Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

53 results about "Project completion" patented technology

Project completion is often the most neglected phase of the project life cycle. Once the project is over, it’s easy to pack things up, throw some files in a drawer, and start moving right into the initiation phase of the next project.

Distributed collaborative office data processing method and system

The invention relates to the technical field of enterprise data management, in particular to a distributed collaborative office data processing method and system, and the method comprises the following steps: based on employee task completion records, evaluating various capability processing capabilities of employees through extracting and analyzing the project completion data, feedback frequency and interaction data of the employees, and calculating the task completion data of the employees; the task process of the current project is analyzed, the requirements of the target project for various skills are identified, and a capability and requirement data set is formed; according to the invention, through real-time monitoring and analysis of interaction data and feedback frequency of employees, capability of the employees is accurately assessed and project requirements are matched, reasonable human resource configuration is realized and flexibility of project management is improved, and through dynamic adjustment of data access authority, information security is ensured and a data leakage risk is reduced. Real-time data synchronization and consistency verification guarantee that data is accurate among multiple nodes, the team is helped to identify the reason of low efficiency in combination with analysis of cooperation efficiency, and the cooperation efficiency among team members is enhanced.
Owner:蔡霖

Intelligent system for automating project workflows and predicting project progress using artificial intelligence

A system for intelligent automation of project processes and prediction of project progress, including: (a) an AI-driven task automation module (101) for intelligent task allocation based on expertise and workload; b) a real-time monitoring and reporting module (102) to track project progress and provide real-time insights; (c) a predictive progress analysis module(103) that uses machine learning to predict project completion and identify risks; d) an adaptive workflow management engine (104) for dynamically reconfiguring workflows in response to project changes; (e) an integration and communication interface (105) for seamless interoperability with third-party project management tools.
Owner:ISSA GHASSAN PROF +4

Method for adjusting inertial sensing range and sensitivity

The invention provides an inertial sensing range and sensitivity adjusting method, which belongs to the technical field of parameter adjustment, and comprises the following steps: after an item opening instruction is obtained, obtaining basic information of a moving body, and calling an adaptive sensing range according to the basic information; different detection nodes are set in the whole process before a project is started, the feedback degree of a moving body is recorded in sequence when execution is carried out to each node, values of corresponding positions of an internal curve are increased or decreased according to the feedback degree, and corresponding sensitivity is dynamically set according to the internal curve. The feedback speed and external performance of the moving body are judged in the project execution process, and the follow-up content and links of the project are adjusted in combination with the action model library till the project is completed or closed. The inertial sensing range and sensitivity adjusting method provided by the invention can carry out specific dynamic adjustment according to the state of the moving body and the actual situation, has strong pertinence and ensures smooth completion of a project.
Owner:MT MICROSYST

Engineering consultation management system based on big data

The invention relates to the technical field of constructional engineering informatization, and discloses an engineering consultation management system based on big data. Collecting data of material declaration price, market average price, project submission amount, project review amount, change amount cumulant, contract initial amount, project payment paid proportion and project actual completion progress in project cost through access of multi-source heterogeneous data; and the data processing module is used for processing and analyzing the data acquired by the data acquisition module so as to calculate the deviation condition of the material unit price, the deviation condition of the engineering quantity, the density condition of the change signature and the payment deviation condition of the progress money. According to the method, comprehensive collection of multi-source heterogeneous data is adopted, the problem that a traditional system is single in data source is solved, the information coverage range is widened, and false or missing information in the project cost is rapidly judged through an integrated calculation engine.
Owner:SUZHOU KUNZHI INFORMATION TECH CO LTD

Building engineering cost data analysis and management system and method

The invention provides a building engineering cost data analysis management system and method, and the method comprises the steps: traversing historically completed engineering projects, dividing the projects based on project types, and carrying out the difference analysis of the project cost data of the projects of the same type; in the completed engineering project, obtaining the influence of regional environmental factors in the engineering project on the cost; analyzing the influence of the construction data in the completed engineering project on the cost, and generating an analysis result; according to the method, the influence of the same completion time in different environments on the construction cost, the influence of different completion time in different environments on the construction cost and the influence of different completion time in the same environment on the construction cost are obtained by analyzing the construction cost data of the historical projects; in combination with the influence of the environment on the completion time, the precise cost data of the project can be obtained through analysis screen matching, so that the project can be maintained in a certain cost range on the premise of ensuring the high efficiency of the project completion time.
Owner:SHENZHEN PENGYUAN DECORATION ENG CO LTD

