The invention relates to the technical field of
nuclear power internal disaster analysis, and discloses a
nuclear power plant internal flooding experiment
verification method, device, equipment and medium, and the method comprises the steps: carrying out the modeling analysis of a target
plant prototype, and determining a plurality of
model parameter values of an experiment scaling model; constructing an experiment scaling model according to the plurality of
model parameter values, and determining experiment parameters of an internal water
logging experiment; performing an internal water
logging experiment on the experimental
scale model by using the experimental parameters to obtain an internal water
logging experiment result of the experimental
scale model; and obtaining an internal water logging
simulation result of the numerical model, comparing the internal water logging
simulation result with an internal water logging experiment result, and verifying the accuracy of the internal water logging
simulation result according to a comparison result. According to the method, the experiment
scale model of the
nuclear power plant prototype is constructed, the flooding spreading conditions under different working conditions are simulated and compared with the flooding simulation result, the accuracy of flooding simulation calculation is verified, and more accurate guidance is provided for follow-up nuclear power project internal flooding analysis.