Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

41 results about "Project implementation" patented technology

Project implementation (or project execution) is the phase where visions and plans become reality. This is the logical conclusion, after evaluating, deciding, visioning, planning, applying for funds and finding the financial resources of a project.

Science and technology project management method and system based on business fusion

The invention discloses a science and technology project management method and system based on business fusion, and belongs to the technical field of project management, and the method comprises the following steps: S1, collecting business data and technical data of each department, and storing the collected data in a unified database according to a preset data standard; s2, performing format conversion, standardization processing and data version management on the business data and the technical data to generate a comprehensive management data set; and S3, based on the comprehensive management data set, risk factors and performance indicators in the project implementation process are automatically calculated by using a risk assessment algorithm and a performance assessment algorithm, the risk assessment algorithm adopts a machine learning model, the performance assessment algorithm adopts a weighted statistical analysis method, and risk early warning information and a performance feedback report are generated. Through standardized data management and a unified database, information islands are eliminated, efficient integration of business data and technical data is realized, and cross-department collaboration efficiency is improved.
Owner:福建建工集团有限责任公司

Engineering project whole process consultation management method and system

The invention relates to the technical field of engineering project management, in particular to an engineering project whole-process consultation management method and system. Comprising the following steps of S1, collecting contract data related to an engineering project, performing type splitting on the contract data, and performing progress stage distribution on the split contract data in combination with a total construction plan of the engineering project; s2, the uploaded completed construction data and the uncompleted construction plan are collected, related progress stage analysis is carried out on the completed construction data, and correction analysis is carried out on the completed construction data and the uncompleted construction plan in combination with the total construction plan; by integrating contract data and construction plans and utilizing technologies such as time sequence analysis to construct a construction prediction analysis model, the project progress can be accurately monitored and predicted, and in the project implementation process, completed construction data and a total construction plan are compared in real time, and progress deviation is found in time.
Owner:TIANJIN TEDA PROJECT MANAGEMENT CONSULTING CO LTD

Industrial project implementation supervision method and system, medium and program product

ActiveCN119398703AImprove approval efficiencyreduce delaysOffice automationThe InternetProcessing
The invention discloses an implementation supervision method and system for an industrial project, a medium and a program product, and relates to the field of Internet data services, and the method comprises the steps: determining an associated project corresponding to a new project according to the project data of the new project; monitoring the process progress of the new project in real time, and determining the approval efficiency of the new project; when the approval efficiency is lower than a preset efficiency threshold value, determining a current process of the new project and an associated process of an associated project corresponding to the current process; when the approval confirmation time of the current process exceeds the historical approval time of the associated process, generating an approval delay report; and sending the approval delay report to the user terminal. By implementing the method, the project approval processing efficiency can be improved.
Owner:BEIJING DIXING WEIYE DIGITAL TECH CO LTD

Deep learning model automatic deployment based on minitrain software

Deployment models of deep learning models are various in development framework and deployment framework, and support conditions of various different reasoning frameworks for computing power are greatly different. According to manufacturers, models and systems of development boards, dependency compatibility problems occur during deployment, so that model deployment and project landing have great problems all the time. The invention aims to provide the automatic deployment method for the deep learning model based on the minitrain software, the trained deep learning model can be automatically deployed to a development board end in a graphical mode, and the work of dependency compatibility adaptation, reasoning file writing, operator adaptation and the like is omitted.
Owner:SMIC FUTURE (BEIJING) TECH CO LTD

Engineering project management method and system based on budget execution condition

