115 results about "Project planning" patented technology

Project planning is part of project management, which relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Project planning can be done manually or by the use of project management software.

Multi-dimensional intelligent management method and system for whole-process cost

The invention discloses a multi-dimensional intelligent management method and system for whole-process cost, and the method comprises the steps: generating a time-space associated structured cost data cube according to heterogeneous cost data of the stages of project planning, design, construction and completion; outputting a dynamic cost prediction curve and deviation sensitive nodes based on the structured cost data cube; according to the dynamic cost prediction curve, performing multi-party task allocation optimization by using a block chain enabled BIM / CIM collaboration platform, and generating a collaboration instruction set of smart contract coding; outputting a risk probability matrix and an advanced early warning signal based on the collaborative instruction set and the real-time engineering data flow; and according to the risk probability matrix, adopting a multi-objective optimization algorithm to generate an anti-interference decision scheme set, and outputting an optimal cost control strategy after digital twinborn simulation verification. By using the embodiment of the invention, the cost data of each stage of the project can be efficiently integrated, dynamic cost prediction is realized, and collaborative decision and effective risk management are optimized.
Owner:ZHEJIANG HAOSHENG CONSTRUCTION PROJECT MANAGEMENT CO LTD

Project full-process data tracking processing method and system

The invention relates to the technical field of artificial intelligence, and particularly provides a project whole-process data tracking processing method and system, and the method comprises the steps: obtaining project planning data, extracting the relation between task information and tasks from the project planning data through a pre-training language model, and constructing a knowledge graph based on the relation between the task information and the tasks; acquiring project execution data from a plurality of data sources, and identifying task execution information from the project execution data; predicting a task progress based on a data sequence formed by all task execution information of the task, and adding state attributes for corresponding nodes of the knowledge graph based on the task progress; and analyzing an abnormal condition of a task execution state based on the knowledge graph after the state attribute is updated, analyzing an abnormal factor based on the project execution data, and generating a processing scheme for the abnormal factor by utilizing a pre-constructed knowledge base. According to the invention, the refined and intelligent level of project management is improved.
Owner:BEIJING BIG DATA CENT

Online interactive digital city planning system

The invention belongs to the technical field of city planning, and provides an online interactive digital city planning system. The system comprises a project information management module which is used for searching, adding, editing, deleting, range delimiting and space positioning diversified operations on projects; the project planning compliance evaluation module has two functions of project planning compliance evaluation and project periphery and current situation evaluation; the project economic feasibility evaluation module constructs economic measurement and evaluation model parameters, and the system background calculates the economic measurement and evaluation model parameters by using a preset formula to generate a project economic feasibility measurement result; and the project construction scheme output module outputs a project construction scheme through the functions of importing a project construction scheme template, selecting template insertion content and exporting a scheme result and through analysis and evaluation of the project planning conformity evaluation module and the project economic feasibility evaluation module. The method can provide scientific and efficient technical support for planning and evaluation of urban planning projects.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE +1

Industrial software demand acquisition and analysis method and system based on intelligent agent

The invention belongs to the technical field of business process analysis, and discloses an agent-based industrial software demand acquisition and analysis method and system, and the method comprises the steps: constructing a multi-agent-based demand analysis system; converting user multi-modal input into a structured industrial software demand by using a multi-agent-based demand analysis system; and generating a business flow chart conforming to the BPMN standard according to the requirements of the structured industrial software. According to the invention, the multi-agent system is combined with the demand analysis task, so that efficient and accurate demand analysis is realized, and powerful support is provided for project planning and implementation in the new industrial era.
Owner:HARBIN INST OF TECH +1

