Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

42 results about "Project cycle" patented technology

Project Resource Allocation Method and Allocation System Based on Dynamic Scheduling

The present invention provides a project resource allocation method and an allocation system based on dynamic scheduling, belonging to the field of intelligent technologies. The allocation method includes: inputting project resources, a task set of a project, and a required resource set corresponding to the task set into a dynamic scheduling model of the project; according to the dynamic scheduling model, determining a set of feasible allocation schemes for the project, where each feasible allocation scheme can enable the available resources of the project resources at any time sequence to meet the required resources corresponding to multiple second tasks in a processing state at this time sequence; and determining the feasible allocation scheme with the minimum completion time in the set of feasible allocation schemes as the target allocation scheme. The method designed by the present invention can, in an environment of resource shortage competition, form different critical paths through different resource allocation schemes, compare all the formed critical paths, and find a path with the earliest completion time as the optimal path, so as to achieve the purpose of making full use of resources and shortening the project cycle.
Owner:HANGZHOU WANLAN TECH CO LTD

Fabricated building informatization construction method and system

The invention relates to the technical field of building information model application, in particular to a fabricated building informatization construction method and system. According to the method, the BIM design model is constructed, the component information is obtained, the construction progress plan and the BIM design model are associated, the component production plan is obtained, the purchase plan is made according to the component production plan, and the project cost is estimated. And then obtaining the actual cost of each stage according to the project period, designing a deviation threshold value, judging that the cost deviation is unreasonable when the deviation value of the actual cost of the stage and the estimated project cost reaches the deviation threshold value, and predicting the cost change of the subsequent stage of the project according to historical data and the raw material price change. And finally, the purchase plan and the component production plan are adjusted according to the prediction result, and the project cost is estimated again. Through the scheme, the whole-process monitoring and adjustment of the assembly building cost can be effectively realized, and the accuracy and efficiency of project cost management are improved.
Owner:CHONGQING CONSTR RESIDENTIAL ENG +1

Bridging method and system for cross-language interface of KaihongOS, terminal and storage medium

The invention relates to the technical field of computer software, and discloses a bridging method and system for a cross-language interface of KaihongOS, a terminal and a storage medium. The method comprises the steps that an interface definition file is analyzed, and function declaration information of a target interface is obtained; analyzing a native interface definition file to obtain implementation information of a native interface corresponding to the target interface; and based on the function declaration information and the implementation information, according to a preset bridging rule, automatically generating a bridging function code conforming to a target operation environment, and bridging a cross-language interface through the bridging function code. According to the method, through automatic analysis and code generation, the bridging function code meeting the target operation environment is automatically generated by improving the code quality, and repeated labor and potential errors in manual writing are avoided. A preset bridging rule ensures the consistency and maintainability of codes, the technical threshold can be effectively reduced, and the project cycle is shortened.
Owner:深圳开鸿数字产业发展有限公司

Project data intelligent distribution system and method based on artificial intelligence

ActiveCN120297907AOffice automationResource assignmentProject cycle
The invention discloses an intelligent project data distribution system and method based on artificial intelligence, and relates to the technical field of data distribution, and the system comprises a task feature sub-project division module, a resource category marking module, a conflict relation analysis module, a project resource distribution strategy making module and an early warning response module. The task feature sub-project division module is used for dividing the whole project period into a plurality of task feature sub-projects according to the task features recorded in each project content; the resource category marking module is used for dividing independent project resources and non-independent project resources; the conflict relation analysis module is used for generating conflict event types mapped by different conflict relations; the project resource allocation strategy making module is used for analyzing an optimal project resource allocation strategy required by a corresponding type of conflict event; and the early warning response module is used for matching the optimal project resource allocation strategy to carry out early warning response when the same project content is implemented and the same type of conflict events exist.
Owner:JIANGSU SUHAO CLOUD BUSINESS CO LTD +1

Open source project external developer identification method, device and equipment

The invention relates to an open source project external developer identification method, device and equipment, and the technology focuses on the role evolution of a developer in a project period, and can automatically and efficiently identify when the developer participates in the identity of an external contributor and when the developer is converted into a project internal developer. The technology deeply analyzes the universality of role conversion of developers in the open source community, so that the accuracy of identifying the external developers is remarkably improved, and the technology is suitable for identifying the external developers of the open source software project in the open source development community. In addition, external developer identification challenges brought by a large number of projects and users in an open source development community can be effectively handled, and the feasibility and efficiency of large-scale identification tasks are ensured.
Owner:NAT UNIV OF DEFENSE TECH