Personal portrait generation method and system of smart personnel management platform

The invention provides a figure portrait generation method and system of a smart personnel management platform, and relates to the technical field of data processing. The method comprises the steps of collecting basic attribute data, work description text data and work behavior data of a to-be-portrayed staff; determining a work performance value of the to-be-portrayed staff based on the work behavior data; determining a project importance degree based on the total fund investment and the basic attribute data of each participant, determining a project completion degree based on a project completion rate and project time consumption, and determining a project comprehensive complexity based on the project importance degree and the project completion degree; determining the context weight of each participating project by combining the comprehensive complexity of the historical project, and determining the contribution quality of the staff to be portrayed based on the work performance value and the context weight; determining a staff capability evaluation value based on the work description text data; and determining a staff comprehensive ability value based on each contribution quality and the staff ability evaluation value, and generating a visual figure portrait of the staff to be portrayed. According to the invention, the portrait can be more accurately generated.
Owner:HUNAN DABANG DIGITAL SOFTWARE CO LTD

Project project completion progress evaluation method and system

The invention is suitable for the technical field of completion progress assessment, and particularly relates to a project completion progress assessment method and system, and the method comprises the steps: obtaining a construction plan of a project, delimiting construction points, carrying out the connection to obtain a patrol route for progress assessment, collecting the image data of the patrol route through a panoramic camera, and carrying out the assessment of the project completion progress. Splicing is carried out to obtain a panoramic image, and the construction point position is marked in the panoramic image; and reading the change characteristics from the construction point location, determining the deployment position of the card reader, and obtaining the use permission of the RFID tag integrated in the safety helmet in advance. By comparing the standard progress with the panoramic image, the construction progress can be grasped in time, the difference between the actual progress and the standard progress can be quickly identified, a data basis is provided for project progress evaluation, and the construction point location which is not inspected on time can be found by determining the activation window, so that the timeliness of the panoramic image is ensured, and the project progress evaluation efficiency is improved. And the accuracy of completion progress evaluation is greatly improved.
Owner:ETS VISION (BEIJING) TECH CO LTD

Labor service force and energy distribution method and device based on dynamic weight, medium and product

The invention discloses a labor capability allocation method and device based on a dynamic weight, a medium and a product, and the method comprises the steps: obtaining the complexity and personnel skill data of each task in response to a project labor capability allocation request; based on the dynamic coupling model, calculating the real-time matching degree of the personnel and the tasks in combination with the dynamic weight factors corresponding to the tasks; then, according to a matching result and multi-dimensional constraints such as project cost and time, a multi-objective optimization algorithm is adopted to generate an optimal labor force and energy distribution scheme and expected progress data; after the scheme is executed, the actual progress of the project is monitored in real time and compared with expected data; if the deviation exceeds a set threshold value, a feedback mechanism is triggered, the personnel skill data and the dynamic weight factor are updated, the matching and optimizing process is restarted, and closed-loop self-adaptive management of the whole period of the project is achieved until the project is completed, and the technical scheme of the embodiment of the invention remarkably improves the accuracy of resource allocation and the self-adaptive capacity of project management.
Owner:SHENZHEN COMTOP INFORMATION TECH

A method and system for storing project completion data

The present invention is applicable to the field of data storage technologies, and particularly relates to a method and system for storing project completion data. The method includes: obtaining project completion data, clustering it into several categories, and performing packet encapsulation to obtain data packets; extracting the data summary and key information of each data packet, creating an authentication system, transferring all the data packets into the authentication system, using a preset hash function to hash the data summary, defining the obtained hash value as a location identifier, and establishing a correspondence relationship among the data summary, key information, and location identifier; selecting storage nodes, configuring the attributes of each storage node, and based on the attributes, dividing the storage nodes into high-speed nodes and cloud nodes. The present invention can enhance data security, prevent data abuse and leakage, greatly improve data storage efficiency, and ensure the user experience by determining the final data and target permissions.
Owner:ETS VISION (BEIJING) TECH CO LTD