Intelligent parking management method and system based on digital twinning

The invention discloses an intelligent parking management method and system based on digital twinning. And full-life-cycle management is realized by constructing a five-dimensional digital twinborn model. The method comprises the following steps: firstly, extracting information from historical data to generate a knowledge template library, intelligently matching a successful case to generate a project proposal, carrying out space, performance and fault simulation, and synchronously changing information through a mobile application. And closed-loop management from project planning to operation maintenance is realized. A hybrid decision engine combining PPO reinforcement learning and a heuristic algorithm is adopted, the parking space detection accuracy rate reaches 99.7%, the parking space searching time is shortened to 2.7 minutes, and the system response delay is reduced to 200 ms or below.
Owner:BEIJING ZHONGKEHUIJU SCI & TECH CO LTD

Project data management system for research and development of small and medium-sized enterprises

The invention relates to the technical field of data management, in particular to a project data management system for research and development of small and medium-sized enterprises, which comprises a data acquisition module for acquiring research and development project data of the small and medium-sized enterprises through a multi-source data fusion technology; the quality diagnosis module analyzes research and development data by applying a deep learning network, and automatically identifies and predicts data quality abnormity and a potential risk mode; the process collaboration module is combined with artificial intelligence and a process engine technology, and automatically adjusts research and development task processes and authority distribution according to project progress and member collaboration requirements; the resource interaction module coordinates resource allocation, sharing and recovery between the research and development project and the enterprise internal resource pool; and the decision optimization module coordinates data of each module and a research and development project target to realize collaborative optimization of project planning, resource allocation and risk control, so that the problems of data fragmentation, low flow efficiency and unreasonable resource allocation in the research and development process of small and medium-sized enterprises are solved, and the research and development efficiency and the achievement transformation capability are improved.
Owner:HEBEI XIONGAN RUIERQIHONG TECHNOLOGY CO LTD

Project document generation method, device and system and computer medium

The invention provides a project document generation method, device and system, electronic equipment and a computer medium. According to the specific implementation scheme, the method comprises the steps of generating a value decision result of a project based on a project theme text input by a user; in response to the fact that the value decision result is represented as passing, the technology concept information and the project theme text are sent to all expert agents in an expert agent group at the same time, and a plurality of initial technology implementation reports generated by the expert agents in the expert agent group are obtained; carrying out conflict identification and alignment on the plurality of initial technology implementation reports to obtain consensus memo information; sending the consensus memo information to each expert agent to obtain a plurality of project scheme documents; and generating a project planning document based on the plurality of project scheme documents.
Owner:HUA CHUAN INTERNATIONAL HOLDINGS GROUP CO LTD

Enterprise operation analysis method based on big data

The invention discloses an enterprise operation analysis method based on big data, and relates to the technical field of big data. The project information set is generated by acquiring and processing the historical project operation records of the enterprise, the corresponding operation expenditure chain and the operation income chain are generated according to all the project information sets, the dynamic project income and expenditure mapping networks are established, benefit evaluation and risk evaluation are performed on each dynamic project income and expenditure mapping network, and the dynamic project income and expenditure mapping network is established. Meanwhile, a project process record is generated according to the project information set, a historical project analysis record is obtained by integrating the dynamic project income and expenditure mapping network and the project process record, a preset project enterprise and expenditure information set and the historical project analysis record are analyzed, and then a project operation strategy is generated; and in the project operation strategy implementation process, the real-time resource price is obtained through the Internet to dynamically adjust the project operation strategy, and a historical project operation record is generated after the project operation strategy is implemented.
Owner:CHENYANG YOUCHEN TECHNOLOGY CO LTD

Power transmission and transformation project planning method and system based on plant diversity

The invention discloses a power transmission and transformation project planning method and system based on plant diversity, and the method comprises the steps: obtaining the information data of each species of each region corresponding to a target power transmission and transformation project at each construction time node, and calculating the diversity evaluation index of each species of each region at each construction time node; calculating a corresponding time-varying factor according to the change rate of each species diversity evaluation index in the time dimension to obtain a species diversity influence index of the target power transmission and transformation project on each region; and obtaining a construction planning scheme of each region based on the species diversity influence index of each region and the correlation degree between the corresponding power transmission and transformation construction data, and executing the construction planning scheme. According to the power transmission and transformation project planning method and system based on the plant diversity, the power transmission and transformation project is reasonably and accurately planned according to the change of the plant diversity, and the planning effect of the power transmission and transformation project is improved.
Owner:STATE GRID ECONOMIC TECH RES INST CO LTD +1