The invention provides an engineering project management method and system based on a budget execution condition, and relates to the field of engineering project management. The method comprises the steps of firstly obtaining engineering project data, compiling a target project budget according to the engineering project data, and establishing a budget execution ledger; in a project implementation process, actual budget execution data are recorded to form an actual budget execution ledger, and the actual budget execution ledger is compared with the budget execution ledger to obtain actual deviation data. The method comprises the following steps of: determining a finished project amount, a finished project cost and an unfinished project amount at the same time, measuring and calculating a prediction budget execution ledger of the unfinished project amount in combination with a human price trend, a raw material price trend, required human data, a project period, raw material data and the like, and comparing the prediction budget execution ledger with the budget execution ledger to obtain prediction deviation data. On the basis, actual deviation and predicted deviation data are comprehensively analyzed, a comprehensive deviation reason is judged, and a deviation correction scheme is formed according to the comprehensive deviation reason. According to the scheme, the timeliness of project management deviation correction is improved.
Owner:SHANGHAI ORIENTAL INVESTMENT SUPERVISION CO LTD

A method and system for automatically generating bond project implementation plans

The present invention provides a method and system for automatically generating a bond project implementation plan, comprising: obtaining key information of the bond project input by a user terminal; performing data matching on the key information of the bond project using a pre-built bond business model based on the key information of the bond project, and outputting an initial project plan corresponding to the key information of the bond project; extracting business data information from the initial project plan, and performing data identification based on the business data information using a matching algorithm to obtain a data table and business description corresponding to the business data information; generating a project implementation plan corresponding to the key information of the bond project based on the data table and the business description; the present application significantly improves the accuracy of information extraction and the accuracy of plan matching through automated acquisition of key information of the bond project, intelligent matching and data identification, and can quickly generate standardized project implementation plans, thereby reducing manual intervention, reducing errors and improving efficiency.
Owner:BEIJING DASHUYUAN TECH DEV CO LTD

Project visualization full-process management method and system in combination with knowledge graph

The invention provides a project visualization full-process management method and system combined with a knowledge graph, and the method comprises the steps: firstly gathering multi-source project information units which cover project tasks, resources, progress and participant information in a project implementation process, and then carrying out the correlation analysis of the multi-source project information units; the method comprises the following steps: generating association relationship data including relationships such as inter-task preposition dependency, resource and task allocation and use, progress and task completion states, participants and task responsible execution and the like, establishing a project association map according to the association relationships, and describing association paths and interaction modes of all elements of a project; the project association graph is displayed on a visual management interface including graph display, information details, relation analysis and an operation control area in an interactive graph form, a user management instruction is responded, the project association graph and a corresponding multi-source project information unit are adjusted, updated and refreshed and displayed in real time, and the project management efficiency and quality are improved.
Owner:HIMIT (SHENZHEN) TECH CO LTD

Project file tracking inspection method, system and equipment based on full life cycle of project

The invention relates to a project file tracking and polling method, system and equipment based on a project full life cycle, and relates to the technical field of project management, and the method comprises the steps: innovatively setting a directory for a project full life process, analyzing a project file full life cycle file, and controlling a project implementation process through a full life cycle table. And establishing a full life cycle coordinate system for each file to realize progress matching of the project and the archive data. And inputting the constructed full-life-cycle coordinate system matrix into the model, establishing a full-life-cycle coordinate system matrix mapping relation, and realizing internal understanding of data required by a project by learning internal connection, including accurate and efficient positioning of the data. Through the full-life-cycle coordinate system matrix of the model inspection project file, the difference change of the project file is quickly positioned, the leakage checking and the vacancy filling of the full-life data of the project are realized, and the technical problems of low project tracking and positioning accuracy, low efficiency and the like in the prior art are solved.
Owner:CHINA SOUTHERN POWER GRID CO LTD EHV TRANSMISSION CO NANNING MONITORING CENT

Project supervision system based on information terminal

The invention discloses a project supervision system based on an information terminal, the project supervision system comprises a supervision information ecological chain module, a supervision data model analysis management module and a supervision data feedback sharing module, and the invention also discloses an operation method of the system, and the operation method comprises the following steps: 1, building a staged supervision information ecological chain according to a supervised project project; 2, aiming at data information circulating in a supervision information ecological chain, establishing a project supervision data model to manage the content and the flow direction of information data; 3, performing analysis and labeling based on the feature data of each stage of project supervision; 4, building a project supervision feedback database, and feeding back data generated by a plurality of supervision modes in each stage of the project to a project quality information database for sharing analysis and supervision learning; the problem of low-efficiency management of data in the supervision process is solved; the method has the characteristics of improving the circulation utilization rate of the project engineering implementation process data and improving the supervision effectiveness.
Owner:SHANGHAI LINGYI ENG SUPERVISION CO LTD