Project process and product demand information fusion method and device and medium

The invention discloses a project process and product demand information fusion method and device and a medium, and relates to the field of data processing. The method comprises the following steps: obtaining product demand information, decomposing the product demand information, and constructing a demand hierarchy BOM tree formed by a plurality of demand nodes; configuring a demand type and a predicted working hour for each demand node in the demand hierarchy BOM tree; based on the standard development process template, performing WBS decomposition on the target project to generate a plurality of project tasks; associating a demand node in the demand hierarchy BOM tree with the project task, and matching a corresponding standard development process template for the project task based on a demand type corresponding to the demand node; and calculating the predicted working hours of the demand nodes associated with each project task based on the predicted working hours of the sub demand nodes and the total predicted working hours of the parent demand nodes, and setting a project period for each project task. By implementing the technical scheme provided by the invention, the planning accuracy of the project plan is improved.
Owner:BEIJING ANDAVILLE INFORMATION TECH CO LTD

A network packet capturing method

The application relates to a network message packet capturing method and belongs to the technical field of communication. The method can facilitate a developer to process special network messages in a user state, can process common network protocol messages by using an operating system network protocol stack, is easy to debug a program, reduces the development cost of special network equipment, and shortens a project cycle. Therefore, the application program packet capturing method has the characteristics of high efficiency, low time delay, self-controllability and the like, and can fully utilize the network protocol stack of the operating system to process some common messages. The method is suitable for being applied to various network equipment and has a good market prospect.
Owner:BEIJING INST OF COMP TECH & APPL

A calibration method and device for constant speed mode control based on power pre-control

The application discloses a kind of based on power pre-control's constant speed mode control's calibration method and device, greatly reduce the calibration time in customer field, improve the project test schedule, shorten project cycle, provide the buffer time for solving the problem of contingency.The application includes: obtaining the flight state instruction signal sent by flight control simulator, the flight state instruction signal contains the target speed of preset engine;According to the flight state instruction signal, control the engine to run to the target speed;According to the engine loading of electric power dynamometer;The actual running speed of the engine is obtained;Judge the speed difference of the actual running speed and the target speed, if no, then the running speed of the engine is adjusted to the target speed by PID regulator;The current running speed of the engine is obtained again;According to the current running speed, calculate target torque.
Owner:GUANGXI YUCHAI MASCH CO LTD

Using machine learning to prevent content IP issues at different stages of the project lifecycle

Embodiments of the present disclosure relate to preventing content intellectual property issues at different stages of a project cycle using machine learning. A device that can receive content data and metadata, the content data identifies content created by a user, and the metadata is associated with the content. The device can receive rule data, the rule data identifies rules associated with the use of content. The device can use metadata to generate a digital DNA signature for content in near real time. The device can store the relationship between rule data, content, digital DNA signature, and digital DNA signature in a repository. The device can receive new content and new metadata from a client device, the new content is generated based on the specific content of the content data, and the new metadata is associated with the new content. The device can use the new metadata to generate a new digital DNA signature for the new content. The device can process the new digital DNA signature, rule data, and digital DNA signature to determine whether the new content violates one or more rules of the rule data.
Owner:ACCENTURE GLOBAL SOLUTIONS LTD

Engineering file digital generation and management method and system, and electronic equipment

The invention relates to the technical field of project file digital generation and management scheme design, in particular to a project file digital generation and management method and system and electronic equipment. The method comprises the steps of obtaining subitem project names of a target project; obtaining preset preposed data corresponding to each preset work task name of each subentry project; and generating a work file of each work task according to the obtained preset preposition data. The invention provides a comprehensive and systematic digital solution, and has the following remarkable beneficial effects of improving file quality, reducing personal errors, improving file generation efficiency, shortening a project period, optimizing version management, realizing whole-course tracing, supporting efficient cooperation of multiple persons, reducing communication cost, dynamically adapting to project requirements, and improving project quality. The method achieves the timely updating and maintenance of files, comprehensively covers the types of project files, meets the diversified demands, drives the decision through data, improves the project management level, promotes the digital transformation of the engineering industry, and improves the industrial competitiveness.
Owner:邓克凡

Big Data-Based Project Progress Monitoring Methods, Devices, and Electronic Equipment