A Machine Learning Method Based on Engineering Project Contract Data

This invention relates to the field of machine learning technology, specifically disclosing a machine learning method based on engineering project contract data, comprising the following steps: Step S1: Collect historical engineering project contract data, including factor values ​​and project progress at each time point; calculate the impact sensitivity and sensitive impact value of each factor, distinguishing between high-sensitivity factors and low-sensitivity factors; Step S2: Set a monitoring interval, collect factor values ​​and project progress data in real time; dynamically correct the sensitive impact value of high-sensitivity factors based on real-time data, generate correction parameters, and ensure that the model adapts to the latest project status; Step S3: Combine the correction parameters of high-sensitivity factors and the fixed sensitivity values ​​of low-sensitivity factors to predict the project completion time interval; calculate the probability value of a reasonable long payment period for the project based on the comparison between the predicted time and the actual planned time; This method improves the accuracy of engineering project progress prediction by dynamically adjusting key factor parameters.
Owner:STATE GRID MATERIAL CO LTD

Safety early warning method and system based on engineering project multi-source data

The invention relates to the technical field of engineering data analysis, in particular to a safety early warning method and system based on engineering project multi-source data, and the method mainly comprises the steps: obtaining the standard reaching rate of a current project based on the total completion degree of the project and the total completion degree of a target project; and based on the first early warning index and a judgment threshold value, outputting a result of sending out early warning at present, if the early warning result is not sent out, judging whether the current project completion degree is greater than or equal to the target project completion degree, and correcting the calculation weight of the first sub-project related to the first early warning model to obtain a second early warning model. Through the above method, the data collected in each sub-project is analyzed, and comprehensive consideration is carried out in combination with the condition of the current project progress, so that a more accurate reference result is obtained, and workers can use the reference result and take more accurate countermeasures.
Owner:ZHONGJIN GUANDA ENG CONSULTING GRP CO LTD

Project group owner risk cost optimization method under uncertain delay perspective

The invention discloses a project group owner risk cost optimization method under an uncertain delay perspective. The method comprises the following steps: generating a plurality of groups of project group delay scenes by using a Monte Carlo method; putting forward a prediction model based on a GNN-GRNN algorithm, taking the predicted completion time of each project and the completion degree of each project as the input of the GNN algorithm to obtain an association relationship among the projects, inputting the three kinds of data into the GRNN algorithm on the basis of a generated delay scene, and predicting the project group material demand quantity at the next moment; constructing a project group owner risk cost optimization model under an uncertain delay perspective; and the optimization model is solved by using a DDPG algorithm to obtain the material supply amount at the next moment, the project hurry-up strategy and the risk cost after optimization, so that the decision-making difficulty of a manager is reduced.
Owner:HOHAI UNIV

Construction organization whole-process management system

The application discloses a construction organization whole-process management system, which is suitable for a railway construction process and comprises an interactive sharing platform, a preliminary management module, an execution period management module and a completion period management module, wherein the interactive sharing platform is a center for information sharing and data exchange of construction participants and is used for monitoring abnormal construction processes; the preliminary management module performs preliminary analysis according to shared data and uploads the preliminary analysis to the interactive sharing platform in real time; the execution period management module supervises progress and quality in a construction execution process, generates efficiency and quality analysis results and uploads the efficiency and quality analysis results to the interactive sharing platform; the completion period management module acquires customer internal acceptance information after completion, analyzes differences between the acceptance information, summarizes the differences, generates a project delivery report and uploads the project delivery report to the interactive sharing platform; and the tracing module is used for storing data of various construction projects in categories; the whole-process management system realizes information sharing of the railway construction process, supervision and early warning of abnormal construction, increases experiences of customer parties and railway management parties, improves project completion capability and customer satisfaction and realizes data tracing.
Owner:INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +4

Electric power engineering project progress prediction method, system and device and storage medium