Project risk prediction avoidance method and system fusing deep learning

The present application belongs to the field of project risk prediction, and particularly relates to a project risk prediction avoidance method and system fusing deep learning, comprising: acquiring project reports and overall personnel configuration data, using a relation extraction decomposition model to extract project decomposition configuration data, secondly, constructing a project implementation node chain according to graph theory, thirdly, obtaining a set of correlated and non-correlated single sub-project from single sub-project implementation planning data in the node chain through a correlation algorithm, and then constructing a configuration risk model based on a particle swarm algorithm-optimized Bayesian algorithm, inputting the above-mentioned sub-project set to obtain single and correlated configuration risk probabilities, and finally constructing a personnel configuration adjustment factor according to the two risk probabilities, configuring the adjustment factor to the node chain connection relationship, and dynamically adjusting the initial configuration of personnel of each single sub-project until all nodes satisfy a preset risk probability threshold, so as to effectively cope with risks caused by personnel configuration in project implementation.
Owner:SHANGHAI XINGANG INFORMATION TECH CO LTD

Project data backup method, system and medium

The embodiment of the application provides a project data backup method, system and medium, the method comprises the following steps: executing project implementation according to a project plan, and obtaining a project implementation progress; matching storage areas of different implementation progress according to the project implementation progress, and forming a plurality of backup blocks, wherein the project implementation progress is one-to-one corresponding to the backup block; backing up the project data of different implementation progress into the corresponding backup block to form the first full backup data; comparing the project data corresponding to the project implementation progress with the first full backup data to obtain the difference data; setting a backup time period, calling a backup strategy, starting the backup block to fill and backup the difference data according to the backup strategy; and backing up the project data corresponding to different project implementation progress in different backup blocks to realize the separate backup of data, perform the first full backup, and then only need to compare the project data with the first backup data, add the difference data, and improve the backup efficiency.
Owner:CHINA SOUTHERN POWER GRID INTERNET SERVICE CO LTD

A multi-agent collaborative project-based list management method and system

The present application relates to a kind of list-based management method and system based on multi-agent collaborative project, belong to project management technical field.Establish list in the whole life cycle of project approval, project implementation and project acceptance, carry out dynamic control to project, ensure the coherence of project from planning to landing, realize whole process penetration type management;Project approval stage, including establishing the basic situation list of project research unit, establishing project performance index list, establishing project investment budget list;Project implementation stage, including establishing project contract signing list, establishing project progress execution list, establishing project fund execution list;Project acceptance stage, including establishing project achievement delivery list, establishing project fund final account list, establishing project acceptance application list, establishing project archives handover list.The present application solves the problem that communication and coordination between cross-domain, cross-regional cooperation subjects are difficult, effectively improves work quality and efficiency.
Owner:CHINA NORTH IND NEW TECH PROMOTION INST

Construction project management and control method

A construction project management and control method comprises the following steps: (1) in a project establishment stage, business department personnel and related technical support departments compile a proposal; (2) in a feasibility research stage, business department personnel and related technical support departments compile and fill a feasibility research report on the basis of proposal reply and project approval evaluation; (3) an initial setting stage; (4) an adjustment reporting stage; (5) a plan implementation stage; (6) a construction project completion acceptance stage; and (7) post-evaluation stage. The construction project management and control method is designed for improving the construction project management informatization level, full-life-cycle management from project planning, argumentation, project approval, feasibility research, initial setting, implementation, completion acceptance to post evaluation can be achieved, full-life-cycle management of the project can be achieved, meanwhile, through monitoring of various indexes, the construction project management information level is improved, and the construction project management information level is improved. And the implementation progress of the project can be better mastered, and the project risk is reduced.
Owner:JIANGSU JARI GROUP CO LTD