This invention discloses a project progress monitoring method, device, and electronic device based on big data, relating to the field of big data technology. The method includes: acquiring multiple historical versions of project data tables for a target project; analyzing the project's achievement of preset requirements based on project cycle data in each project data table to obtain a requirement achievement scale parameter table; determining the percentage of requirement achievement scale parameters for each cycle and identifying the first benchmark data for the target project in each cycle; determining the second benchmark data for the target project in each cycle based on the expected total scale parameter and task detail data in the project data table; monitoring the first and second progress trend data of the target project, and issuing a risk warning when the first progress trend data is lower than the first benchmark data or the second progress trend data is lower than the second benchmark data.
Owner:INDUSTRIAL AND COMMERCIAL BANK OF CHINA

Command information system service visualization development method and device

The invention relates to the technical field of software development, in particular to a command information system service visualization development method, which comprises the following steps of: generating an XML (Extensible Markup Language) configuration file through a command information system software development template; a service visualization secondary development tool is adopted to configure the XML configuration file, and XML file information is generated; reading the XML file information through a template comprehensive processing unit in the command information system software development template, and generating an information processing derivation class by inheriting the basic message processing class based on XML configuration information; and processing a specific type of message through each information processing derivative subclass in the information processing derivative class to generate an information stream. By applying the method, a rapid and efficient development process can be realized through service templating; the development process is optimized, the project period is shortened, and the development efficiency is improved; through visual information flow display, rapid positioning and problem solving can be realized.
Owner:NO 15 INST OF CHINA ELECTRONICS TECH GRP

Scientific and technological innovation project progress cycle management method and system

The invention provides a progress cycle management method and system for a scientific and technological innovation project, and relates to the technical field of project cycle management, and the method comprises the steps: obtaining shared resource scheduling information of the scientific and technological innovation project, and extracting resource scheduling data of each progress cycle from the shared resource scheduling information; determining the data traceability of each progress cycle through the corresponding resource scheduling data, and determining the cycle benefit coefficient of each progress cycle according to the corresponding data traceability and the project science and technology innovation information generated by the progress cycle; obtaining scheduling competition data, constructing a competition distribution domain of the shared resources by using the scheduling competition data, and performing benefit disturbance on the competition distribution domain according to the benefit coefficient of each period to obtain a disturbance distribution sequence; and adjusting the shared resource allocation of each progress period in the scientific and technological innovation project based on the disturbance allocation sequence, so that the problem of priority conflict of the progress periods can be solved, the shared resources are effectively allocated, and the resource allocation credibility in the scientific and technological innovation project is improved.
Owner:HUBEI FANGYUAN DONGLI ELECTRIC POWER SCI & RES LTD CO +2

A Progress Cycle Management Method and System for Scientific and Technological Innovation Projects

The present application provides a method and system for progress cycle management of scientific and technological innovation projects, relating to the technical field of project cycle management. The shared resource scheduling information of scientific and technological innovation projects is obtained, and the resource scheduling data of each progress cycle is extracted from the shared resource scheduling information; the data traceability degrees of each progress cycle are respectively determined through the corresponding resource scheduling data, and the cycle benefit coefficients of each progress cycle are determined according to the corresponding data traceability degrees and the project scientific and technological innovation information generated by the progress cycle; the scheduling competition data is obtained, the competition allocation domain of the shared resources is constructed using the scheduling competition data, and the competition allocation domain is subjected to benefit perturbation based on each cycle benefit coefficient to obtain a perturbed allocation sequence; the allocation of the shared resources in each progress cycle of the scientific and technological innovation project is adjusted based on the perturbed allocation sequence. The present application can solve the problem of priority conflicts in progress cycles, thereby effectively allocating shared resources to improve the credibility of resource allocation in scientific and technological innovation projects.
Owner:HUBEI FANGYUAN DONGLI ELECTRIC POWER SCI & RES LTD CO +2

A data labeling task distribution method, device, equipment and medium

The application discloses a data labeling task distribution method and device, equipment and medium, and relates to the technical field of task distribution. The method comprises the following steps: obtaining labeling task data packets and project configuration information, splitting the labeling task data packets according to project distribution characteristics to obtain at least one batch of first to-be-distributed task sets; obtaining labeling work orders, and generating second to-be-distributed tasks according to the labeling work orders; obtaining repair work orders fed back after the second to-be-distributed tasks are audited, and generating third or fourth to-be-distributed tasks according to the repair work orders; and packaging the first, second, third and / or fourth to-be-distributed tasks into a current batch of work packages according to real-time team states, real-time individual states and permission information, and distributing the work packages to workers. The application considers multiple factors during task distribution, efficiently matches tasks and workers, realizes multi-dimensional matching and dynamic resource distribution, shortens the average project cycle, and significantly improves delivery efficiency.
Owner:HANG ZHOU MINDFLOW TECH CO LTD