Construction informatization management method and system

The invention provides a construction informatization management method and system, relates to the technical field of informatization management, and is characterized in that an independent work point is used as a unified space and management unit, and static management information in a building information model and project planning data is converted into static management information; and integrating and associating with real-time dynamic data from heterogeneous systems of personnel, equipment, environment, video monitoring and the like, and automatically judging and visually displaying the comprehensive execution state of each independent work site based on a preset rule. The core step of the method is that a construction site is finely divided into independent work points with independent working procedures and management responsibility, and dynamic and static data deep fusion and state evaluation are carried out by taking the independent work points as basic units, so that the problems of information islands and fuzzy responsibility in traditional construction management are effectively solved. And a real-time, transparent and traceable global command view is provided for project managers, so that the refined and intelligent management level of the construction process is remarkably improved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Smart city planning method and system based on digital twinning

The invention discloses a smart city planning method and system based on digital twinning, relates to the technical field of city planning, and solves the problems that the scheme is not feasible due to dependence on manual interpretation of regulation texts, lack of automatic generation and matching of index constraint lists and possible neglect of key constraint conditions in planning suggestions, and meanwhile, the scheme is high in subjectivity and low in cost. And a unified quantitative model is lacked. Through the NLP technology, planning suggestions and regulation terms are compared in real time, conflict indexes are automatically marked, planning conditions and preliminary index calculation results are combined, the generated project planning suggestions strictly follow a policy framework, and manual interpretation errors or violation risks are avoided. A collaborative quantitative evaluation model of the single building and the regional landscape is established, and the landscape effect of the planning suggestion is evaluated from the dimensions of spatial layout, visual vestibule, skyline, color coordination and the like. The fusion degree of the project and the surrounding environment is visually reflected through quantitative scoring, and the deviation of subjective evaluation is avoided.
Owner:WUHAN JINCHAOSHENG PHOTOELECTRIC CO LTD

Automated project planning for a distributed power system

A computer system (which may include one or more computers) that automatically generates a plan for a power-system project is described. During operation, the computer system may receive a user query that specifies an objective or a goal. Then, the computer system may access stored information, where the stored information includes: wind data, solar data, ownership of land, energy cost, environmental conditions, connectivity, local infrastructure, regulations associated with a utility approval process, and available equipment (such as wind and / or solar equipment). Next, based at least in part on the information and the objective or goal, the computer system may automatically generate the plan for the power-system project. Moreover, the computer system may provide second information specifying the plan for the power-system project.
Owner:BOOTSTRAPLAB LLC

Fabricated building design method based on BIM

The invention relates to the technical field of fabricated buildings, in particular to a BIM (Building Information Modeling)-based fabricated building design method, which comprises the following steps of S1, project demand analysis; s2, project planning; s3, constructing a BIM three-dimensional model; s4, function partitioning and spatial layout optimization are carried out; s5, model selection of the assembly type system; s6, carrying out green and environment-friendly design and optimization; s7, carrying out collision check and optimization; s8, performing construction simulation and progress planning; s9, generating and optimizing a construction drawing; s10, generating a production list; and S11, production process management. Through function division and space layout optimization, the space utilization rate is increased, operability and comfort of the fabricated building in actual use are ensured, the energy utilization efficiency is improved through green and environment-friendly design and optimization, and the energy utilization rate is increased. Continuous optimization and operation and maintenance management of a building project are realized through standardization and information sharing of fabricated components, field installation guidance and building operation and maintenance, and the use benefit and sustainability of a building are improved.
Owner:SHANDONG JINYU HANGXIAO ASSEMBLY CONSTR CO LTD

Energy storage optimization configuration method based on green power direct connection project