A project collaborative innovation system, method and storage medium based on mechanism matching

The present invention relates to the field of computer technology, specifically a project collaborative innovation system, method, and storage medium based on mechanism matching, wherein the system includes: a demand release module, a collaborative selection module, an implementation supervision module, an achievement conversion module, an innovation exchange module, a system management module, and a storage module; the demand release module is used to compile the content of the project and set the mechanism of the project; conduct multi-level review of the project; according to the set mechanism, match the matching conditions proposed by each participant on each mechanism to obtain a matching rate; push the bidding information of the project to the participants who meet the preset matching rate and publish it; the implementation supervision module is used to enter the current project progress of the implemented project and determine whether the project is completed based on the current project progress. If so, the achievement conversion module is triggered; if not, the project implementation continues. This solution can improve the cooperation achievement rate of both parties, ensure the orderly progress of the project, and ensure the distribution of project achievements according to the agreement.
Owner:LOGISTICAL ENGINEERING UNIVERSITY OF PLA

Project management method and device based on dynamic regulation and control, storage medium and equipment

The invention relates to the technical field of project management, financial science and technology and smart medical treatment, and discloses a project management method and device based on dynamic regulation and control, a storage medium and equipment, and the method comprises the steps: obtaining project approval information of a target project; performing strategic importance scoring and operational feasibility scoring on the target project according to the project approval information, and constructing a strategic score matrix of the target project according to the strategic importance score and the operational feasibility score; if the strategic score matrix of the target project meets the project implementation condition, implementing the target project, and obtaining project implementation information of the target project in the implementation process of the target project; and dynamically scoring the target project according to the project implementation information, and dynamically intervening the implementation of the target project according to the dynamic score. Project management is upgraded to a dynamic data driving mode from a static experience driving mode, and the project adaptability and decision accuracy in a complex environment are improved.
Owner:PING AN INT FINANCIAL LEASING CO LTD

Project management system

A project management system disclosed by the present invention comprises a project input module, a fund monitoring module, a project implementation monitoring module and a project after-sales module, the project input module inputs an initiated project based on a block chain and determines project details, and the fund monitoring module carries out fund supervision on the established project. The project implementation monitoring module is used for project decomposition, distribution and implementation, the project after-sales module is used for monitoring the project completion progress, and the project input module comprises a member registration sub-module for registration and use based on a block chain. The sealing and testing sub-module is used for testing the performance, and the member registration sub-module is used for sealing a block chain interface; the information scanning sub-module is used for automatically inputting the uploaded contract or protocol; and the login module is used for accessing the packaged block chain interface. According to the invention, through integration of social resources and a block chain technology, a safe, efficient and extensible project management solution is provided for enterprises.
Owner:HEBEI XIONGAN KELIN ENTERPRISE MANAGEMENT CONSULTING CO LTD

A method and system for intelligent statistical analysis of production project implementation progress

The present invention proposes an intelligent statistical analysis method and system for the implementation progress of a production project. The method includes: initially classifying all task lists in the production project, and constructing a directed acyclic task graph based on the initially classified task lists to represent the dependencies between tasks; collecting data on the execution status of each task according to the initial monitoring granularity of each task, and determining whether the actual progress of each task deviates from the planned progress based on the collected data; collecting behavioral data for each project role, and then calculating the behavioral deviation of each role based on regularization. Based on the behavioral deviation of each role, the collaborative efficiency between the roles is calculated, and then task allocation and progress management are dynamically adjusted; task priorities and resource allocation are re-optimized based on the results of the dynamic adjustment; feedback on the execution of the optimized tasks is provided to the project manager, and intelligent decision support is provided. The present invention has higher intelligence and real-time response capabilities.
Owner:ELECTRIC POWER RES INST OF GUANGDONG POWER GRID CO LTD

