119 results about "Project completion" patented technology

Project completion is often the most neglected phase of the project life cycle. Once the project is over, it’s easy to pack things up, throw some files in a drawer, and start moving right into the initiation phase of the next project.

Implementation resource project management

A method and apparatus provides management of projects including breaking the project into tasks and task dependencies and assigning employees as resources to work on the task dependencies. Resources are evaluated based on skills, experience with applications, distance to work site, customer satisfaction rating of prior work and availability. Progress on the project is monitored by input of employee time into the system. Projected completion dates, start dates of subsequent projects and resource allocation is automatically determined as changes in project progress and resources occur.
Owner:WELLS ROBERT FRANCES

Predicting likelihood of on-time product delivery, diagnosing issues that threaten delivery, and exploration of likely outcome of different solutions

A task effort estimator may determine a probability distribution of an estimated effort needed to complete unfinished tasks in a project based on one or more of a set of completed tasks belonging to a project and attributes associated with the completed tasks belonging to the project, a set of completed tasks not belonging to the project and attributes associated with the completed tasks not belonging to the project, or the combination of both. A project completion predictor may determine a probability distribution of completion time for the project based on the probability distribution of an estimated effort needed to complete the unfinished tasks in the project, and one or more resource and scheduling constraints associated with the project.
Owner:GREEN MARKET SQUARE LTD

Project management method and system

Embodiments of the invention relate to a project management method and system. The method comprises the steps that a server receives project approval information input by a user; subject splitting is performed according to the project approval information to obtain a plurality of subprojects of different subjects, and each subproject is subjected to project flow splitting according to quality specification information to obtain project supervision list item data; a budget forecasting registration list and supervision work order data are generated according to the project supervision list item data; a mobile terminal device displays the supervision work order data as a supervision work order, receives quality control supervision information and field cost payout data input in the supervision work order by a supervisor, and sends the quality control supervision information and the field cost payout data to the server; the server generates a project actual progress management report, matches the project actual progress management report with a preset project progress forecasting report, and generates project progress early warning prompt information when estimated project completion time leads or lags; and an expense payout registration report is generated according to the field cost payout data, and project payout early warning prompt information is generated when actual expense payout is inconsistent with a budget.
Owner:北京诚公管理咨询有限公司

OA intelligent office system and management method thereof

InactiveCN105260858ARealize Signing OpinionsRealize functionResourcesSystems managementProject completion
The invention relates to an OA intelligent office system and a management method thereof. The system comprises a system function module responsible for the system code settlement, the role authorization management service and the message notification service, a working module responsible for the outgoing message management, the incoming massage management, the basic settlement, the to-be-done job settlement, the job inquiry, the process log, the overtime statistics and the project completion data filing, and a system management module responsible for the administrative office settlement, the information exchange settlement, the timed task management, the workflow settlement and the organization mechanism settlement. The working module acquires the usage authorization information, the login information and the message reminding of a user by means of the system function module. The system management module acquires the data of the system authorization management, the settlement data of the workflow, the settlement data of roles in the company of the above user and the settlement data of document templates by means of the system function module. The working module acquires the operating authorization of incoming massages and outgoing messages, the job inquiry authorization and the division basic data of project completion items by means of the system management module. According to the invention, the electronic signature technology, the project management service management and the OA office flow function are integrated.
Owner:苏州天地微易智能科技有限公司

BIM simulation and aerial photography combined construction management and control method and system

The invention discloses a BIM simulation and aerial photography combined construction management and control method and system. The method comprises the following steps of outputting a BIM three-dimensional model of a building; according to demands for information acquisition, selecting a characteristic coordinate point needed to be tracked and recorded in advance on the BIM three-dimensional model; an unmanned aerial vehicle arriving at the corresponding position matched with the selected characteristic coordinate point of the entity building, collecting entity engineering characteristic information, and sending the collected entity engineering characteristic information to a monitoring computer; establishing an entity three-dimensional model on the monitoring computer with the entity engineering characteristic information of the same positioning coordinate point which is sent to the monitoring computer by the unmanned aerial vehicle; matching, associating and comparing the entity three-dimensional model with the BIM three-dimensional model of the same characteristic coordinate point in one-to-one manner, automatically finding "matched" and "unmatched" items of the both models, and outputting a project completion comparison report. The system and the method can timely, conveniently and accurately master the construction progress and the construction effect of the building entity, the construction progress can be integrally regulated and controlled conveniently, the construction period is shortened, and the profit is improved.
Owner:SHENZHEN GRANDLAND DECORATION GROUP

Determination of Projected Carrier Assignment

A computer implemented method, a data processing system, and a computer program product determine carrier selection based on variable volumetric weight and variable completion times. A product is identified for production. The product for production has a variable weight and a variable dimension based on components included in the product for production. A projected volumetric weight of the product for production is determined. A projected completion time of the product for production is determined. A projected carrier assignment of the product for production is then determined in response to determining the projected volumetric weight of the product for production and determining the projected completion time of the product for production.
Owner:IBM CORP

Collectively optimizing group schedules to minimize project completion time and cost

A system and method for collectively optimizing group schedules to minimize completion time and project cost is disclosed. The method of some embodiments uses optimization techniques to collectively minimize the time and cost for the whole project, given the tasks, members and their attributes and dependencies. The system includes a project and task data store, a data validation engine, an analytics and correlation engine to resolve task prerequisites and dependencies, an optimizer to identify optimal task schedules according to a set of team members and associated project attributes, and an output generator to format a project calendar with all tasks and member assignments.
Owner:JOGALEKAR PRACHI PRASAD +2

Project management system

A project management system is disclosed and comprises a project progress database, a project progress sketch map, a project progress monitoring system, a project standard template picture which is generated via a project construction design drawing, a project implementation site imaging system, an implementation site processing system and a remote monitoring terminal. Via the project management system, a project implementation site can be monitored remotely; monitoring operation can be conducted in a simple, convenient and direct manner; manpower resources can be saved. Feedback on construction conditions of an implementation site can be given timely due to real time monitoring operation, convenience of determining operation can be realized, and high result accuracy can be achieved. Project progress can be automatically adjusted and monitored according to change of implementation conditions via the project management system, and project completion time can be effectively monitored.
Owner:广东达安项目管理股份有限公司

Exploring the impact of changing project parameters on the likely delivery date of a project

A user may be allowed to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project. The probability distribution of completion time of the project may be recomputed based on the change. The recomputed probability distribution of the completion time of the project may be presented. An option to save the recomputed probability distribution may be provided. An option may be provided to specify another change in one or more parameter data associated with the project and repeat the recomputing and the presenting procedures based on another change in one or more parameter data associated with the project.
Owner:GREEN MARKET SQUARE LTD

Project progress dynamic regulating method considering resource constraint

The invention discloses a project progress dynamic regulating method considering resource constraint. The project progress dynamic regulating method aims as the problems that the construction period requirements are too ambiguous and harsh, the resource constraint and progress fusion are not tight, the progress planning and regulating are complicated under resource constraint and the like in a critical chain method, and provides a progress optimization model improved on the basis of a construction period-cost linear model, considers the estimation of a construction period-cost relationship in actual project execution, improves an objective function to a non-linear expression, converts the resource combination criticality and project completion probability into constraint on a construction period, and regards a buffer zone of the critical chain method as adjustable construction period constraint. The progress optimization result of example simulation verifies the effectiveness of the project progress dynamic regulating method, and the project progress dynamic regulating method can better deal with the situations of progress deviation or resource change.
Owner:STATE GRID SHANDONG ELECTRIC POWER

Tender offer and expense control system

The invention discloses a tender offer and expense control system and a preparation method of the system. According to the tender offer and expense control process, the system sequentially comprises an offer manager new construction module, a module for rapidly and accurately forming a tender offer base price, a module for approving the tender offer by a commercial offer accreditation council, a module for reviewing and forming an official tender offer by a main contractor council, a closed contract price forming module, an expense plan control line forming module, a tender dividing and tender base number forming module, a subcontracting and bidding module, a module for carding project items and quantities and changing palaver and a project completion final account module. The orderly circulation and approval from beginning to end of all links of project cost are achieved, and timely, accurate, systematic and dynamic management is achieved, so that an enterprise is fundamentally helped to achieve effective cost control and management, construction cost fineness is improved, management efficiency is promoted, and the enterprise is helped to obtain lasting competitive power in the respect of expense control.
Owner:BEIJING JINDA BIAOZHENG SOFTWARE DEV

Project completion management system based on block chain and implementation method thereof

The invention relates to a project completion management system based on a block chain and an implementation method thereof. The system comprises an open interface module, a plan management module, awork package management module, a document management module, a block chain network module, and a database. The open interface module is a channel for interaction between the system and an external application, and the external application accesses the system through the open interface module. A project owner, a contractor and a construction party digitally sign project plan information through the plan management module, and the digital signatures are stored in the block chain network module. The work package management module is used for dividing and assigning work packages to different construction parties, and updates of work package states are stored in the block chain network module. The document management module is used for saving and tracking design documents of system components,and after the design documents are performed by hash calculation, eigenvalues are sent to the block chain network module. The block chain network module adopts a trusted authorization access federation chain system, and is used for storing of a project plan, work package states and design document change information. The information is stored in the database. The system effectively shares projectcompletion information, records changes, and records a completion status.
Owner:鹰投(上海)海洋科技发展有限公司

Development method, platform and system for accelerated delivery

InactiveCN108876201AReduce communication workloadFast deliveryResourcesPaymentCompletion time
The invention discloses a development method, platform and system for accelerated delivery, and the method comprises the steps: calculating the development workload and total development cost according to a development project demand sent by a client through a client terminal, wherein the types of development projects comprise: front-end software development, rear-end software development, and software linkup development; distributing the software development projects to a plurality of tasks after a fee payment message is received, and issuing the tasks; distributing all tasks to user terminals, and setting a task deadline; receiving the codes of the development tasks sent by all user terminals, deploying the codes to a test environment, and transmitting a page access address and a code downloading address to the client terminal, checking whether the completion time of each task meets the requirements of the task deadline or not: transmitting a project completion message to the clientterminal if the completion time of each task meets the requirements of the task deadline, and transmitting a settlement message to the user terminals, or else transmitting a failure message to the user terminals. The method increases the software development speed, and guarantees the accelerated delivery.
Owner:武汉空心科技有限公司

Scientific and technological innovation product cooperative exploitation management method and device based on Internet

The invention discloses an Internet-based collaborative development management method and device for scientific and technological innovation products. The method includes: when a project requirement document is published, enter the task requirement library, and the acceptor who is allowed to view writes a requirement assessment document; when it is not disclosed, the requirement send a private message to the target undertaker; the target undertaker writes a demand assessment; compares and screens the needs assessment, all the undertakers allowed to view and the reputation and capabilities of the target undertaker, selects the final undertaker and signs the contract; The project management system manages the project schedule, transaction documents, transaction MEMO, BUG control, transaction online communication records, payment nodes and contracts; the case is closed when the project is completed. The implementation of the present invention has the following beneficial effects: it can keep business information confidential, can reasonably guide the project research and development process, can reduce the research and development cost of scientific and technological innovation, shorten the innovation research and development cycle, reduce innovation risk, and increase the success rate of innovation research and development.
Owner:深圳科眸网络科技有限公司

Project management system

The invention discloses a project management system. The system comprises a man-machine operation module, a manpower resource management module, a data collection module, a project plan scheme output module, an artificial expert module, a digital model building module, a virtual actuator, a virtual parameter module, a project plan scheme optimization module, a transfer node module, a plan scheme recommendation module, a project completion condition confirmation module, a holographic projection system, a project finance management module, a project comprehensive management condition assessment module and a central processing unit. According to the system, a perfect total solution is provided for management of project items through a mode of a computer information platform by taking mature informationized and networked technologies as means, detailed management of persons, materials and machines of a project is achieved, comprehensive system management is formed for various businesses, project management level is greatly improved, project management and construction costs are reduced to a relatively great extent, and falsification of a few positions is avoided, so that the project quality is effectively guaranteed.
Owner:LONGYAN UNIV

Workflow control system of project evaluation

The invention provides a workflow control system of project evaluation. The workflow control system comprises a project interim evaluation module and a project post evaluation module. The project interim evaluation module is used for obtaining executing process and state information of a project in a process implementation process and comparing the executing process and state information of the project with a preset evaluation index to obtain and analyze difference information. The project post evaluation module is connected with the project interim evaluation module and used for obtaining an executing result of the project after the project is finished and comparing the executing result with the preset evaluation index to obtain and analyze difference information. By means of the workflow control system, workflow control efficiency can be improved, and requirements of all aspects on information sharing are met.
Owner:CHINA CAMC ENG

Design work management method, platform and system for accelerated delivery

InactiveCN108876202AReduce communication workloadFast deliveryResourcesCompletion timeProject completion
The invention discloses a design work management method, platform and system for accelerated delivery. The method comprises the steps: calculating the total design workload and total design cost according to a design project demand sent by a client through a client terminal, dividing the design project demand into a plurality of tasks, and issuing the tasks, wherein the tasks comprise one main design task and a plurality of common design tasks, and the sum of the completion time of the main design task and the completion time of the common design tasks is less than a task deadline; distributing all tasks to user terminals, and setting the task deadlines, so as to guarantee that the completion time of all tasks are within a specified time of a self-distribution task moment; receiving completed design scripts sent by all terminals, transmitting a delivery result to the client terminal, and checking whether the completion time of each task meets the task deadline requirement or not: transmitting a project completion message to the client terminal if the completion time of each task meets the task deadline requirement, or else transmitting a design failure message to the user terminals. The method increases the software design speed, and guarantees the accelerated delivery.
Owner:武汉空心科技有限公司

On-Demand and configurable earned value measurements reporting

A method and system for uniformly displaying and reporting uniform project completion information, such as uniform earned value measurements (EV), of a large-scale project having a number of individual subprojects. A set of EV Calculation Rules are defined and used as a guide in creating the uniform EVs. The uniform EVs are calculated, then reported. The EV Calculation Rules used to calculate the uniform EVs include an identification of components of the databases required, the locations of these components and the mathematical formulae used to combine these components. On-demand, scheduled and / or event agents implement the rules to create the EV reports.
Owner:IBM CORP

Project management system

The invention discloses a project management system which is in communication connection with a client computer by network transmission protocol through an LAN (local area network). The project management system comprises a database, a planning module, a data collection module, a data analysis module and a management module. The project management system effectively solves problems of non-timely updating of planning data, project disjoint, non-timely tracking of project plans and the like in the existing project management, avoids the disadvantages caused by repetitive work of the existing project management method, specifies the operation of project management, improves the work efficiency of project completion and improves the revenue of enterprises; in addition, as an accessing obtaining module is arranged to prevent others from stealing contents of the project, the enterprise confidential is effectively protected.
Owner:SUZHOU HANQING COMP

Comprehensive evaluation system for enterprise management

The invention discloses a comprehensive evaluation system for enterprise management, and relates to the technical field of enterprise management. The system includes a central processing module, a project management module, a financial management module, an integrated management decision module, a marketing management module, a human resource module, a human-machine operation module and an administration management module. The project management module includes a project preparation module, a project progress module, and a project completion module. The financial management module includes a cost budget module, an actual cost module, and an employee salary module. The integrated management decision module includes a department annual evaluation module, an enterprise annual evaluation module and an enterprise recent year evaluation module. The comprehensive evaluation system is applied to the comprehensive evaluation of enterprise management, not only facilitates the overall managementof the enterprise operation by a manager, but also can make an overall evaluation of the company employees and the company operation, so that the manager can formulate the next development plan and better manage the company.
Owner:HUANGHE JIAOTONG UNIV

Simulation system and method of group software development process

InactiveCN107103419AExplain contest behaviorEffective predictionResourcesComputer moduleProject management
The invention relates to a group software development process simulation system, which includes: a contestant's independent decision-making module, a contestant's ability evaluation module and a group software project quality evaluation module; establishes a contestant's independent decision-making mechanism, develops group software process auxiliary simulation tools, and helps projects Managers carry out project decision-making and management, avoid waste of resources, improve the quality of group software project completion, truly exert the advantages of group software development methods in solving large-scale and complex systems, reduce investment costs, and improve the quality of group software project completion.
Owner:BEIHANG UNIV

Automatic project completion final settlement method for power system

The invention aims to make up for the deficiencies in the prior art and provides an automatic project completion final settlement method for a power system. The method is exclusively used for projectfinal settlement of the power system, reduces workload of financial staffs, improves working efficiency and reduces an error occurrence probability. For achieving the purpose, the automatic project completion final settlement method for the power system comprises the following steps of 1: tentatively estimating a detail table; 2: performing non integrated card establishment; 3: performing expenseallocation; 4: performing pre-fund transfer; 5: performing expense allocation for the second time; and 6: performing formal fund transfer. Through the technical scheme, one-key automatic allocation isrealized through solidification of an allocation rule, so that the workload is reduced, and the working efficiency and quality are improved.
Owner:HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1

Quality control system and method for PCB design and production

The invention discloses a quality control system and method for PCB design and production, and belongs to the field of circuit board design and production. The quality control system comprises a database layer, a service layer, an application layer, a service presentation layer and a service control layer. The quality control method includes the steps that production data of an industrial field are collected through a data recorder in real time; according to production data, a computer is used for performing project quality analysis; according to the results of project quality analysis, the results are fed back to production so as to regulate production. The PCB project completion quality is improved, and the problems that in PCB design and production, multi-point and stepwise quality control cannot be conducted in the whole production process and the PCB project quality cannot be improved are solved. According to the quality control system and method for PCB design and production, the controllability of each process for PCB design and production is enhanced, the quality of a single production activity is improved, and therefore the quality effect of a whole PBC project is improved.
Owner:NANJING FUJITSU NANDA SOFTWARE TECH

Project management system

InactiveCN106447161AConvenient working hour timingImprove completion efficiencyResourcesGraphicsSoftware system
A project management system comprises the components of a project taking-charge management module which is used for supplying a project taking-charge man-machine interaction pattern interface, thereby searching project information and supplying a first project signing-in option for performing a signing-in operation on the project by a project taking-charge person for establishing a correspondence and furthermore making the project taking-charge person distribute project tasks; and a task working hour management module which supplies a second signing-in option through a task working hour management man-machine interaction pattern interface for making a project executing person perform a sign-in operation for establishing a correspondence between the task and the project executing person, furthermore making the project executing person receive or refuse the project task and performing timing of a working hour or overtime working hour on the condition that the project task is received. The project management system is realized through a software system, thereby realizing high speed and high convenience. Furthermore the project executing person can perform selection for receiving or refusing the project task by himself, and convenient working hour timing can be realized. Furthermore project finishing efficiency is improved.
Owner:上海青睐商务咨询有限公司

Power grid project quantity list evaluation application software platform establishing method

Provided is a power grid project quantity list evaluation application software platform establishing method which comprises engineering project information collection, standard library management, bidding project quantity list check and project completion project quantity list check. According to the power grid project quantity list evaluation application software platform establishing method, by establishing a project quantity list benchmark library, automatic matching and combination of key technical-economical index parameters of a project to be evaluated are realized, and a general project quantity list benchmark is generated; by comparing the benchmark and actual project quantity list automatically, the evaluation result is allowed to be visual and clear; and project quantity list items, project characteristics and project quantity difference are labeled to assist check personnel to carry out positioning and analysis quickly, and thus efficiency and quality of project quantity list evaluation work are improved.
Owner:STATE GRID CORP OF CHINA +2

Misoperation-preventive locking method for transformer substation

The invention relates to a misoperation-preventive locking method for a transformer substation. A communication adapter and a wireless base station used for establishing wireless data transmission between a computer key and a monitoring working station and a misoperation-preventive working station is arranged in an interval layer; the computer key obtains real-time position state information of electrical primary equipment by a station control layer via the wireless base station; and meanwhile, the computer key transmits an operating project and project completion condition to the station control layer through the wireless base station. By adoption of the misoperation-preventive locking method, real-time data interaction between the computer key and the misoperation-preventive working station and the monitoring working station can be realized, related information of the equipment in the transformer substation can be mastered in time, and sudden deflection or non-deflection in the operation of the equipment can be known so as to stop operation, so that accidents can be prevented while personal safety of the operation and maintenance staff can be ensured; and in addition, the misoperation-preventive working station has a five-prevention logic determination process, and the logic determination result forms an operation precondition whether the computer key can perform the next step or not, so that a malignant misoperation accident which is against the principle of ''five preventions'' can be avoided.
Owner:DEZHOU POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER +1

Method for providing both automated and on demand project performance measurements

A method and system for displaying and reporting project completion information of a large-scale project having a number of individual subprojects. A rollup agent is employed for acquiring project completion information from a number of subproject databases to provide overall project-wide display and reporting capabilities. The rollup agent collects and organizes the information, and stores it on a rollup database. The rollup agent also interacts with a user to select aspects of any subprojects to report or display. The rollup agent then creates and stores reports of the selected information, or displays the report interactively as a pop-up summary report or a spreadsheet format report to a user. A number of scheduled agents provide scheduled reporting at the subproject level. A number of on demand agents provides the interactive database view, pop-up reporting and spreadsheet reporting for each of the individual subprojects.
Owner:IBM CORP

Engineering project completion acceptance method and system, server and storage medium

The invention relates to the technical field of engineering management, in particular to an engineering project completion acceptance method and system, a server and a storage medium. The method specifically comprises the steps of obtaining completion final settlement data; auditing the completion final settlement data so as to generate a first acceptance result; acquiring a plurality of live-action images shot by the unmanned aerial vehicle; performing three-dimensional live-action modeling on the plurality of live-action images so as to generate a live-action model for describing a buildingbuilt by the engineering project; generating a second acceptance result according to the live-action model; and generating a project completion acceptance report according to the first acceptance result and the second acceptance result. By verifying completion final settlement data and unmanned aerial vehicle modeling, supervisors are helped to quickly complete completion acceptance work of a target building, and the reliability of completion acceptance results is correspondingly improved.
Owner:上海东方投资监理有限公司

Project management system

InactiveCN105184510AImprove automation management levelRealize perspective managementResourcesProject completionEngineering
The invention discloses a project transparent management system, including a project approval module, a concept design module, a design deepening module, a construction drawing design module, a bid inviting module, a project implementation module and a project completion final account module. Based on a computer and a network, the project management system realizes on-line operation management and auditing of a project, thereby saving resources, improving auditing speed and work efficiency, realizing perspective management of all the modules, facilitating monitoring of the rate of progress and quality of the project, and improving the automated management level of the project.
Owner:深圳市加斯特互联网数据咨询有限公司

Method for Arranging and Managing Employment Contracts

A method for arranging and managing employment contracts that is carried out through a software application operated on a plurality of personal computing devices and a back-end system. A contract request is sent from a contractor account to the back-end system in order to seek the employment of a skilled worker associated with a worker account. The contract request is accepted or declined through the worker account; if accepted, a live worker calendar is updated with a project timeline, wherein the days of the project timeline are marked as unavailable dates on the live worker calendar. Once a project is completed, the contractor may provide a review of the skilled worker through the contractor account, while the skilled worker may provide a review of the contractor through the worker account.
Owner:FUESSEL JR THOMAS J
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products