The invention relates to an energy storage optimization configuration method based on a green power direct connection project. The method comprises the following steps: step 1, determining an optimization configuration limiting condition and a price mechanism, wherein the core of source, load and storage configuration is a green power direct connection system so as to meet the green energy demand of an enterprise and improve the nearby local consumption level of new energy; 2, green power direct connection project planning configuration: exploring an optimal scheme under a differentiated scene by applying a production operation simulation method and taking system economy optimization as a target, analyzing the influence of a source storage configuration scale on project economy, and considering surrounding actual resource conditions to obtain a final feasible scheme; 3, analyzing a green electricity direct connection project planning scheme based on examples; the method has the advantages that the new energy utilization rate is increased, the cost is reduced, and reasonable distribution and storage are realized based on a production simulation method.
Owner:ECONOMIC TECH RES INST OF STATE GRID HENAN ELECTRIC POWER

Operation management system, method and equipment based on electrical design and storage medium

The invention provides an operation management system, method and equipment based on electrical design and a storage medium, and relates to the technical field of electrical system management, the system comprises an information acquisition module used for acquiring multi-source information of an electrical project, the multi-source information at least comprising electrical equipment information, cable routing information and user terminal information; the intelligent management module is used for planning a laying path of a cable route according to the multi-source information, and generating an electrical project planning map and an electrical project budget based on the laying path and the multi-source information; and the visual display module is used for carrying out visual display according to the laying path and the electrical project planning graph. According to the method, electrical engineering design elements are seamlessly integrated into a circuit planning process, structural processing and intelligent classification are carried out on multi-source heterogeneous data, a traceable dynamic database is formed, accurate data services are provided for electric power design, construction and operation management, and the scientificity and construction efficiency of electrical project design are effectively improved.
Owner:BEIJING MINING & METALLURGICAL TECH GRP CO LTD

Scientific and technological planning landing management method and system based on project structure portrait

The invention discloses a science and technology planning landing management method and system based on a project structure portrait, and the method comprises the steps: extracting features of multiple dimensions from science and technology project document data through employing a large language model, and obtaining structured project dimension information; the method comprises the following steps: calculating an inter-dimension incidence matrix by utilizing structured project dimension information, adjusting the weight of each dimension when the similarity of every two projects is calculated by combining the incidence matrix, obtaining the overall similarity score of every two projects, and carrying out the similarity calculation of adaptive graph diffusion fusing expert knowledge based on the overall similarity score of every two projects. The global similarity between the items is obtained; whether the structured project dimension content covers the science and technology project planning requirements or not is compared through a large language model by utilizing the existing project document and the global similarity information between projects, and a planning landing analysis report is obtained; the method has the advantages that the incidence relation between the projects is fully considered, and the projects meeting the requirements are accurately and efficiently screened out.
Owner:STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST

Planning and deploying multiple assets for projects

A method may include receiving, via one or more processors, a first dataset associated with a plurality of projects that corresponds to performing hydrocarbon exploration or processing operations. The method may then involve receiving a second dataset associated with a plurality of assets, such that at least a portion of the plurality of assets is used to complete at least a portion of the plurality of projects. The method may also involve determining a plurality of schedules for deploying the at least a portion of the plurality of assets for use with the at least a portion of the plurality of projects, identifying a portion of the plurality of schedules based on an optimization algorithm with respect to revenue, and sending a notification indicative of the portion of the plurality of schedules to a computing device, wherein the computing device is configured to display the notification via an electronic display.
Owner:SCHLUMBERGER TECH CORP

APQP-based automobile project management system and method

The invention provides an APQP-based automobile project management system and method. The system comprises an entry setting module used for carrying out product characteristic or process characteristic classification on various parts in an automobile project; the template setting module is used for pre-storing at least one APQP template and associating each APQP template with a project demand; the project group module is used for building a project management team and distributing member roles and permissions; the project planning module is used for acquiring five design stages of the APQP and generating a project plan table according to the five design stages; the drawing file management module is used for storing and managing drawings and / or documents related to automobile projects; the query module is used for providing information query of characteristic classification, project progress and historical projects; the additional data module is used for collecting and managing industrial standards, laws and regulations related to automobile projects; and the basic information module is used for managing various project information. According to the embodiment of the invention, the efficiency and accuracy of product quality planning can be improved.
Owner:SHANGHAI HONGHUAI INFORMATION TECHNOLOGY CO LTD

