicating that the potential power generation level of the power planning area is higher. It can be understood that the power generation evaluation index in this embodiment is used to quantitatively evaluate the power generation level of the power planning area.

[0035] The formula comprehensively considers the impact of two key factors, solar radiation and wind speed, on power generation, and adjusts the impact of solar radiation and wind speed through weight factors, making the evaluation results more comprehensive and accurate. By comparing the current solar radiation and wind speed with their historical minimum values, the data is standardized, so that data at different times and locations have a unified evaluation standard, which improves the fairness and comparability of the evaluation. The hyperbolic tangent function is used in the formula for nonlinear transformation, so that the sensitivity of the evaluation results to the input data is reasonably adjusted, avoiding the excessive impact of extreme data on the evaluation results, and improving the stability and reliability of the evaluation results.

[0036] It should be understood that in this embodiment, the value range of the power generation impact weight factor corresponding to the solar radiation and wind speed is between 0 and 1. A mapping set is established based on the historical power generation data to determine the impact of solar radiation and wind speed on power generation.

[0037] It should be understood that in this embodiment, the solar radiation can be monitored by a solar radiometer. Solar radiation is one of the main determinants of the power generation of a photovoltaic power generation system. By real-time monitoring of solar radiation, the output power of the photovoltaic power generation system can be predicted more accurately.

[0038] In this embodiment, the wind speed can be monitored by an anemometer. Wind energy is an important component of renewable energy, and wind speed is a key factor in evaluating the potential of wind energy resources and determining the site selection of wind farms. By monitoring wind speed, the power generation potential and efficiency of wind farms can be evaluated, and the layout and operation strategy of wind turbines can be optimized. In photovoltaic power generation, although wind speed is not the main factor directly affecting power generation, changes in wind speed may affect the temperature and heat dissipation of photovoltaic panels, and indirectly affect the performance of photovoltaic systems. Therefore, monitoring wind speed helps to more comprehensively evaluate and optimize the operation of photovoltaic systems.

[0039] The power generation evaluation indicators of the power planning area are compared one by one with the estimated power generation corresponding to each power generation evaluation indicator interval stored in the power planning database to obtain the estimated power generation of the power planning area. At the same time, the historical data of the power generation of the new energy sites in the power planning area are obtained, and the time series function of the power generation of the new energy sites in the power planning area is obtained through curve fitting.

[0040] It should be understood that the estimated power generation in this embodiment refers to the estimated total power generation in the power planning area within a set time period in the future.

[0041] In a specific embodiment, the time series function of the power generation of the new energy station can be fitted by polynomial to obtain the power generation autoregressive model, and the mathematical expression can be written as , where represents the power generation in the power planning area at time t, yes The mathematical model of t represents the time variable, the value range of t is [t1, t2], t1 represents the starting time point of the historical data, Indicates the end time point of historical data. express The parameter vector is used to describe all the preset parameters in the power generation autoregressive model.

[0042] In a specific embodiment, by analyzing the historical data of power generation of new energy stations, the operating performance of new energy stations can be evaluated and the operation and maintenance strategy can be optimized. At the same time, the power generation of new energy stations is estimated, which helps to optimize the scheduling plan of conventional regulating power sources and ensure the adequacy of power supply in the power system.

[0043] Specifically, the demand load is predicted according to the historical load data of the power planning area. The specific process is: according to the historical load data of the power planning area, the historical load time series function of the power planning area is obtained by curve fitting.

[0044] In a specific embodiment, the historical load time series function can be fitted by polynomial to obtain the historical load autoregressive model, and the mathematical expression can be written as , where represents the historical load of the power planning area at time t, yes The mathematical model of express A parameter vector that describes all preset parameters in the historical load autoregression model.

[0045] Deploy several historical monitoring time points, obtain the historical load at each historical monitoring time point, and obtain the demand load in the power planning area after processing.

