Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

74results about How to "Shorten project cycle" patented technology

Batch type refined three-dimensional modeling method of building frame model

InactiveCN106600680AGuaranteed strict fitImprove work efficiency3D modellingPoint cloudAlgorithm
The invention, which belongs to the technical field of model construction, discloses a batch type refined three-dimensional modeling method of a building frame model. The method comprises the following steps: determining a range frame of a batch type refined modeling region of a building; constructing a three-dimensional model; establishing a frame model index; and constructing a model of a batch type refined modeling accessory structure. According to the method, a BSP building model reconstruction method under a DLG building outer contour constraint is put forward; and with the high-plane precision of a DLG, a defect of low precision of a point cloud boundary is overcome, so that strict matching of the main contour of the frame model with the outer contour of the DLG can be realized. On the basis of a one-to-one correspondence relationship among a building DLG base map, a building point type in a range, and a generated model, batch type refined modeling and quality checking of buildings in a large area can be realized and a well-developed production and quality checking working flow can be formed. A model space matching and duplicating method is put forward and base elevation and precise orientation information of the model can be obtained automatically, so that the precise modeling efficiency can be improved.
Owner:星际空间(天津)科技发展有限公司

High-yield reactor for protein production, and production method and application thereof

The invention discloses a high-yield reactor, and a production method and an application thereof. The high-yield reactor comprises a bioreactor and an ATF perfusion apparatus connected with the bioreactor. The protein production method using the high-yield reactor comprises the following steps: 1, connecting the ATF perfusion apparatus with the bioreactor, and completing an offline disinfection or online disinfection program; 2, inoculating seed cells to the bioreactor to a work volume according to the density, and sampling and detecting the number and biochemical indexes of the cells each 24h; 3, starting the ATF apparatus program for perfusion culture when the density of living cells increases to a certain density; and 4, collecting a culture solution in the bioreactor or filtered through hollow fibers in the ATF perfusion apparatus, and purifying to obtain required protein products. The high-yield reactor has the advantages of great shortening of the technological exploitation time of monoclonal antibody or fusion protein expression, production cost reduction, benefiting for the project registering and reporting and the project period shortening, and acceleration of the accomplishment application speeds of the biopharmacy industry.
Owner:WUXI BIOLOGICS CO LTD

Automation version verifying method and system based on B/S structural system

The invention discloses an automation version verifying method and system based on a B/S structural system. The method comprises the following steps: (1) obtaining newest codes from a configuration management tool according to configuration files to generate a new testing edition; (2) building a testing environment according to the preset configuration files, and installing, configuring and starting a system to be tested; (3) backing up basic data according to the configuration files, and emptying existing testing data to enable the system to be in an initialized state as the state submitted to a client; (4) automatically guiding in a test case which needs to be executed in version verification according to the configuration files; (5) selecting to execute the test case performed with version verification according to the configuration files; and (6) generating a test report according to version verification results. The automation version verifying method and system based on the B/S structural system comprises a version generation module, a core control module, a testing environment building module, a data processing module, a version verification case lead-in module, a version verification executing module and a testing report module.
Owner:LANGCHAO ELECTRONIC INFORMATION IND CO LTD

Method for detecting tie-in strip and expansion adhesive materials in CAE pedestrian protection head collision

The present invention discloses a method for detecting tie-in strip and expansion adhesive materials in CAE pedestrian protection head collision. The method has the technical points that: a welding spot data unit of an engine hood, a white body, abdeckung stossfaenger, an engine, a heat sink and front windshield glass, a protection welding data unit of the engine hood, the white body, the abdeckung stossfaenger, the engine, the heat sink and the front windshield glass, an engine hood tie-in strip data unit and an engine hood expansion adhesive data unit are connected with the input end of a data conversion unit by the data conversion unit and the input end of the data conversion unit is also connected with a finite element mesh model; the output end of the data conversion unit is connected with the input end of a CAE acceleration curve acquisition unit sequentially through a vip2 file conversion unit and a CAE simulation analysis unit; measured data in a physical test acquisition unit is also connected with a physical test acceleration curve acquisition unit after being subjected to calculation processing by the finite element mesh model so as to obtain a head acceleration curve; and the output ends of the CAE acceleration curve acquisition unit and the physical test acceleration curve acquisition unit are connected with a comparison unit. Known from comparison, a CAE acceleration obtained by the method disclosed by the present invention is consistent with a physical test curve in trend, and is universal, thereby determining reliability of the method.
Owner:BRILLIANCE AUTO

Detection method of amplitude energy abnormality phenomenon of post-stack data

The invention provides a detection method of an amplitude energy abnormality phenomenon of post-stack data, and belongs to the technical field of petroleum exploration data processing. The method comprises the following steps of dividing the post-stack data according to predetermined time windows; obtaining the amplitude energy value of each seismic trace under each of the time windows, obtaining the amplitude energy value of a whole-work-area seismic trace under each of the time windows, obtaining an energy deviation value of the amplitude energy value of each seismic trace relative to the amplitude energy value of the whole-work-area seismic trace, and taking the energy deviation value of each seismic trace as the energy attribute of the seismic trace; comparing the energy attribute of each seismic trace with the upper / lower limit of a predetermined threshold value to determine whether amplitude energy abnormality occurs or not and which type of amplitude energy abnormality occurs. By applying the detection method, the amplitude energy abnormality phenomenon can be evaluated objectively in a qualitative and quantitative way; moreover, the overall and local energy abnormality phenomena of the post-stack data can be recognized better; the detection accuracy rate is higher, and the detection efficiency is faster.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Construction site project management system of grid smart construction site management and control platform

