Construction site project management system of grid smart construction site management and control platform

Active Publication Date: 2017-12-29
北京融通智慧科技集团有限公司
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It is difficult for non-professional controllers to find problems from big data
In addition, manual inspection of projects is time-consuming and labor-intensive, and the statistics are slow and often make mistakes. As a result, the cycle of project management on the construction site and the accuracy of the actual progress data and planned data of the project cannot meet the needs of today's high-speed broadband networks.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction site project management system of grid smart construction site management and control platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] Hereinafter, an embodiment of a construction site project management system of a power grid smart construction site management and control platform of the present invention will be described with reference to the accompanying drawings.

[0049] The examples described here are specific specific implementations of the present invention, and are used to illustrate the concept of the present invention. They are all explanatory and exemplary, and should not be construed as limiting the implementation of the present invention and the scope of the present invention. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include making any obvious replacements for the embodiments described here. and modified technical solutions.

[0050] The accompanying drawings in this specification are schematic di...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction site project management system of a grid smart construction site management and control platform, which includes a project time check module, a project cost check module, a project abnormality alarm module, and a project trend prediction module. The project time check module is used for automatically expecting the construction period and total construction period of sub projects, automatically evaluating a construction period plan input by a user and the delay of the construction period plan, and automatically generating a plan construction period schedule. The project cost check module is used for automatically expecting the cost and total cost of sub projects, automatically evaluating product cost input by a user and the cost overrun, and automatically generating a cost table. The project trend prediction module is connected with the project time check module, and is used for calculating and updating the actual total construction period in real time, issuing an alarm signal for the actual construction period delay, and automatically generating an actual construction period timetable. The project abnormality alarm module sends corresponding alarm information. The system can assist non-professional personnel in making project plans to shorten the project cycle.

Description

technical field [0001] The invention relates to a management and control platform, in particular to a construction site project management system. Background technique [0002] The current project management systems on the market only have simple construction progress recording and retrieval functions. Professionals are required to formulate project plans based on experience, and do not have the function of assisting in planning. It is difficult for non-professional controllers to find problems from big data. In addition, manual inspection of projects is time-consuming and laborious, and the statistical data is slow and often makes mistakes. As a result, the cycle of project management on the construction site and the accuracy of the actual progress data and planned data of the project cannot meet the needs of today's high-speed broadband networks. [0003] Therefore, there is an urgent need in the field for a construction site project management system that can overcome t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q10/04G06Q50/06
CPCG06Q10/04G06Q10/06313G06Q10/103G06Q50/06
Inventor 母春阁母春明苗海颍孙彦杰李启贵
Owner 北京融通智慧科技集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products