Project management system
A technology of project management system and processing system, which is applied in the field of engineering project monitoring, can solve the problems of unguaranteed progress plan, real-time monitoring, large human resources, etc., and achieve the effect of simple monitoring and processing process, convenient judgment and saving human resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0035] A project management system comprising:
[0036] The project progress database is composed of different time nodes and corresponding completion item data, each time node and corresponding completion items form a set of data groups, and the project progress database is stored in memory;
[0037] Project schedule schematic diagram, generated according to the project schedule database and displayed through the display device;
[0038] The project progress monitoring system obtains the project progress of the processing system at the place of implementation, and monitors whether the project implementation progress is carried out according to the plan of the project progress diagram according to the project progress diagram;
[0039] The project standard template picture generated according to the project construction design drawing, the project standard template picture has feature information of multiple groups of characteristic objects, and the project standard template p...
Embodiment 2
[0066] A project management system, other features are the same as those in Embodiment 1, the difference is that: when the processing system at the project implementation site receives a non-compliant order, adjust the construction operation, and adjust the corresponding completion time of the construction operation to be T, then the project progress processing The system adds T to the time node data of the current completed item in the database to overwrite and update;
[0067] The project progress processing system calculates the quantity M of other completed items completed after the current completed item in the database, and adds T / M to the time nodes corresponding to other completed items completed after the current completed item in the database and performs coverage update.
[0068] The project management software can adjust the time points of each completed item according to the actual progress of the project to ensure the effective completion of the project.
[0069]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com