The invention provides a construction site project management system of a grid smart construction site management and control platform, which includes a project time check module, a project cost check module, a project abnormality alarm module, and a project trend prediction module. The project time check module is used for automatically expecting the construction period and total construction period of sub projects, automatically evaluating a construction period plan input by a user and the delay of the construction period plan, and automatically generating a plan construction period schedule. The project cost check module is used for automatically expecting the cost and total cost of sub projects, automatically evaluating product cost input by a user and the cost overrun, and automatically generating a cost table. The project trend prediction module is connected with the project time check module, and is used for calculating and updating the actual total construction period in real time, issuing an alarm signal for the actual construction period delay, and automatically generating an actual construction period timetable. The project abnormality alarm module sends corresponding alarm information. The system can assist non-professional personnel in making project plans to shorten the project cycle.
Owner:北京融通智慧科技集团有限公司

Blow-filling method and structure for controlling difference elevation of mud surface after treatment and unloading of soft foundation

InactiveCN105862676AShorten project cycleSolve the problem of large difference in elevationSoil drainageLand reclamationAfter treatmentCofferdam
The invention relates to a blow-filling method and structure for controlling the difference elevation of a mud surface after treatment and unloading of a soft foundation. The structure comprises a mud storage area which is formed by a closed cofferdam, a plurality of blow-filling openings are formed in a cofferdam dyke close to a mud collection area, the distance between every two adjacent blow-filling openings ranges from 150 m to 200 m, and water outlets are formed in the side, opposite to the blow-filling openings, of the cofferdam dyke; blow-filling pipes are installed in the blow-filling openings, the blow-filling pipes are located on the edge of the cofferdam dyke at the initial stage and gradually move deep into a blow-filling area after a beach is formed in the blow-filling area, the extension length of the blow-filling pipes each time is not larger than 50 m, and the accumulative total extension length is not smaller than 400 m; and the blow-filling radiation range of the pipe orifice of each blow-filling pipe in the blow-filling area is not smaller than 500 m. By the adoption of the technical scheme, the project period is greatly shortened, the problem that the elevation difference is large after unloading is completely solved, the problem that distribution of mud in a traditional blow-filling area is nonuniform is also solved, and the blow-filling quality is improved; and meanwhile, the blow-filling method and structure for controlling the difference elevation of the mud surface after treatment and unloading of the soft foundation further have the advantages that the structure is simple, construction is convenient, and the cost is reduced.
Owner:CCCC TIANJIN DREDGING HARBOR CONSTR ENG +4

Three-dimensional virtual character action complementing method and device and server

The invention provides a three-dimensional virtual character action completion method, which comprises the following steps of: preprocessing and splicing data of a past frame and a target frame of action data to be completed to generate an input vector, inputting the input vector into a trained action completion neural network model to obtain prediction data, calculating current transition frame data according to the prediction data, processing and splicing current transition frame data to generate an input vector, inputting the input vector into the trained action complementation neural network model again to obtain prediction data, calculating next transition frame data according to the prediction data, and obtaining data of all transition frames according to the method. The method is suitable for scenes which are long in generation time, large in number of transition frames and complex in action, the generated transition frames are real in action, the labor cost needed by an original interpolation scheme is reduced, the project quality is improved, and the project period is shortened. The invention further provides a three-dimensional virtual character action complementing device, a server and a computer readable storage medium which all have the above beneficial effects.
Owner:成都市谛视无限科技有限公司

Method and system for realizing automatic tracking of teacher and student based on single detection lens

The invention relates to a method and a system for realizing automatic tracking of a teacher and students based on a single detection lens. The method comprises the following steps: installing a student photographing device at the front wall of a classroom and a teacher photographing device at the back wall; after that, accessing the original images photographed by the photographing devices in real time; according to the human body moving state detection method, identifying an effective moving object and the moving state of the moving object and initiating the teacher photographing device for tracking photographing in the activity zone of the teacher and initiating the student photographing device for tracking photographing in the activity zone of the students; if an effective moving object appears in the intersecting area between the activity zone of the teacher and the activity zone of the students, determining whether there exists human face characteristic information in the moving target or not and initiating the teacher photographing device for the tracking photographing after a teacher object is identified. According to the technical schemes of the invention, with the videos from a detection photographing device, it is possible to effectively identify a teacher and students, to determine their attributes and to further control the corresponding teacher photographing device and the student photographing device for automatic tracking photographing.
Owner:BEIJING HAOXIANG TECH CO LTD

Circuit board hole site determination method and device, electronic equipment and readable storage medium

The invention provides a circuit board hole site determination method and device, electronic equipment and a readable storage medium, and relates to the field of structure simulation testing. The method comprises the steps of creating a finite element three-dimensional model corresponding to a to-be-tested circuit board based on geometric parameters and material parameters of the to-be-tested circuit board; according to a preset optimization algorithm, determining the number of target positioning holes and position information of all the target positioning holes in the finite element three-dimensional model from the finite element three-dimensional model, wherein the target positioning holes are positioning holes which are formed in a substrate model of the finite element three-dimensional model and enable the inherent frequency of the finite element three-dimensional model to be smaller than or equal to the preset frequency; therefore, the efficiency and the reliability of determining the positioning hole in the circuit board can be improved, a board punching test on a real circuit board is not needed, the development cost is reduced, and the project period of development and design is shortened.
Owner:中科可控信息产业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products