A five-in-one integrated project management and control system

The present invention provides a five-in-one integrated project management and control system, which solves the technical problems of resource waste, labor and time consumption in current EPC engineering general contracting projects. The present invention is mainly aimed at engineering general contracting projects with design as the main body. The design management system of the present invention is the "leader", and the design management system is the final carrier of project implementation; the contract scope and construction rules stipulated by the contract management system are the basis of income and risk; the procurement management system is used as the support of project costs, which plays a key role in connecting the upper and lower levels; the construction management system is used to manage the construction implementation of the project; the business management system is used as the basis for judging risks and costs, which is the core of controlling the budget and creating benefits (risk control, budget, and creating higher benefits).
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Methods, devices, equipment, and media for identifying duplicate instructions issued in engineering projects.

This invention relates to the field of application development technology and provides a method for identifying duplicate change orders in engineering projects. First, engineering information is correlated and integrated to obtain an intermediate dataset with a logical order of project implementation. Text extraction and data cleaning are then performed on the intermediate dataset to form change order text data. Next, the change order text data are paired based on instruction keywords to form an instruction control group. Then, a dual-thread similarity framework is used to calculate the similarity between two change order text data in the instruction control group to obtain first and second similarity data. If the first and second similarity data meet the duplication condition, the instruction control group is considered as a duplicate change order. In this way, duplicate change orders can be automatically identified, allowing for timely detection of problems and mitigation of company losses.
Owner:SHENZHEN PING AN INTEGRATED FINANCIAL SERVICES CO LTD

Comprehensive management system for bid inviting data of engineering construction project

The invention belongs to the technical field of bid invitation data management, and particularly discloses a comprehensive management system for bid invitation data of an engineering construction project. The system comprises a bid invitation data acquisition module, a bid invitation information classification module, a bid invitation information analysis module, a bid qualification judgment module, a bid conformity confirmation module, a bid winning information confirmation module and a bid invitation data management terminal. According to the invention, bidding qualification qualification index analysis of each bidding unit in the engineering construction project is carried out through the qualification qualification index, the performance qualification index and the reputation qualification index of each bidding unit in the target engineering construction project, the comprehensiveness of the bidding qualification analysis result is ensured, the risk of the subsequent project implementation process is further reduced, and the project implementation efficiency is improved. Therefore, subsequent smooth promotion and overall benefit of the project are guaranteed, bidding conformity analysis of the bidding units is performed through quotation conformity and plan progress conformity of the qualified bidding units, and subsequent delay risk of the project is reduced.
Owner:HUBEI PROVINCIAL COMPLETE TENDERING CO LTD

Risk management and control method for engineering investment project

The invention relates to the field of engineering project management, in particular to a risk management and control method for an engineering investment project, which is used for carrying out risk assessment, feasibility assessment and fund assessment in a project implementation process and obtaining effect verification in the project. The method comprises the steps of obtaining an engineering quantity list of an engineering project, and establishing a virtual contract for the engineering project; inputting the engineering quantity list into basic contract information of the virtual contract; carrying out credibility scoring on the virtual contract according to the scoring model, and when the credibility score passes a threshold value, carrying out first evaluation dimension judgment and second evaluation dimension judgment on the virtual contract; and performing accuracy judgment on the virtual contract according to the two-factor decision model, and performing hierarchical management and control on the virtual contract according to the accuracy. The method for managing the project amount outside the contract is provided, structured processing and hierarchical management and control of the project amount outside the contract are achieved, and the problems of hidden cost loss and low management efficiency caused by lack of additional project amount management are effectively reduced.
Owner:HUMMINGBIRD CLOUD (SHANGHAI) INFORMATION TECHNOLOGY CO LTD

Standardized Collaboration System and Method Based on the Whole Project Life Cycle