[0046] In a specific embodiment, the load forecasting influence weight factors corresponding to the set historical load minimum value, historical load maximum value and historical load average value are obtained from the power planning database, and the demand load of the power planning area is obtained by comprehensive analysis. The specific numerical expression is: ; In the formula, represents the demand load in the power planning area, i represents the number of each historical monitoring time point, i=1,2,3,...,n, n represents the total number of historical monitoring time points, represents the historical load at the i-th historical monitoring time point, Indicates the load forecast impact weight factor corresponding to the set historical load minimum value, Indicates the load forecast impact weight factor corresponding to the set historical load maximum value. Indicates the load forecast impact weight factor corresponding to the set historical load average value, Indicates the minimum historical load value at the historical monitoring time point. Indicates the maximum historical load value at the historical monitoring time point. is the symbol for obtaining the minimum value, is the symbol for obtaining the maximum value.

[0047] It should be understood that the demand load in this embodiment refers to the estimated total demand load in the power planning area within a set time period in the future.

[0048] In this embodiment, the load forecast impact weight factor corresponding to the historical load minimum value, historical load maximum value and historical load average value ranges from 0 to 1. A mapping set can be established based on historical load data to determine the impact of the historical load minimum value, historical load maximum value and historical load average value on the demand load forecast.

[0049] In a specific embodiment, by analyzing historical load data, the stability of the power system in different time periods can be evaluated, which helps to discover potential system bottlenecks and failure points, and provides a basis for the optimization and transformation of the power system. By predicting the demand load, it helps the power system to allocate the power load and arrange the operation of related equipment, avoid the occurrence of safety hazards such as shortage or excess power and power failure, and help improve the safety and reliability of the power system.

[0050] Specifically, a comprehensive analysis is conducted to obtain the data on the construction scale of the energy storage system demand in the power planning area. The specific analysis process is as follows: the time series function of the power generation of the new energy stations in the power planning area is compared with the time series function of the historical load, the difference between the historical monitored power supply and demand is obtained, and the maximum value of the historical monitored power supply and demand difference is extracted.

[0051] It should be understood that in this embodiment, the absolute value of the difference between the power generation and the load is marked as the power supply and demand difference, and the historical monitoring power supply and demand difference refers to the absolute value of the difference between the historical power generation and the historical load. The specific mathematical expression is: , where represents the historical monitored power supply and demand difference in the power planning area at time t, represents the power generation in the power planning area at time t, Represents the historical load of the power planning area at time t.

[0052] The power supply and demand difference threshold is extracted from the power planning database. If the power supply and demand difference in a certain time period is greater than or equal to the power supply and demand difference threshold, the time period is marked as the demand power scheduling time period, the historical demand power scheduling time periods are counted, and the sum result is marked as the historical scheduling duration of the energy storage system.

[0053] A comprehensive analysis is conducted to obtain an energy storage system dispatch demand assessment index for the power planning area, and the energy storage system demand construction scale data for the power planning area is matched.

[0054] In a specific embodiment, the energy storage system scheduling demand assessment factor corresponding to the set historical power supply and demand difference, the historical scheduling duration of the energy storage system, and the expected power supply and demand difference is obtained from the power planning database, and the critical power supply and demand difference and the critical energy storage system historical scheduling duration are extracted from the power planning database, and the energy storage system scheduling demand assessment index of the power planning area is obtained through comprehensive analysis. The specific numerical expression is: ; In the formula, Represents the energy storage system dispatch demand evaluation index in the power planning area, Indicates the maximum value of the historical monitored power supply and demand difference. Indicates the historical dispatching duration of the energy storage system, represents the estimated power generation in the power planning area, represents the demand load in the power planning area, represents the critical power supply and demand difference, represents the historical dispatching duration of the critical energy storage system, It represents the impact factor of the energy storage system dispatch demand assessment corresponding to the set historical power supply and demand difference. Indicates the impact factor of the energy storage system dispatch demand assessment corresponding to the set historical dispatch duration of the energy storage system, It represents the impact factor of the energy storage system dispatch demand assessment corresponding to the set expected power supply and demand difference.