Enterprise project full-process intelligent management system

The invention belongs to the technical field of enterprise project management, and particularly relates to an enterprise project full-process intelligent management system, which comprises a project starting module, a project planning module, a project execution module, a project monitoring module and a project ending module, and is characterized in that the project monitoring module comprises a progress monitoring unit, and the progress monitoring unit is connected with a performance monitoring unit; the performance monitoring unit is connected with a risk monitoring unit, the risk monitoring unit is connected with a problem monitoring unit, and the risk monitoring unit comprises a risk early warning unit and a risk management unit. Through data mining and natural language processing technologies, a project management team can be helped to discover and analyze potential risks and problems; through simulation and prediction, a team is helped to make strategies for coping with risks and problems, various aspects of enterprise operation can be monitored in real time, potential risk points can be identified, early warning can be given out in time, and the enterprise is helped to avoid risks in advance.
Owner:ZHEJIANG SMART SHU TECHNOLOGY CONSULTING SERVICE CO LTD

Dynamic project planning for software development projects

Methods, systems, and apparatus, including computer programs encoded on computer storage media, for generating and updating project plans for software development projects. In one aspect, a method includes obtaining data indicative of initial project plan parameters associated with a software development project; identifying multiple program modules associated with the software development project; obtaining, for a first set of modules of the multiple modules, corresponding source code segments; executing a quality assessment process to compute, for each corresponding source code segment, a corresponding quality score; identifying, based on the quality scores, that at least a subset of the corresponding source code segments are integrable into a corresponding first subset of the first set of modules; and generating a revised project plan by generating updates to the initial project plan parameters by accounting for the corresponding source code segments being integrated in to corresponding ones of the first set of modules.
Owner:ACCENTURE GLOBAL SOLUTIONS LTD

Project planning and site selection method based on available land analysis and land development cost estimation

The invention discloses a project planning and site selection method based on available land analysis and land development cost estimation, and the method comprises the steps: carrying out the land current situation analysis of land parcels to be selected one by one, i.e., carrying out the spatial overlay analysis of the screened land parcels to be selected meeting conditions and the land utilization current situation data of adjacent years, analyzing the land current situation of each land parcel, and carrying out the calculation of the land development cost of each land parcel; comprising the following steps: further analyzing the areas and proportions of cultivated land and forest land for the agricultural land, estimating the land cost based on the land current situation analysis result of a to-be-selected land parcel, and calculating the land cost according to the agricultural land area, the cultivated land area, the forest land area and the current policy. According to the method, cultivated land purchase indexes and capital costs required for land acquisition compensation are estimated, land parcels to be selected are sorted according to different dimensions such as occupied cultivated land areas, land capital costs, landforms and the like, government departments can conveniently check land element input-output ratios and land performance evaluation, and the pertinence of investment attraction and the efficiency and accuracy of project planning and site selection are improved.
Owner:JINAN SURVEYING & MAPPING RES INST

Project plan dynamic adjustment system and method based on reinforcement learning

The invention belongs to the field of project planning, and particularly relates to a project plan dynamic adjustment system and method based on reinforcement learning, the system comprises an initial configuration module, a demand analysis module and a reinforcement adjustment module, and the initial configuration module constructs a resource pool and a project pool and generates an initial optimal project configuration node mapping relationship network; the demand analysis module is used for decomposing secondary demands and monitoring project sub-step progress and conflicts; the enhanced adjustment module performs dynamic adjustment according to a secondary demand intention chain and the like, a configuration adjustment model is built in, a configuration relation chain is adjusted through a bidirectional adjustment path, a secondary configuration mapping chain is generated, and delay risk value feedback optimization is monitored in real time; through cooperation of all the modules, accurate and dynamic adjustment of the project plan is achieved, demand changes and resource conflicts are effectively coped, and the adaptability of the project to the dynamic environment is enhanced.
Owner:SHANGHAI XINGANG INFORMATION TECH CO LTD

