Project progress dynamic regulating method considering resource constraint
A resource constraint and project schedule technology, which is applied in the field of dynamic control of project schedule considering resource constraints, can solve the problems of not considering the influence of variable cost of resources, large deviation between schedule plan and actual value, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0077] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0078] like figure 1 As shown, the present invention establishes auxiliary views including the use of network planning diagrams and S-curve progress monitoring diagrams through the acquisition of data, compiles the project progress and focuses on real-time monitoring and dynamic regulation of project progress and resource changes, and finally based on The result of dynamic schedule control forms a project progress status report, which includes progress and cost changes before and after dynamic control. figure 2 Be the concrete flowchart of the present invention, image 3 It is the network plan diagram of the single code project of the calculation example, Figure 4 It is a schematic diagram of the S curve of the present invention, Figure 4 The BCWS curve represents the planned progress curve, the ACWP curve represents the actual progress curve, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com