[0055] like Figure 2 As shown, when When , the functional relationship between the maximum value of the historical monitored power supply and demand difference and the energy storage system dispatch demand evaluation index is shown in curve a; when When , the functional relationship between the maximum value of the historical monitored power supply and demand difference and the energy storage system dispatch demand evaluation index is shown in curve b; when When , the functional relationship between the maximum value of the historical monitored power supply and demand difference and the energy storage system dispatch demand evaluation index is shown in curve c. The energy storage system dispatch demand evaluation index is jointly determined by the historical power supply and demand difference, the historical dispatch duration of the energy storage system, and the expected power supply and demand difference. The larger the historical power supply and demand difference, the historical dispatch duration of the energy storage system, and the expected power supply and demand difference, the larger the corresponding energy storage system dispatch demand evaluation index, indicating that the demand construction scale of the energy storage system is larger.

[0056] In this embodiment, the expected power supply and demand difference refers to the absolute value of the difference between the demand load and the estimated power generation in the power planning area.

[0057] In this embodiment, the energy storage system dispatch demand evaluation index is used to quantitatively evaluate the demand for power dispatch of the energy storage system, making the evaluation of the energy storage system dispatch demand more quantitative and intuitive, and facilitating targeted planning and adjustment based on the evaluation results. The formula comprehensively considers the historical power supply and demand difference, the historical dispatch duration of the energy storage system, and the expected power supply and demand difference, and can more comprehensively and accurately evaluate the energy storage system dispatch demand in the power planning area. Flexible adjustment of the influencing factors in the formula according to actual needs can reflect the different weights and importance of different factors in the evaluation. At the same time, by using logarithmic functions for calculation, the continuity and smoothness of the calculation results are guaranteed.

[0058] It should be understood that in this embodiment, the value range of the energy storage system scheduling demand degree assessment influencing factor corresponding to the historical power supply and demand difference, the historical scheduling duration of the energy storage system, and the expected power supply and demand difference is between 0 and 1. A mapping table can be established based on the historical data of the energy storage system scale to determine the impact of the historical power supply and demand difference, the historical scheduling duration of the energy storage system, and the expected power supply and demand difference on the scale of the energy storage system.

[0059] In a specific embodiment, by analyzing the difference between power supply and demand, the imbalance between power supply and demand can be accurately grasped, so as to formulate targeted adjustment strategies, more accurately predict future power demand, optimize power resource allocation, and improve power utilization efficiency. At the same time, the analysis of the difference between power supply and demand helps to timely discover potential problems in the power system, such as equipment failure and uneven load, so as to take measures to solve them and improve the stability of the power system.

[0060] In this embodiment, by analyzing the historical demand power dispatch time, the law of power demand changes can be discovered, providing a more scientific basis for power production, transmission and distribution. By analyzing the historical demand power dispatch time, the response capacity of the power system in different seasons and different time periods can be evaluated, providing strong support for the planning, construction and operation of the power system, helping to predict future supply and demand trends and avoid power shortages or surpluses.

[0061] The new energy vehicle usage data in the power planning area is obtained, and the virtual energy storage compensation parameters in the power planning area are obtained through comprehensive analysis.

[0062] Specifically, the virtual energy storage compensation parameters of the power planning area are obtained through comprehensive analysis. The specific analysis process is as follows: the new energy vehicle usage data of the power planning area, including the number of operating new energy vehicles in the power planning area and user vehicle usage habit data.

[0063] In this embodiment, an operating new energy vehicle refers to a new energy vehicle that is in service and has complete driving capabilities and functionality.

[0064] Based on the user's car usage habit data, the virtual energy storage regulation capacity evaluation index of the power planning area is obtained after processing, and the virtual energy storage compensation parameters of the power planning area are obtained through comprehensive analysis.

[0065] In a specific embodiment, the user's vehicle usage habit data includes the battery capacity and charging rate of each operating new energy vehicle in the power planning area, and the virtual energy storage regulation capacity influencing factor corresponding to the set battery capacity and charging rate is obtained from the power planning database, and the critical battery capacity and critical charging rate are obtained from the power planning database. The virtual energy storage regulation capacity evaluation index of the power planning area is analyzed and obtained. The specific numerical expression is: ; In the formula, represents the evaluation index of the virtual energy storage regulation capacity of the power planning area, r represents the number of each operating new energy vehicle, r=1,2,3,...,h, h represents the total number of operating new energy vehicles, represents the battery capacity of the rth operating new energy vehicle, represents the battery capacity of the rth operating new energy vehicle, represents the critical battery capacity, represents the critical charging rate, Indicates the virtual energy storage regulation capability impact factor corresponding to the set battery capacity, Indicates the impact factor of the virtual energy storage regulation capability corresponding to the set charging rate.