system

The system according to the embodiment aims to provide real-time customized advice when planning a project. [Solution] A system according to an embodiment includes a reception unit, an analysis unit, a provision unit, and an update unit. The reception unit inputs project goals or requirements. The analysis unit analyzes the information input by the reception unit and provides customized advice. The provision unit provides the advice provided by the analysis unit to a user. The update unit updates the advice provided by the provision unit based on user feedback.
Owner:SOFTBANK GROUP CORP

Amphibious multi-business and multi-mode complete-period construction project cost management and control system

The invention relates to an amphibious multi-business and multi-mode complete-period construction project cost management and control system. The system comprises a project income management module, a project budget management module, a project planning management module, a project cost management module, an economic activity analysis module and an assessment and evaluation module. According to the invention, big data, artificial intelligence, mobile internet and other informatization technologies are applied to perform full-business process management and control on project income, budget, planning, cost and economic activity analysis, and by means of dynamic assessment and evaluation, the cost management and control requirements of construction projects of different types, different stages and different conditions are met, so that the cost management and control requirements of construction projects on water or land are met. The cost management and control requirements of the project can be met whether a standard project or an EPC project, the universality of the system is improved, meanwhile, a data flow mechanism with data communicated layer by layer is constructed through strict system logic, the reuse rate of process achievements is improved, the burden of data filling and reporting can be reduced for first-line project management personnel, and the working quality and efficiency are improved.
Owner:CCCC TIANJIN ECO ENVIRONMENTAL PROTECTION DESIGN & RES INST CO LTD +1

Intelligent analysis system for geological exploration project plan management

The invention discloses a geological exploration project plan management intelligent analysis system, and relates to the technical field of geological exploration, and the method comprises the steps: collecting and integrating data, forming a unified data set, and obtaining geological data; performing risk identification and assessment according to the geological data to obtain a risk assessment result; project planning optimization is carried out according to the risk assessment result, and an optimized project planning scheme is obtained; performing resource scheduling and task allocation according to the optimized project planning scheme to obtain a scheduling scheme; performing project execution monitoring according to the scheduling scheme to obtain execution monitoring data; performing cost control and budget analysis according to the execution monitoring data to obtain an analysis result; performing fund flow optimization according to the analysis result to obtain an optimization result; and performing project performance evaluation according to an optimization result in combination with real-time data of project execution. According to the invention, the accuracy of risk prediction and the adaptability of the model are improved, the storage and transmission speed of data is optimized, and the transparency and efficiency of project management are improved.
Owner:SHANDONG PROVINCIAL GEOLOGICAL & MINERAL EXPLORATION & DEV BUREAU 801 HYDROGEOLOGY & ENG GEOLOGY BRIGADE (SHANDONG PROVINCIAL GEOLOGICAL & MINERAL ENG EXPLORATION INST)

Intelligent collaborative design and management system

The invention discloses an intelligent collaborative design and management system, which belongs to the field of engineering design and management and realizes full-process coverage of engineering design and management by integrating a management module, a design module, a publishing module, a calculation module, a data module, an intelligent service module and the like. On-line project planning, data entrustment, project design, drawing publishing full-process intelligent design and project intelligent management are realized, full-professional authority-based on-line real-time editing of design data, automatic generation of a chart template, real-time and synchronous updating of data, automatic calculation and generation of a data table, intelligent equipment type selection, automatic calculation of materials and expenses, and automatic identification of errors are realized. The system has the functions of intelligent auxiliary reminding, drawing online checking, drawing automatic filing, meeting training, business travel intelligent reservation and the like, the design efficiency and the design quality are improved, the labor intensity of personnel is reduced, and the design and management intelligent level is improved.
Owner:CHANGQING ENGINEERING DESIGN CO LTD +1

