Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tender offer and expense control system

A cost control and cost technology, applied in the field of engineering, can solve the problems of single engineering cost work, fragmented bidding and quotation, etc., and achieve the effect of improving cost precision, effective cost control and management, and lasting competitiveness.

Inactive Publication Date: 2013-10-23
BEIJING JINDA BIAOZHENG SOFTWARE DEV
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The technical problem to be solved by the present invention is that the existing engineering cost work is a single split bidding quotation, subcontract bidding, negotiation change, completion settlement work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] According to the bidding quotation and cost control process, the bidding quotation and cost control system provided by the present invention sequentially includes a quotation manager’s new project module, a module for quickly and accurately forming the bidding quotation base price, a business quotation review committee’s examination and approval of the bidding quotation module, and a general contracting committee’s review and formation of formal bidding. Quotation module, closed contract price formation module, cost plan control line formation module, bid section division and bottom bid formation module, subcontract bidding module, project quantity sorting and negotiation change module, project completion settlement module.

[0019] When the quotation manager creates a new project module, he needs to fill in the project number, project name, construction unit, construction scale and project brief information. The cost control quotation personnel make settings to form the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a tender offer and expense control system and a preparation method of the system. According to the tender offer and expense control process, the system sequentially comprises an offer manager new construction module, a module for rapidly and accurately forming a tender offer base price, a module for approving the tender offer by a commercial offer accreditation council, a module for reviewing and forming an official tender offer by a main contractor council, a closed contract price forming module, an expense plan control line forming module, a tender dividing and tender base number forming module, a subcontracting and bidding module, a module for carding project items and quantities and changing palaver and a project completion final account module. The orderly circulation and approval from beginning to end of all links of project cost are achieved, and timely, accurate, systematic and dynamic management is achieved, so that an enterprise is fundamentally helped to achieve effective cost control and management, construction cost fineness is improved, management efficiency is promoted, and the enterprise is helped to obtain lasting competitive power in the respect of expense control.

Description

technical field [0001] The invention relates to the field of engineering, in particular to a bid quotation and cost control system. Background technique [0002] At present, China's iron and steel, cement, coal chemical industry, glass, electrolytic aluminum and other industries have serious overcapacity, and market competition is becoming increasingly fierce. How to comprehensively and effectively control project construction costs and enhance the competitiveness of enterprises, and seek the best in the global market economy competition Better development and pursuit of higher profit margins are matters that design general contractors are very concerned about. [0003] In terms of how to comprehensively and effectively control and reduce project construction costs and improve corporate profit margins, project cost plays a vital role. The project cost work needs to change from the existing single split bidding quotation, subcontract bidding, negotiation change, completion s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/00
Inventor 廖选贤陈丰
Owner BEIJING JINDA BIAOZHENG SOFTWARE DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products