Verification methods, apparatus, storage media and equipment for backpressure flow control

This application provides a verification method, apparatus, storage medium, and device for backpressure flow control. The method includes: acquiring a backpressure model, which includes a backpressure component, an excitation component, and a monitoring component. The backpressure component is communicatively connected to the excitation component and the monitoring component through corresponding interfaces. The backpressure component includes modules corresponding to various backpressure types. After initiating simulation verification of backpressure flow control, in response to an excitation signal sent by the excitation component to the backpressure component, the backpressure component is triggered to execute a corresponding backpressure function. The monitoring component acquires the status information of the backpressure component, and the simulation ends after the monitoring component acquires the excitation signal. This method eliminates the reliance on RTL code delivery for backpressure process verification, allowing for earlier verification work, improving project verification efficiency, and shortening the project cycle.
Owner:格创通信(浙江)有限公司

Research and development cost proportion automatic calculation method and system based on artificial intelligence

The invention relates to an artificial intelligence-based research and development cost proportion automatic calculation method and system, and belongs to the technical field of research and development cost prediction. The method comprises the steps that historical research and development project data are collected, and a research and development project data set is constructed through preprocessing; according to the research and development project data set, constructing a research and development cost proportion prediction model through an improved neural network algorithm; obtaining current research and development project data, the research and development project data including but not limited to a project type, a project scale, a project period, technical difficulty, research and development cost and a research and development team scale, and obtaining a current research and development cost proportion through the research and development cost proportion prediction model according to the research and development project data, the research and development cost proportion is rapidly and accurately predicted, calculation result inconsistency caused by personal subjective judgment differences is reduced, meanwhile, manpower and time are saved, and the decision-making efficiency of power grid enterprises is improved.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Method, device and equipment for identifying open source project external developers

The application relates to an open source project external developer identification method, device and equipment, which focuses on the role evolution of developers in a project cycle, can automatically and efficiently identify when the developers participate as external contributors and when the developers change into internal developers of the project. The technology deeply analyzes the universality of the role conversion of the developers in the open source community, thereby significantly improving the accuracy of identifying the external developers, and is suitable for identifying the external developers of the open source software project in the open source development community. In addition, the technology can effectively deal with the external developer identification challenge brought by a large number of projects and users in the open source development community, and ensures the feasibility and efficiency of the large-scale identification task.
Owner:NAT UNIV OF DEFENSE TECH

Method, system and equipment for distinguishing interior and exterior of building model and storage medium

The embodiment of the invention provides a method, system and equipment for distinguishing indoor and outdoor of a building model and a storage medium, and relates to the technical field of computer graphics, and the method comprises the steps: carrying out voxelization processing based on the building model, and obtaining a plurality of solid cylinders and air cylinders; according to the number of adjacent air cylinders around each air cylinder, determining that the air cylinder is a middle cylinder or a boundary cylinder; calculating the nearest distance from each middle cylinder to the boundary cylinder to obtain a distance field value; dividing the middle cylinders and the boundary cylinders into a plurality of initial areas according to the distance field numerical values; and after a closed area is determined from the plurality of initial areas, obtaining an indoor combined area of the building. According to the method, the entity cylinder and the air cylinder of the building model are constructed, the analysis of the middle cylinder and the boundary cylinder of the air cylinder, the calculation of the distance field and the judgment of the closed area are combined, and the indoor area is automatically identified and merged, so that the human input is obviously reduced, the method is easy to adapt to the development process of rapid iteration, and the project period is obviously shortened.
Owner:BEIJING PIXEL SOFTWARE TECH

Performance analysis method, device and equipment and computer readable storage medium

PendingCN121233413AFunctional testingSoftware emulationProject cycle
The invention provides a performance analysis method and device, electronic equipment and a computer readable storage medium, and the method comprises the steps: obtaining a test instruction sequence, and converting the test instruction sequence into a physical signal and a program calling signal; the test instruction sequence comprises a plurality of test instructions, and the test instructions are used for testing the function of the to-be-tested design; the physical signal is matched with a hardware simulation model to be tested and designed; the program calling signal is matched with a to-be-tested designed software simulation model; driving a hardware simulation model of the to-be-tested design to operate according to the physical signal to obtain first operation performance data of the to-be-tested design; driving a software simulation model of the to-be-tested design to run according to the program calling signal to obtain second running performance data of the to-be-tested design; and determining a performance analysis result of the to-be-tested design according to the first operation performance data and the second operation performance data. According to the embodiment of the invention, the total project period can be shortened, the performance analysis efficiency is improved, and the performance analysis complexity is reduced.
Owner:BEIJING INSTITUTE OF OPEN SOURCE CHIP