The invention provides an electric power engineering project progress prediction method, system and device and a storage medium, and relates to the technical field of electric power engineering, and the method comprises the steps: dividing an electric power engineering project into a plurality of engineering sub-projects, and obtaining the construction data of a construction team corresponding to each engineering sub-project, and the associated data between the engineering sub-projects; calculating the first construction efficiency of each construction team according to the construction data; determining a first influence index according to the associated data, and adjusting the first construction efficiency and the second construction efficiency according to the first influence index; obtaining a construction environment of each project sub-project, and determining a second influence index according to the construction environment; and adjusting the second construction efficiency according to the second influence index, generating the target construction efficiency of each construction team, and determining the completion time of the electric power engineering project according to the target construction efficiency. The technical effect of the invention is that the deviation between the prediction result of the project completion time and the actual situation is reduced.
Owner:BEIJING SONGDAO RYODEN POWER ENG CO LTD

A method, system, and medium for evaluating employee performance based on project completion.

This application discloses a method, system, and medium for evaluating employee performance based on project completion, solving the technical problem in existing enterprise management where it is impossible to conduct refined evaluations of employee work performance using project data from completed projects. The method includes: determining a project knowledge graph based on project data from completed projects by the employee to be evaluated; acquiring historical project data and training a preset model based on this data to determine a scoring model; wherein the preset model includes a first preset model and a second preset model, and the scoring model includes a single-module scoring model and a comprehensive scoring model; the single-module scoring model is a model for determining the score obtained by the employee in completing a certain module of the project; and determining the comprehensive score of the employee's completed project based on the project knowledge graph and the scoring model. This application achieves refined evaluation of employee work performance through the above method.
Owner:INSPUR ZHUOSHU BIG DATA IND DEV CO LTD

Engineering quantity list intelligent review method

The invention relates to the field of project management, in particular to an intelligent project quantity list review method, which comprises the following steps of: extracting each factor point influencing project completion settlement in a historical project according to a historical database, and screening each key influence factor point influencing project completion settlement in the project through calculation; the project amount completion settlement list is imported from the project management system through the data interface, then standardization processing is carried out on the project amount completion settlement list according to all key influence factor points influencing project completion settlement in the project, and finally data abnormal points of the project amount completion settlement list after standardization processing are recognized. According to the technical scheme, the method can be used for assisting review personnel to better understand the condition of an engineering project and find potential problems and abnormities, meanwhile, the digital system can record each step and decision in the review process, subsequent supervision and auditing are facilitated, the fairness and compliance of the review process are ensured, multi-person real-time cooperative operation is achieved, and the working efficiency is improved.
Owner:雄安新区财政投资评审中心

Project completion management method and system

The invention is suitable for the technical field of completion data management, and particularly relates to a project completion management method and system, and the method comprises the steps: reading target data of project completion management, segmenting the target data into a plurality of blocks, configuring unit numbers, recognizing participating individuals of each file unit, and setting an execution sequence, the unit numbers are written into a preset template, verification requests are generated, signature windows are integrated, and the verification requests are sequentially issued to the equipment terminals of the corresponding participating individuals according to the execution sequence; receiving feedback data uploaded by the participated individuals, intercepting signature snapshots, carrying out sequential numbering, clustering pixel points in the signature snapshots into foreground pixels and background pixels, and traversing the pixel number of each foreground pixel; according to the invention, by constructing the cooperative processing architecture, the allocation of storage resources can be optimized, the data security, the storage efficiency and the access performance are considered, and the management level of project completion data is greatly improved.
Owner:BEIJING AEROSPACE LIANZHI TECHNOLOGY CO LTD

Project development data management method, system and equipment based on artificial intelligence and medium

The invention relates to a project development data management method and system based on artificial intelligence, equipment and a medium. The method comprises the steps of establishing a resource index database based on a preset container mirror image database in combination with received task description and project anchor points, generating a development scheme, executing data modification operation in an independent container based on the development scheme, and generating a detailed operation log; receiving a process instruction of a user in a project development process, and generating an instruction context in combination with a current project state; a response result is generated through the AI model module, automatic operation in the independent container is executed, and an instruction execution log is generated; when project development is completed, whether project resources such as detailed operation logs and instruction execution logs in the independent containers are complete or not is verified; and if so, packaging the project resources and submitting the project resources to a project warehouse. By adopting the method, the problems of environment isomerism, data dispersion, unsmooth AI interaction and the like in traditional development can be effectively solved, and the cooperation efficiency is remarkably improved.
Owner:赖金燕