[0066] It should be understood that the value range of the virtual energy storage regulation capability influencing factor corresponding to the battery capacity and charging rate is between 0 and 1, and a mapping set can be established based on the virtual energy storage regulation historical data to determine the impact of the battery capacity and charging rate on the virtual energy storage regulation capability.

[0067] The virtual energy storage regulation capability evaluation index is used to quantitatively evaluate the power regulation capability of new energy vehicles as virtual energy storage systems in the power planning area. The virtual energy storage regulation capability evaluation index is jointly determined by the battery capacity and the charging rate. The larger the battery capacity and the charging rate, the larger the corresponding virtual energy storage regulation capability evaluation index, indicating that the power regulation capability of the new energy vehicle as a virtual energy storage system is stronger.

[0068] It should be understood that in this embodiment, the battery capacity and charging rate are analyzed. The larger the battery capacity, the more electricity it can store and discharge, and the greater its contribution to the regulation of the power grid. The charging and discharging speed of the electric vehicle battery determines the speed at which it responds to the needs of the power grid. Electric vehicles with fast charging and discharging capabilities can participate in the regulation of the power grid more quickly.

[0069] In a specific embodiment, the virtual energy storage compensation influencing factor corresponding to the set number of new energy vehicle users and the virtual energy storage regulation capability evaluation index is obtained from the power planning database, and the critical number of new energy vehicle users is obtained from the power planning database. The virtual energy storage compensation parameter of the power planning area is obtained through comprehensive analysis. The specific numerical expression is: ; In the formula, represents the virtual energy storage compensation parameter of the power planning area, Indicates the number of new energy vehicles in operation in the power planning area, represents the critical number of new energy vehicle users, It represents the evaluation index of virtual energy storage regulation capability in the power planning area. Indicates the virtual energy storage compensation impact factor corresponding to the set number of new energy vehicle users, It represents the virtual energy storage compensation impact factor corresponding to the set virtual energy storage regulation capability evaluation index.

[0070] It should be understood that in this embodiment, the value range of the virtual energy storage compensation impact factor corresponding to the number of new energy vehicle users and the virtual energy storage regulation capability evaluation index is between 0 and 1. A mapping set can be established based on the historical data of vehicle-grid interaction to determine the impact of the number of new energy vehicle users and the virtual energy storage regulation capability evaluation index on the virtual energy storage compensation.

[0071] In this embodiment, the virtual energy storage compensation parameter is used to quantitatively evaluate the degree of optimization of the energy storage system by the scale of new energy vehicles in the power planning area. The virtual energy storage compensation parameter is jointly determined by the number of new energy vehicle users and the virtual energy storage regulation capacity evaluation index. The larger the number of new energy vehicle users and the virtual energy storage regulation capacity evaluation index, the larger the corresponding virtual energy storage compensation parameter, indicating that the new energy vehicle as a virtual energy storage has a higher degree of optimization for the energy storage system construction.

[0072] Specifically, the energy storage system demand construction scale data of the power planning area is matched, and the specific process is: the energy storage system dispatch demand degree assessment index of the power planning area is compared with the energy storage system demand construction scale data corresponding to each energy storage system dispatch demand degree assessment index interval stored in the power planning database, so as to obtain the energy storage system demand construction scale data of the power planning area, wherein the energy storage system demand construction scale data includes the energy storage capacity and energy storage power of the energy storage system.

[0073] The energy storage system demand construction scale data in the power planning area is optimized according to the virtual energy storage compensation parameters in the power planning area.

[0074] Specifically, the energy storage system demand construction scale data of the power planning area is optimized according to the virtual energy storage compensation parameters of the power planning area. The specific process is: the virtual energy storage compensation parameters of the power planning area are compared one by one with the optimizable energy storage capacity and optimizable energy storage power corresponding to each virtual energy storage compensation parameter interval stored in the power planning database to obtain the optimizable energy storage capacity and optimizable energy storage power of the power planning area, and the energy storage system demand construction scale data of the power planning area is optimized according to the optimizable energy storage capacity and optimizable energy storage power of the power planning area.