Project resource allocation method and allocation system based on dynamic scheduling

The invention provides a project resource allocation method and allocation system based on dynamic scheduling, and belongs to the technical field of intelligence. The allocation method comprises the following steps: inputting project resources, a task set of a project and a demand resource set corresponding to the task set into a dynamic scheduling model of the project; according to the dynamic scheduling model, a feasible allocation scheme set of the project is determined, and each feasible allocation scheme enables available resources of project resources on any time sequence to meet demand resources corresponding to a second task, in a processing state, of the multiple tasks under the time sequence; and determining the feasible allocation scheme with the minimum completion time in the feasible allocation scheme set as a target allocation scheme. According to the method designed by the invention, different key paths can be formed through different resource allocation schemes in a resource shortage competition environment, all formed key paths are compared, and a path with earliest completion time is found out as an optimal path, so that the purposes of fully utilizing resources and shortening a project period are achieved.
Owner:HANGZHOU WANLAN TECH CO LTD

Method for extracting tcp session message content according to features based on python

The invention discloses a method for extracting tcp session message content according to features based on python, and the method comprises the following steps: extracting each piece of field information of a tcp data message header according to a tcp protocol; according to the method, different sessions are identified through field combinations, code values corresponding to the fields are calculated, complete tcp session content is recombined, the sessions are further analyzed based on application features, and therefore the purposes of rapidly analyzing tcp messages and extracting message content are achieved. The method effectively solves the problems that manual participation is needed in the whole process of a traditional package capture analysis process, manual checking is needed for data correctness checking, the process is tedious and time-consuming and excessively depends on manual analysis, the human input in the software development process can be greatly reduced, the development cost of a project period is saved, and the development efficiency is improved. The error rate of manual data checking is reduced, the working efficiency of employees is improved, and human resources are released to expand other business functions.
Owner:NANJING BALANCE NETWORK TECH CO LTD

Program development method, device, system and equipment

The invention discloses a program development method, device, system and equipment. The method comprises the following steps: obtaining page transformation demand information; according to the page transformation demand information, generating a page transformation demand document; and according to the page transformation demand document, generating a transformed page program code. By adopting the processing mode, tool and capability differences among roles such as a product user, a design user and a front-end developer are eliminated, boundaries of a product role, a design role and a front-end role are obscured, cross-role efficient collaboration is realized, an automatic path of a front-end code is directly generated from requirements, and the efficiency is improved. The end-to-end automatic development link from the demand to the program code is realized, the manual repeated operation in the production and research cooperation is reduced, such as the iteration time consumption of 1-N products and the upstream and downstream repeated communication cost, and the project period is compressed; therefore, the production and research cooperation efficiency can be effectively improved, so that the program development efficiency is improved.
Owner:ALIBABA (CHINA) CO LTD

Layout collaborative design method for super-large-scale wafer-level substrate

The invention discloses a Layout collaborative design method for a super-large-scale wafer-level substrate, and the method comprises the steps: loading all devices into a substrate, and enabling a network connection relation to be consistent with a netlist; the devices are arranged according to the network connection relation and the position requirement, and the substrate is divided into corresponding parts through dividing lines according to the number of designers of common design; opening interconnected fly lines of all parts and performing highlighting treatment; a wiring layer of interconnection lines is planned, each designer processes a corresponding part, all other devices are deleted, and a board frame is reserved; enabling the designers to walk the interconnection lines to a segmentation line area, aligning the interconnection lines in a manner of adjusting grid points, and completing the rest of wiring; the designer exports the designed substrates into files matched with the third-party software; placing the lines in each file in a graph in a copying manner; and completely connecting the disconnected interconnection lines by using a third-party software line drawing command. According to the method, in the design process, the jamming condition hardly occurs, the design efficiency is improved, and the project period is shortened.
Owner:58TH RES INST OF CETC

