Project progress dynamic regulating method considering resource constraint

A resource constraint and project schedule technology, which is applied in the field of dynamic control of project schedule considering resource constraints, can solve the problems of not considering the influence of variable cost of resources, large deviation between schedule plan and actual value, etc.

Inactive Publication Date: 2017-05-24
STATE GRID SHANDONG ELECTRIC POWER
View PDF9 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, most of the existing relationship forecasts do not consider the impact of resource changes on costs
However, in most actual application scenarios, it is obviously unreasonable to express the construction period-cost mathematical relationship linearly in the whole process of project management, which will cause a large deviation between the adjusted schedule and the actual value

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project progress dynamic regulating method considering resource constraint
  • Project progress dynamic regulating method considering resource constraint
  • Project progress dynamic regulating method considering resource constraint

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0077] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0078] like figure 1 As shown, the present invention establishes auxiliary views including the use of network planning diagrams and S-curve progress monitoring diagrams through the acquisition of data, compiles the project progress and focuses on real-time monitoring and dynamic regulation of project progress and resource changes, and finally based on The result of dynamic schedule control forms a project progress status report, which includes progress and cost changes before and after dynamic control. figure 2 Be the concrete flowchart of the present invention, image 3 It is the network plan diagram of the single code project of the calculation example, Figure 4 It is a schematic diagram of the S curve of the present invention, Figure 4 The BCWS curve represents the planned progress curve, the ACWP curve represents the actual progress curve, and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project progress dynamic regulating method considering resource constraint. The project progress dynamic regulating method aims as the problems that the construction period requirements are too ambiguous and harsh, the resource constraint and progress fusion are not tight, the progress planning and regulating are complicated under resource constraint and the like in a critical chain method, and provides a progress optimization model improved on the basis of a construction period-cost linear model, considers the estimation of a construction period-cost relationship in actual project execution, improves an objective function to a non-linear expression, converts the resource combination criticality and project completion probability into constraint on a construction period, and regards a buffer zone of the critical chain method as adjustable construction period constraint. The progress optimization result of example simulation verifies the effectiveness of the project progress dynamic regulating method, and the project progress dynamic regulating method can better deal with the situations of progress deviation or resource change.

Description

technical field [0001] The invention relates to a method for dynamically controlling project progress considering resource constraints. Background technique [0002] Nowadays, due to the continuous development of productivity, production and construction projects involve more and more resources such as manpower, materials, mechanical equipment, and technology. The cross constraints of these resources will have a greater impact on the progress of the project. Therefore, considering resource constraints and dynamically adjusting the project progress in real time has become an urgent technical problem to be solved. With the help of a reasonable method of project schedule dynamic regulation will create higher social value. [0003] The critical chain method (Critical Chain Method, CCM) is a technical method proposed for the dynamic control of the project schedule. It uses the buffer zone to realize the dynamic control of the project schedule. Calculate the critical path by cal...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
Inventor 张学凯张映晖高浩瀚安沫霖胡俊鹏黄延举方敬韬赵勇于青涛杨建
Owner STATE GRID SHANDONG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products