The present invention discloses a standardized collaborative system and method based on the entire project life cycle, which relates to the technical field of project management. The present invention obtains the text data of real-time work orders by using text recognition technology; extracts historical projects from the project management platform to form a historical project set; extracts and marks the project feature data of each historical project; calculates the correlation degree value between the project feature data of the historical projects in the project feature set and the feature data of the first project; analyzes the association relationship between the historical project and the first project; constructs a project implementation fitting model according to the text data of the historical work orders; analyzes the task implementation situation corresponding to the work orders being implemented by the first project according to the project implementation fitting model, extracts abnormal work orders to generate a list of abnormal work orders, and sends them to the administrator. The accuracy of model fitting is improved, and the operation efficiency of the system is improved; the automated management of the entire project life cycle is realized, and the engineering implementation efficiency is improved.
Owner:上海市大数据中心

A Task Management System for Post-project Evaluation

The present invention provides a task management system for post-project evaluation, which belongs to the field of project management. The system includes: a parameter acquisition module: obtaining relevant information of historical post-project evaluation, and obtaining relevant parameters of each task in the project execution process based on the relevant information; a task analysis module: determining the task requirement index and task dependency of the corresponding task based on the relevant parameters of each task, and generating a first management plan; a task management module: tracking the deviation values ​​of various parameters for managing each task according to the first management plan based on the task manager; a management optimization module: optimizing the first management plan according to the task management optimization function and in combination with the deviation values ​​of various parameters, and obtaining a second management plan. Effective management of post-project data is ensured, and data analysis based on historical projects facilitates the implementation of subsequent new projects, thereby indirectly improving the efficiency of new project implementation.
Owner:HUANENG INFORMATION TECH CO LTD

Management method and system based on special construction project planning implementation scheme

The application provides a management method and system based on a special construction project planning implementation scheme, relates to the technical field of data management, and obtains project basic data through a preset database, performs risk identification and weight analysis, obtains a weight data set, performs scheme comparison and analysis, and obtains a scheme comparison sequence; performs forward verification and reverse verification according to the scheme comparison sequence, adjusts the scheme according to the forward verification result and the reverse verification result, determines a main selected scheme and an alternative scheme; and performs fit degree examination, analysis and adjustment on the main selected scheme and the alternative scheme, and obtains scheme management data; and the application greatly improves the intelligence and accuracy of project implementation management.
Owner:ZHEJIANG PROVINCIAL INST OF LAND & SPACE PLANNING

Project progress grading early warning method, device and equipment and storage medium

The invention discloses a graded early warning method and device for project progress, equipment and a storage medium. The method comprises the following steps: determining key activity execution data through a project key node according to project approval data of a target project; determining reference activity execution data through a project reference node according to the key activity execution data and the project approval data; determining implementation activity execution data through the project implementation node according to the reference activity execution data and the project approval data; determining a target activity execution path through the strategy management node according to the implementation activity execution data; the target activity execution path is verified through the strategy management node according to the reference activity execution data, the implementation activity execution data and the actual execution data, and a verification result is obtained; and through the strategy management node, according to the real-time progress verification result, early warning is performed on the target abnormal node. According to the scheme, the reliability and the real-time performance of project progress early warning are improved.
Owner:SHENZHEN COMTOP INFORMATION TECH

Engineering project multi-source management platform

The invention relates to the technical field of engineering project management, in particular to an engineering project multi-source management platform, which comprises a data acquisition module, a data analysis module, a data processing module and a data processing module, the project permission type determining module is used for calculating a project permission type tendency value based on the first complexity and the second complexity, and determining a project permission type based on a comparison result of the project permission type tendency value and a preset project permission type tendency value; the permission extension module is used for differentially extending project permissions when determining that the project has conflict data based on the project permission type and / or the sensitivity degree of the project conflict data; the authority recycling module is used for determining whether to recycle the extension authority or not based on whether the project stage is changed or not and / or whether the authority extension user meets the negative access condition or not, and multi-source engineering project management is achieved by improving the accuracy of authority dynamic management when conflict data occurs.
Owner:TIANJIN NINGTOU ENG TECH CONSULTING CO LTD

Offshore wind power project management system based on project implementation progress

