Project management system

A technology of project management system and processing system, which is applied in the field of engineering project monitoring, can solve the problems of unguaranteed progress plan, real-time monitoring, large human resources, etc., and achieve the effect of simple monitoring and processing process, convenient judgment and saving human resources

Inactive Publication Date: 2017-02-15
广东达安项目管理股份有限公司
View PDF4 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

On the one hand, this processing method requires supervisors to run to complete the monitoring process, which consumes a lot of human resources
In addition, because the manual supervision method is intermittent on site, it cannot monitor the operation process in real time. When problems are often found, the project has already been carried out for a period of time, and it is difficult to correct deviations in time.
More importantly, the supervision and control of the project schedule time in the existing technology is usually carried out through manual adjustment, which is not only troublesome to operate, but also prone to problems that the schedule cannot be guaranteed due to human factors

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] A project management system comprising:

[0036] The project progress database is composed of different time nodes and corresponding completion item data, each time node and corresponding completion items form a set of data groups, and the project progress database is stored in memory;

[0037] Project schedule schematic diagram, generated according to the project schedule database and displayed through the display device;

[0038] The project progress monitoring system obtains the project progress of the processing system at the place of implementation, and monitors whether the project implementation progress is carried out according to the plan of the project progress diagram according to the project progress diagram;

[0039] The project standard template picture generated according to the project construction design drawing, the project standard template picture has feature information of multiple groups of characteristic objects, and the project standard template p...

Embodiment 2

[0066] A project management system, other features are the same as those in Embodiment 1, the difference is that: when the processing system at the project implementation site receives a non-compliant order, adjust the construction operation, and adjust the corresponding completion time of the construction operation to be T, then the project progress processing The system adds T to the time node data of the current completed item in the database to overwrite and update;

[0067] The project progress processing system calculates the quantity M of other completed items completed after the current completed item in the database, and adds T / M to the time nodes corresponding to other completed items completed after the current completed item in the database and performs coverage update.

[0068] The project management software can adjust the time points of each completed item according to the actual progress of the project to ensure the effective completion of the project.

[0069]...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A project management system is disclosed and comprises a project progress database, a project progress sketch map, a project progress monitoring system, a project standard template picture which is generated via a project construction design drawing, a project implementation site imaging system, an implementation site processing system and a remote monitoring terminal. Via the project management system, a project implementation site can be monitored remotely; monitoring operation can be conducted in a simple, convenient and direct manner; manpower resources can be saved. Feedback on construction conditions of an implementation site can be given timely due to real time monitoring operation, convenience of determining operation can be realized, and high result accuracy can be achieved. Project progress can be automatically adjusted and monitored according to change of implementation conditions via the project management system, and project completion time can be effectively monitored.

Description

technical field [0001] The invention relates to the technical field of engineering project monitoring, in particular to a project management system. Background technique [0002] In some engineering projects such as communications and construction, it is usually necessary to arrange supervisors to supervise on-site to ensure that the engineering projects can be completed according to the preset time. On the one hand, this processing method requires supervisors to run to complete the monitoring process, which consumes a lot of human resources. In addition, because the manual supervision method is intermittent on site, it cannot monitor the operation process in real time. When problems are often found, the project has already been in progress for a period of time, and it is difficult to correct deviations in time. More importantly, the supervision and control of project schedule time in the existing technology is usually carried out through manual adjustment, which is not onl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06T3/40
CPCG06Q10/0631G06T3/4038
Inventor 李涛庄烈忠李祥李庆彬
Owner 广东达安项目管理股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products