Project management system

A technology for management systems and engineering projects, applied in data processing applications, resources, calculations, etc., can solve problems such as inability to control costs in the design stage, low work efficiency, and slow review speed, so as to improve the level of automated management, facilitate monitoring, and eliminate The effect of wasting resources

Inactive Publication Date: 2015-12-23
深圳市加斯特互联网数据咨询有限公司
View PDF1 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

A project construction is divided into the design stage and the construction stage, and the design stage accounts for 80%-85% of the entire project cost. At present, the cost control of the construction stage is mainly achieved by controlling the construction cost, but the design stage cannot be effectively controlled. Cost control. In the existing engineering project management, all sections of the design stage are reviewed in the form of documents, which not only causes a waste of resources, but also slows the review speed, resulting in low work efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0011] Below in conjunction with specific embodiment and accompanying drawing, the present invention is further elaborated and illustrated:

[0012] Please refer to figure 1 , the engineering project management system of the present invention includes a project establishment module, a conceptual design module, a design deepening module, a construction drawing design module, a bidding module, a project implementation module and a completion settlement module. The corresponding operations of the corresponding modules are reviewed and approved, and users who do not have the corresponding permissions can only view them.

[0013] The project approval module executes the land cost audit, demolition and resettlement cost audit and municipal fee audit in the project approval process; at the same time, the project approval module collects and manages the formalities for land approval, demolition and resettlement, and municipal approval. Documents such as management methods of demoliti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a project transparent management system, including a project approval module, a concept design module, a design deepening module, a construction drawing design module, a bid inviting module, a project implementation module and a project completion final account module. Based on a computer and a network, the project management system realizes on-line operation management and auditing of a project, thereby saving resources, improving auditing speed and work efficiency, realizing perspective management of all the modules, facilitating monitoring of the rate of progress and quality of the project, and improving the automated management level of the project.

Description

technical field [0001] The invention relates to a management system, in particular to a transparent management system for engineering projects. Background technique [0002] Project management is a sub-discipline of management. The definition of project management refers to the use of specialized knowledge, skills, tools and methods in project activities to enable the project to achieve or exceed the set requirements and expectations under the limited conditions of limited resources. process. [0003] In the management of engineering construction projects, how to save and reduce costs is very important. A project construction is divided into the design stage and the construction stage, and the design stage accounts for 80%-85% of the entire project cost. At present, the cost control of the construction stage is mainly achieved by controlling the construction cost, but the design stage cannot be effectively controlled. Cost control. In the existing engineering project manag...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
Inventor 杨明幸
Owner 深圳市加斯特互联网数据咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products