An offshore wind power project management system based on a project implementation progress, which relates to the field of project management. The system comprises a project management center, which comprises a project data collection module, an offshore data collection module, a project resource management module, a project collaboration and sharing module, and a project early-warning management module, wherein the project data collection module collects project data information and project personnel data information; the offshore data collection module collects project implementation data and meteorological forecast data; the project resource management module sets project resource nodes and corresponding user permission data on the basis of the project data information and the project personnel data information; the project collaboration and sharing module sets corresponding project planning data on the basis of the project implementation data and the meteorological forecast data; and the project early-warning management module performs analysis on the basis of the project planning data and the project implementation data, so as to acquire project early-warning information. The system improves the security of project management.
Owner:CCCC HAIFENG WIND POWER DEV CO LTD

Project risk prediction avoidance method and system fused with deep learning

The invention belongs to the field of project risk prediction, and particularly relates to a project risk prediction avoidance method and system fused with deep learning, and the method comprises the steps: obtaining a project report and overall personnel configuration data, extracting project decomposition configuration data through employing a relation extraction decomposition model, building a project implementation node chain according to a graph theory, and carrying out the construction of a project implementation node chain according to a graph theory. The method comprises the following steps: implementing planning data from a single sub-project in a node chain through a correlation algorithm to obtain a relevance and non-relevance single sub-project set, constructing a configuration risk model based on a Bayesian algorithm optimized by a particle swarm algorithm, inputting the sub-project set to obtain a single and relevance configuration risk probability, and finally, constructing a configuration risk model. And according to the two risk probabilities, constructing a personnel configuration adjustment factor, configuring the personnel configuration adjustment factor to a node chain connection relationship, and dynamically adjusting the initial configuration of each single sub-project personnel until all nodes meet a preset risk probability threshold, thereby effectively coping with risks caused by personnel configuration in project implementation.
Owner:SHANGHAI XINGANG INFORMATION TECH CO LTD

Method, apparatus, electronic device and storage medium for project deployment

The present application provides a method, apparatus, electronic device, and storage medium for project deployment. Among them, in the method for project deployment, first, project information and project code of the project to be deployed are obtained. Then, based on the project information, project registration of the project to be deployed is performed under a preset main project directory. A pre-trained software security detection model is called to process the code of the project to be deployed to obtain a project security score; wherein, the software security detection model is pre-trained according to preset sample data. Finally, project deployment is performed on the projects to be deployed whose project security scores are greater than a preset value. The method of the present application adopts a mode of merging multiple front-end projects and deploying them under the main project directory, which is convenient for unified management, and each project does not need to apply for a Web server separately, saving a large amount of resources. At the same time, the project code can be automatically audited, reducing the risks of project implementation and operation.
Owner:CHINA CONSTRUCTION BANK

Project full-life-cycle investment assessment method and system based on multi-dimensional cost-benefit analysis

PendingCN121526380AInstrumentsInvestment evaluationCost–benefit analysis
The invention discloses a project full-life-cycle investment evaluation method and system based on multi-dimensional cost-benefit analysis, and relates to the technical field of planning project benefit evaluation.According to the project full-life-cycle investment evaluation method and system based on multi-dimensional cost-benefit analysis, multi-dimensional benefit indexes are obtained, comprehensive benefit analysis is carried out, project profit analysis is carried out in combination with operation and maintenance cost, discount rate and project construction cost, and the project benefit evaluation efficiency is improved. Dynamic integration of multi-dimensional benefits and cost after project implementation is realized, and implementation effects of the project in a full life cycle can be truly reflected after external interference factors are eliminated; meanwhile, a traditional static financial evaluation framework is broken through, a dynamic multi-dimensional evaluation system with discount revenue as the core is established, the influence of multi-dimensional benefit indexes such as economic benefits, operation benefits and strategic benefits on project values is considered, the adaptability to different industry projects and scenes is guaranteed, and the method is suitable for popularization and application. And the comprehensive value of the project in the whole life cycle can be accurately evaluated.
Owner:ZHUHAI POWER SUPPLY BUREAU GUANGDONG POWER GIRD CO