A host module based on MXM

The utility model relates to computer field especially based on MXM's host module. Include: MXM CPU module, MXM connector, MXM carrier board, fastening device, the MXM CPU module edge is made with MXM standard gold finger interface, the MXM connector is fixed in the edge of MXM carrier board through welding mode, fastening device with MXM CPU module is fixed on MXM carrier board, MXM CPU module is inserted with MXM connector through MXM standard gold finger interface, realizes signal transmission. The utility model makes full use of the characteristic that MXM provides convenient replacement MXM CPU module, provides maximum flexibility, shortens project cycle as far as possible, reduces design product difficulty, saves project cost, and the device structure is simple, convenient operation has certain practicality.
Owner:LEYAN TECHNOLOGY (SUZHOU) CO LTD

A command information system service visual development method and device

The application relates to the technical field of software development, in particular to a command information system service visual development method, which comprises the following steps: generating an XML configuration file through a command information system software development template; configuring the XML configuration file by using a service visual secondary development tool to generate XML file information; reading the XML file information through a templateized comprehensive processing unit in the command information system software development template, and generating an information processing derived class by inheriting a basic message processing class based on the XML configuration information; and processing a specific type of message through each information processing derived subclass in the information processing derived class to generate an information flow. By using the method, a quick and efficient development process can be realized through service templating; the development process is optimized, the project cycle is shortened, and the development efficiency is improved; and quick positioning and problem solving can be realized through intuitive information flow display.
Owner:NO 15 INST OF CHINA ELECTRONICS TECH GRP

Comprehensive budgeting method and device based on engineering project and electronic equipment

PendingCN119722359AFinanceText processingProject cycleIndustrial engineering
The invention provides a comprehensive budgeting method and device based on an engineering project and electronic equipment, and relates to the field of engineering budgeting. The method comprises the following steps: acquiring a project period of an engineering project, and dividing the engineering project into various engineering stages according to the project period; obtaining a budget target and a data list of each project stage, and a direct cost list and an indirect cost list corresponding to the data list; according to the budget target, the data list, the direct cost list and the indirect cost list, carrying out cost estimation on each project stage to obtain stage estimation cost, obtaining overall estimation cost according to the stage estimation cost of each project stage, and carrying out budget distribution on each project stage according to the overall estimation cost to obtain each stage budget; integrating the budget of each stage to obtain a comprehensive budget; according to the comprehensive budget, the budgeting summary sheet of the engineering project is obtained, adjustment can be carried out according to the engineering stage, and an enterprise can rapidly quantify and predict the operation result.
Owner:SHANGHAI ORIENTAL INVESTMENT SUPERVISION CO LTD

Method for shortening development cycle of inner and outer plate molds of left and right front vehicle doors

PendingCN119076819Ashorten the design cycleThe cycle is successfully realizedShaping toolsVehicle componentsPunchingProject cycle
The invention provides a method for shortening the development cycle of a mold for inner and outer plates of a left front vehicle door and a right front vehicle door. The method comprises the following steps of S1, OP30 flanging design, OP20 trimming and punching design, OP10 process drawing design and parting line determination, or OP40 punching and side punching separation design, OP30 flanging design, OP20 trimming and punching design and parting line determination; S2, OP10 process drawing design is conducted; s3, a CAE analysis forming test is conducted on the workpiece, and if the requirement is met, structural design is started; and if not, returning to the step S2. The method has the beneficial effects that the mold design period is shortened, 21 days are saved, the efficiency is improved by 35.6%, and it is guaranteed that the ultra-short project period can be smoothly achieved.
Owner:BOTOU XINGDA AUTOMOBILE MOULD MFG CO LTD

Verification device based on standard PIPE interface

The embodiment of the invention discloses a verification device based on a standard PIPE interface, and the device comprises a PIPE switching circuit device which is used for being connected with a PCIe PIPE interface in actual work and a PIPE interface to be tested and designed; the to-be-tested design comprises a PCIe (Peripheral Component Interconnect Express) controller; the controller provides a sideband control signal to the PIPE switching circuit device; the global configuration module is used for configuring the current working mode of the PIPE switching circuit device; based on the current working mode and the sideband control signal, the PIPE switching circuit device can be connected with any physical layer unit. According to the method, the problems of long iteration period, tedious project file version management and the like caused by low PCIe related software verification environment reusability and low PCIe interface verification flexibility in the existing workflow can be solved. Moreover, the universality of the to-be-tested design in different verification environments is effectively improved, the project period is shortened, and the project verification efficiency is improved.
Owner:BEIJING YIXIN YIYU MICROELECTRONICS TECH CO LTD