[0075] It should be understood that the optimizable energy storage capacity and optimizable energy storage power in this embodiment refer to the scale of the energy storage system that can be replaced when the new energy vehicle acts as a virtual energy storage in the vehicle-grid interaction, and the corresponding energy storage system investment cost is reduced according to the scale of the energy storage system that can be replaced, thereby achieving grid investment optimization.

[0076] In a specific embodiment, the present invention provides a grid investment optimization method based on big data analysis, which comprehensively considers factors such as the charging demand and discharge capacity of electric vehicles and the power balance of the grid, determines the optimal construction scale of the energy storage system, and can more accurately predict future power demand and supply conditions, providing a more scientific basis for grid investment optimization.

[0077] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the present invention, they should all fall within the protection scope of the present invention.

Claims

1. A power grid investment optimization method based on big data analysis, characterized in that: include: The meteorological data of the power planning area is monitored and processed to obtain the time series function of the power generation of the new energy stations in the power planning area. The demand load is predicted based on the historical load data of the power planning area, and the demand construction scale data of the energy storage system in the power planning area is obtained through comprehensive analysis. Obtain the new energy vehicle usage data in the power planning area, and conduct comprehensive analysis to obtain the virtual energy storage compensation parameters in the power planning area; The energy storage system demand construction scale data in the power planning area is optimized according to the virtual energy storage compensation parameters in the power planning area.

2. A power grid investment optimization method based on big data analysis according to claim 1, characterized in that: The processing obtains the time series function of the power generation of the new energy stations in the power planning area, and the specific process is: Deploy several environmental monitoring points to collect solar radiation and wind speed at each environmental monitoring point in the power planning area, obtain the power generation impact weight factors corresponding to the set solar radiation and wind speed from the power planning database, and conduct comprehensive analysis to obtain the power generation evaluation index of the power planning area; The power generation evaluation indicators of the power planning area are compared one by one with the estimated power generation corresponding to each power generation evaluation indicator interval stored in the power planning database to obtain the estimated power generation of the power planning area. At the same time, the historical data of the power generation of the new energy sites in the power planning area are obtained, and the time series function of the power generation of the new energy sites in the power planning area is obtained through curve fitting.

3. The power grid investment optimization method based on big data analysis according to claim 1 is characterized by: The specific process of predicting the demand load based on the historical load data of the power planning area is as follows: According to the historical load data of the power planning area, the historical load time series function of the power planning area is obtained by curve fitting; Deploy several historical monitoring time points, obtain the historical load at each historical monitoring time point, and obtain the demand load in the power planning area after processing.

4. The method for optimizing power grid investment based on big data analysis according to claim 3 is characterized in that: The comprehensive analysis obtains the energy storage system demand construction scale data for the power planning area. The specific analysis process is as follows: Compare and analyze the time series function of the power generation of new energy stations in the power planning area with the time series function of the historical load, obtain the historical monitored power supply and demand difference, and extract the maximum value of the historical monitored power supply and demand difference; Extract the power supply and demand difference threshold from the power planning database. If the power supply and demand difference in a certain time period is greater than or equal to the power supply and demand difference threshold, mark the time period as the demand power dispatch time period, count the historical demand power dispatch time periods, and mark the sum result as the historical dispatch duration of the energy storage system. A comprehensive analysis is conducted to obtain an energy storage system dispatch demand assessment index for the power planning area, and the energy storage system demand construction scale data for the power planning area is matched.

5. The method for optimizing power grid investment based on big data analysis according to claim 1, characterized in that: The comprehensive analysis obtains the virtual energy storage compensation parameters of the power planning area. The specific analysis process is as follows: The new energy vehicle usage data in the power planning area, including the number of new energy vehicles in operation in the power planning area and the vehicle usage habit data of users; Based on the user's car usage habit data, the virtual energy storage regulation capacity evaluation index of the power planning area is obtained after processing, and the virtual energy storage compensation parameters of the power planning area are obtained through comprehensive analysis.