Reinforcement learning-based project plan dynamic adjustment system and method

The application belongs to the field of project planning, and particularly relates to a project plan dynamic adjustment system and method based on reinforcement learning, which comprises an initial configuration module, a demand analysis module and a reinforcement adjustment module, wherein the initial configuration module constructs a resource pool and a project pool, and generates an initial optimal project configuration node mapping relationship network; the demand analysis module decomposes secondary demands, and monitors project sub-step progress and conflicts; the reinforcement adjustment module dynamically adjusts according to secondary demand intention chains and the like, internally configures an adjustment model, adjusts configuration relationship chains through a bidirectional adjustment path, generates secondary configuration mapping chains, and feeds back optimization in real time by monitoring delay risk values; through cooperation of the modules, the application realizes accurate dynamic adjustment of project plans, effectively deals with demand changes and resource conflicts, and enhances adaptability of the project to a dynamic environment.
Owner:SHANGHAI XINGANG INFORMATION TECH CO LTD

Construction project planning site selection and land pre-auditing evaluation method based on multi-factor analysis

The invention discloses a construction project planning site selection and land use pre-examination evaluation method based on multi-factor analysis, and particularly relates to the technical field of construction project planning, and the method comprises the following steps: firstly, collecting basic factor, environmental factor and social factor data related to a project; then independently analyzing the basic factor data, calculating deviation values and combining the deviation values to form a deviation vector; carrying out predictive quantitative evaluation on the environmental factor data, and calculating an environmental influence index; performing qualitative analysis on the social factor data to generate a social influence index; and finally, inputting the basic factor deviation vector, the environmental influence index and the social influence index into a pre-trained multi-factor decision model, classifying layer by layer, and outputting an evaluation result to provide a scientific basis for site selection. According to the method, the limitation of a traditional single-factor decision-making method is overcome, the suitability of the site selection area is comprehensively evaluated, the result is more persuasive due to the interpretability and transparency of the decision-making process, and project approval and communication are facilitated.
Owner:HEFEI YUANDING PLANNING & DESIGN CO LTD

Equipment development project progress planning method and system oriented to path selection and feedback iteration

The invention relates to the technical field of project planning, and discloses a path selection and feedback iteration-oriented equipment development project progress planning method and system, and the method comprises the steps: designing selectable nodes according to a complex equipment development process, and constructing a variable flexible graphical representation review technology network model for complex equipment development; defining a constraint condition of a path, solving an equivalent transfer function of the whole development process through a matrix solution, and constructing a variable flexible graphical representation review technology network optimization model; and solving the optimization model through a genetic algorithm to obtain a solution of equipment development. According to the method, selective nodes are constructed, then a flexible graphic review technical model with a variable structure is provided, and a variable flexible GERT network is simplified by utilizing PH distribution; three constraints of punctual completion probability, cost, completion time and variance are introduced, the expected time is minimized as a target, an equipment development multi-scheme and multi-mode selection and progress plan integrated optimization model is established, and a solving algorithm is designed.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Building planning model and aerial video overlapping display method and device and electronic equipment

The embodiment of the invention discloses a building planning model and aerial video overlapping display method and device and electronic equipment. A specific embodiment of the method comprises the following steps: acquiring shot project display aerial video information; obtaining to-be-planned building scene information; performing scene visualization processing on the to-be-planned building scene information to obtain three-dimensional scene information; performing key frame identification on the project display aerial video information to obtain a key frame parameter information set; performing flight path extraction on the key frame parameter information set to obtain flight path information; performing aerial view roaming on the three-dimensional scene information according to the flight path information to obtain a building scene roaming video; layering and overlapping the building scene roaming video and the project display aerial video information to obtain a project planning preview video; and transmitting the project planning preview video to a display terminal for display. According to the embodiment, the building model and the aerial video can be overlapped, and waste of computing resources is reduced.
Owner:HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD