Engineering project completion acceptance method and system, server and storage medium
A technology for completion acceptance and engineering projects, applied in the field of engineering management, can solve the problems of unreliable acceptance results, time-consuming and laborious, and supervisors are prone to missing or wrong inspections, so as to improve the efficiency and reliability of completion acceptance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] A method for completion acceptance of engineering projects, referring to figure 1 , which specifically includes the following steps:
[0063] 101. The server obtains the completion settlement data.
[0064] Specifically, the above-mentioned completed final account information includes at least design documents and construction records.
[0065] Taking civil engineering projects as an example, in practical applications, the above-mentioned design documents can include earthwork excavation and backfill design schemes, foundation pit enclosure design schemes, pile foundation engineering design schemes, main structure design schemes, and roof waterproof and energy-saving engineering designs. Scheme, door and window / curtain wall engineering construction design scheme, electrical installation engineering design scheme, scaffolding special engineering design, etc.
[0066] The above-mentioned construction records include labor cost records, engineering equipment use records,...
Embodiment 2
[0177] A project completion acceptance system, refer to figure 2 , the system specifically includes:
[0178] The first acquisition device 201 is used to acquire completion settlement data.
[0179] The first auditing device 202 is configured to audit the completion settlement data, so as to generate a first acceptance result.
[0180] The unmanned aerial vehicle 203 is used to take multiple real-scene images.
[0181] The second acquisition device 204 is configured to acquire a plurality of real-scene images captured by the UAV 203 .
[0182] The modeling device 205 is configured to perform three-dimensional real-scene modeling on the plurality of real-scene images, so as to generate a real-scene model used to describe the building constructed by the engineering project.
[0183] The second checking device 206 is configured to generate a second acceptance result according to the real scene model.
[0184] The processing device 207 is configured to generate a project comp...
Embodiment 3
[0203] The embodiment of the present application provides a server 3, refer to image 3 As shown, the server 3 includes a memory 301 and a processor 302, and the number of processors 302 in the server 3 can be one or more, image 3 Take a processor 302 as an example; the memory 301 and the processor 302 in the device can be connected through a bus or other methods, image 3 Take connection via bus as an example.
[0204] As a computer-readable storage medium, the memory 301 can be used to store software programs, computer-executable programs and modules, such as the program instructions / modules corresponding to the project completion acceptance method in the embodiment of the present application (for example, the The first collecting device 201, the first auditing device 202, the drone 203, etc.) The processor 302 executes various functional applications and data of the device / terminal / device by running the software programs, instructions and modules stored in the memory 301....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com