6. The method for optimizing power grid investment based on big data analysis according to claim 4, characterized in that: The matching obtains the energy storage system demand construction scale data of the power planning area, and the specific process is as follows: The energy storage system dispatch demand degree assessment index of the power planning area is compared one by one with the energy storage system demand construction scale data corresponding to each energy storage system dispatch demand degree assessment index interval stored in the power planning database to obtain the energy storage system demand construction scale data of the power planning area, wherein the energy storage system demand construction scale data includes the energy storage capacity and energy storage power of the energy storage system.

7. The method for optimizing power grid investment based on big data analysis according to claim 5, characterized in that: The specific process of optimizing the energy storage system demand construction scale data in the power planning area according to the virtual energy storage compensation parameters in the power planning area is as follows: The virtual energy storage compensation parameters of the power planning area are compared one by one with the optimizable energy storage capacity and optimizable energy storage power corresponding to each virtual energy storage compensation parameter interval stored in the power planning database to obtain the optimizable energy storage capacity and optimizable energy storage power of the power planning area, and the energy storage system demand construction scale data of the power planning area is optimized according to the optimizable energy storage capacity and optimizable energy storage power of the power planning area.

8. The method for optimizing power grid investment based on big data analysis according to claim 5, characterized in that: The processing obtains the virtual energy storage regulation capability evaluation index of the power planning area, and the specific process is: The user vehicle usage habit data, including the battery capacity and charging rate of each operating new energy vehicle in the power planning area, is comprehensively analyzed to obtain a virtual energy storage regulation capacity evaluation index for the power planning area.

9. The method for optimizing power grid investment based on big data analysis according to claim 4, characterized in that: The comprehensive analysis obtains the energy storage system dispatch demand evaluation index of the power planning area, and also includes: The energy storage system dispatch demand assessment factor corresponding to the set historical power supply and demand difference, the historical dispatch time of the energy storage system and the expected power supply and demand difference is obtained from the power planning database, and the critical power supply and demand difference and the critical energy storage system historical dispatch time are extracted from the power planning database. The energy storage system dispatch demand assessment index of the power planning area is obtained through comprehensive analysis. The specific numerical expression is: ; In the formula, Represents the energy storage system dispatch demand evaluation index in the power planning area, Indicates the maximum value of the historical monitored power supply and demand difference. Indicates the historical dispatching duration of the energy storage system, represents the estimated power generation in the power planning area, represents the demand load in the power planning area, represents the critical power supply and demand difference, represents the historical dispatching duration of the critical energy storage system, It represents the impact factor of the energy storage system dispatch demand assessment corresponding to the set historical power supply and demand difference, Indicates the impact factor of the energy storage system dispatch demand assessment corresponding to the set historical dispatch duration of the energy storage system, It represents the impact factor of the energy storage system dispatch demand assessment corresponding to the set expected power supply and demand difference.

10. The method for optimizing power grid investment based on big data analysis according to claim 5, characterized in that: The comprehensive analysis to obtain virtual energy storage compensation parameters in the power planning area also includes: The virtual energy storage compensation influencing factors corresponding to the set number of new energy vehicle users and the virtual energy storage regulation capacity evaluation index are obtained from the power planning database, and the critical number of new energy vehicle users is obtained from the power planning database. The virtual energy storage compensation parameters of the power planning area are obtained through comprehensive analysis. The specific numerical expression is: ; In the formula, represents the virtual energy storage compensation parameter of the power planning area, Indicates the number of new energy vehicles in operation in the power planning area, represents the critical number of new energy vehicle users, It represents the evaluation index of virtual energy storage regulation capability in the power planning area. Indicates the virtual energy storage compensation impact factor corresponding to the set number of new energy vehicle users, It represents the virtual energy storage compensation impact factor corresponding to the set virtual energy storage regulation capability evaluation index.

Citation Information

Patent Citations

  • Active distribution network dynamic planning method

    CN110119886A

  • Distributed cloud energy storage-based power grid investment planning scheme generation method and system

    CN113793022A

  • Energy grid planning method based on dual-carbon target

    CN114186792A

  • Construction method of coordinated optimization model and power distribution network planning method

    CN115276111A

  • Regional comprehensive energy supply and demand scheduling method and system containing large-scale electric vehicles

    CN115310749A

Cited By

  • Intelligent power grid planning coordination evaluation method

    CN120373952A