Project management system

A project management system disclosed by the present invention comprises a project input module, a fund monitoring module, a project implementation monitoring module and a project after-sales module, the project input module inputs an initiated project based on a block chain and determines project details, and the fund monitoring module carries out fund supervision on the established project. The project implementation monitoring module is used for project decomposition, distribution and implementation, the project after-sales module is used for monitoring the project completion progress, and the project input module comprises a member registration sub-module for registration and use based on a block chain. The sealing and testing sub-module is used for testing the performance, and the member registration sub-module is used for sealing a block chain interface; the information scanning sub-module is used for automatically inputting the uploaded contract or protocol; and the login module is used for accessing the packaged block chain interface. According to the invention, through integration of social resources and a block chain technology, a safe, efficient and extensible project management solution is provided for enterprises.
Owner:HEBEI XIONGAN KELIN ENTERPRISE MANAGEMENT CONSULTING CO LTD

Systems and methods to prioritize resources of projects within a collaboration environment

Systems and methods to prioritize resources of projects within a collaboration environment are described herein. Exemplary implementations may: manage environment state information maintaining a collaboration environment, the environment state information including prioritized resource information identifying prioritized resources associated with units of work that support fulfilment of projects; manage information defining project-level graphical user interfaces of the projects; effectuate presentation of individual ones of the project-level graphical user interfaces including representations of prioritized ones of the resources for the individual projects; and / or perform other operations.
Owner:ASANA INC

Method and apparatus for providing recommendations for completion of an engineering project

Provided is a recommendation engine to provide automatically recommendations for the completion of an engineering project, the recommendation engine including: a first artificial intelligence, AI, module adapted to provide latent representations of a sequence of selected items; and a second artificial intelligence, AI, module adapted to process the latent representations of the sequence of selected items provided by the first artificial intelligence, AI, module to generate at least one sequence of complementary items required to complement the sequence of selected items to provide a complete sequence of items output via an interface as a recommendation to complete the engineering project.
Owner:SIEMENS AG

Project progress management method and device, electronic equipment and storage medium

The invention relates to the technical field of evidence encryption, in particular to a project progress management method and device, electronic equipment and a storage medium. According to the scheme, the method comprises the steps of obtaining item building information; obtaining target supplier information based on a preset supplier registration system; determining bid-winning suppliers and non-bid-winning suppliers based on the target supplier information and the project bid evaluation result; based on the non-bid-winning suppliers, sending a non-bid-winning supplier deposit return instruction; obtaining project result data, and initiating a project archiving process; based on the project archiving process, the project corresponding to the project construction information is completed, after each step is completed, a 100% progress bar is updated in real time, the project progress can be visually displayed, the capability and efficiency of a project manager in project management and execution aspects can be reflected, the progress standard is unified, and the project management efficiency is improved. The progress, the completion condition and the existing problems of the project are displayed more visually and clearly, so that a project manager is helped to better manage the project, and the project completion degree is improved.
Owner:SHANGHAI ZHONGSHI CONSTRUCTION CONSULTING CO LTD

Systems and methods to prioritize resources of projects within a collaboration environment

Systems and methods to prioritize resources of projects within a collaboration environment are described herein. Exemplary implementations may: manage environment state information maintaining a collaboration environment, the environment state information including prioritized resource information identifying prioritized resources associated with units of work that support fulfilment of projects; manage information defining project-level graphical user interfaces of the projects; effectuate presentation of individual ones of the project-level graphical user interfaces including representations of prioritized ones of the resources for the individual projects; and / or perform other operations.
Owner:ASANA INC

Scientific research project information management method and system and computer equipment

The invention relates to the technical field of project management, and provides a scientific research project information management method and system and computer equipment. According to the implementation scheme, in response to a project approval request, achievement conversion pre-planning is executed on project basic information of the project approval request so as to construct an input-output reference model; instantiating the scientific research project metadata in the state change event to generate instantiated digital assets; in response to the question settlement request, matching a corresponding target instantiated digital asset and a target input-output reference model through a project identifier of the question settlement request; performing difference analysis on the target instantiated digital assets and the target input-output reference model to generate a technical readiness final evaluation report; and calculating a profit distribution scheme based on the technical readiness ultimate report, and storing the profit distribution scheme and the technical readiness ultimate report in a data storage layer in an associated manner. According to the embodiment of the invention, the intelligent management level of scientific research project data in project establishment, project settlement and achievement transformation stages is improved.
Owner:GUANGZHOU HKUST FOK YING TUNG RES INST

