Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42 results about "Project analysis" patented technology

“ The project analysis was proceeding forward to determine if the construction of the new solar plant would provide a high return on investment.

High-voltage business expansion overall process management and control system of power marketing

InactiveCN105427091AImprove capacity completionImprove return visit satisfaction rateOffice automationProject trackingCo operative
The invention discloses a high-voltage business expansion overall process management and control system of power marketing, and relates to a management and control system. Business expansion management work is one of the traditional core businesses of a power supply enterprise, the work developing and finishing situation of the business expansion management work directly affects the brand image and the client service level of the power supply enterprise, and a situation that the business expansion management work is manually carried out can not meet development requirements along with the increase of data. The high-voltage business expansion overall process management and control system comprises a workbench function application module, a project plan management module, a project execution management module, a project tracking management module, a mobile terminal synergy APP (Application) module and a project analysis management module. The technical scheme is cooperated with a management responsibility to develop a business expansion multi-department united cooperative flow and establish a projectized plan management mechanism, a traditional business expansion mode is optimized and improved to develop the overall process management and control of each link of the high-voltage business expansion and realize milestone node management so as to shorten the power connection time of a client, improve the volume completion rate of the high-voltage business expansion and the client review satisfaction rate of the high-voltage business expansion.
Owner:STATE GRID ZHEJIANG HANGZHOU XIAOSHAN POWER SUPPLY CO +2

Nuclear power plant system regular test project analysis design method

The invention relates to a nuclear power plant system regular test project analysis design method. The method comprises the following steps: (I), screening systems needing regular tests in a nuclear power plant system; (II), for the systems needing the regular tests, determining projects and content of the needed regularly conducted tests, and determining acceptance criteria which devices or parts which are determined by the projects for executing different functions should satisfy when the regular tests are executed; and (III), determining test periods of the devices or parts of the projects in executing the regular tests, and at the same time, establishing regular test notes according to needs of the test projects. According to the invention, based on functions and configuration executed by systems, the systems needing the regular tests are screened, and according to the function execution reliability, the projects and the content executing the regular tests are analyzed and designed, such that it can be ensured that the safety, and safety-correlated systems, devices and functions can be regularly examined, accordingly, it is ensured that the functions are at normal states, and at the same time, the feasibility and the validity of executing the regular tests by operation personnel can also be guaranteed.
Owner:CHINA NUCLEAR POWER ENG CO LTD

Block chain-based information cloud platform management system

InactiveCN107807953AEasy to masterAchieve security and confidentialityDatabase queryingFinanceProject analysisFeature extraction
The invention discloses a block chain-based information cloud platform management system, and belongs to the field of information management systems. The system comprises a capital analysis part and aproject analysis part, wherein the capital analysis part is used for carrying out information interaction with a block chain cloud platform management center through a data transmission and storage module; the project analysis part is used for carrying out information interaction with the block chain cloud platform management center through the data transmission and storage module; a data featureextraction unit of the block chain cloud platform management center is connected with a data analysis processing unit; the data analysis processing unit is connected with the block chain cloud platform management center through the data transmission and storage module; the block chain cloud platform management center is connected with a query part through a diagram generation unit; and the querypart is connected with the block chain cloud platform management center through an information analysis and extraction unit. According to the system, the block chain cloud platform management center is built through a block chain technology, so that the security and secrecy of information data in enterprises is realized and the information isolated island effect in enterprise departments is relieved.
Owner:合肥博力生产力促进中心有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products