Project risk prediction method and device, equipment, storage medium and program product

The invention relates to a project risk prediction method and device, equipment, a storage medium and a program product. The method comprises the following steps: acquiring comprehensive information and change information of a target project; analyzing and processing the comprehensive information and the change information by using a pre-trained factor analysis model to obtain a factor list influencing the completion condition of the target project; and performing prediction processing by using a pre-trained risk prediction model and the factor list to obtain a risk prediction result of the target project, the risk prediction result being used for representing a probability that the target project cannot be completed on schedule. By adopting the method, the efficiency is high, and the risk can be accurately and timely predicted.
Owner:CHINA TELECOM CLOUD TECH CO LTD

Task allocation method and device

The present invention provides a task allocation method and device, belonging to the field of cloud computing technology. The task allocation method comprises: obtaining a label factor, a label of a task to be allocated, labels of n IDs to be matched, and a maturity base of the n IDs to be matched; wherein n is an integer greater than 1; determining the decision factors of the n IDs to be matched according to the label factor, the label of the task to be allocated, the labels of the n IDs to be matched, and the maturity base of the n IDs to be matched; and allocating the task to be allocated to the ID to be matched corresponding to the minimum decision factor among the n decision factors. The present invention can realize the automatic allocation of tasks, reasonably arrange production, improve the efficiency of task completion, and reduce project completion time and project cost.
Owner:INDUSTRIAL AND COMMERCIAL BANK OF CHINA

Production project completion commissioning research and judgment method and device based on large model, storage medium and computer equipment

The invention discloses a production project completion commissioning research and judgment method and device based on a large model, a storage medium and computer equipment. The method comprises the steps of obtaining production project total data of different power projects from a plurality of production project management systems; the production engineering management system comprises a production management system, a risk control platform, a financial system, a material management system and a document management system. Integrating the production project total data through a pre-trained large model to form a production project data set of each electric power project; the production project data set corresponding to each electric power project is analyzed to determine whether each electric power project has completion and production state abnormity or not, and the completion and production state abnormity comprises false completion, uncompleted first settlement and completion unreported.
Owner:CONSTR BRANCH CHONGQING ELECTRIC POWER

Power consumption project acceptance management and control method for power distribution operation and inspection center

The invention relates to the technical field of power distribution operation and inspection center power utilization project management, and discloses a power distribution operation and inspection center power utilization project acceptance management and control method, which comprises the steps of newly establishing an approval process, filling a plan list, distributing the filled plan list to a user, and logging in a system by the user. All to-do lists in a project are distributed in advance according to user information, then a user completes the to-do lists and power consumption project acceptance of a power distribution center, finally the completed power consumption project is stored in a management and control center system, a power consumption project calling and modifying interface is reserved, and user operation records are stored in a management and control center. Power distribution and utilization project operation of a user is monitored in real time, the project acceptance data maintenance accuracy and efficiency are effectively improved, and the benefits of a power grid are ensured.
Owner:NANJING YUHONG SOFTWARE TECHNOLOGY CO LTD

Intelligent management method, device, system, medium and program for scientific research projects

This application provides an intelligent management method, device, system, medium, and program for scientific research projects. The method includes: retrieving project documents related to the target project from a project management module based on the project status; matching the project documents with metadata rules to generate structured metadata, and assigning security classification tags to the project documents based on the structured metadata; generating a document set for the target project in response to a project status indication of project completion, and uploading it to an output repository; when the target document needs to be processed, retrieving the target document from the document set of the target project in the output repository based on the structured metadata, and invoking the corresponding access control mechanism for processing based on the security classification tags. This method automatically triggers the capture of project documents based on the project status, and combines metadata and security classification tags to form a secure document set that enables document reuse, greatly improving the efficiency and security of document processing.
Owner:ZHEJIANG HENGYI PETROCHEMICAL RES INST CO LTD