Automatic project completion final settlement method for power system

A system engineering and automatic technology, applied in the field of completion settlement, which can solve problems such as limited functions

Active Publication Date: 2018-01-12
HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1
View PDF6 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the earlier application date of the patent, the functions are limited, and it has been difficult to meet the needs of the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Automatic project completion final settlement method for power system
  • Automatic project completion final settlement method for power system
  • Automatic project completion final settlement method for power system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] The method for automatic completion and settlement of power system engineering of the present invention comprises the following steps:

[0063] Step 1: Estimated detailed list, by entering the project definition, query the contract amount of the entire project and the confirmed cost of the order according to the project dimension, and manually enter the estimated estimated amount and estimated items; through the single project dimension, query the form The contract amount of the physical project and the confirmed cost of the order; manually fill in the proposed estimated amount and estimated items;

[0064] Step 2: Non-integrated card building: set the asset flag, and create a tool card, building card, and long-term prepaid asset card;

[0065] Step 3: Cost allocation: select a single project, and the system will carry out the cost allocation of the single project;

[0066] Step 4: Pre-capital transfer: pre-capital transfer includes project capital transfer and communi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention aims to make up for the deficiencies in the prior art and provides an automatic project completion final settlement method for a power system. The method is exclusively used for projectfinal settlement of the power system, reduces workload of financial staffs, improves working efficiency and reduces an error occurrence probability. For achieving the purpose, the automatic project completion final settlement method for the power system comprises the following steps of 1: tentatively estimating a detail table; 2: performing non integrated card establishment; 3: performing expenseallocation; 4: performing pre-fund transfer; 5: performing expense allocation for the second time; and 6: performing formal fund transfer. Through the technical scheme, one-key automatic allocation isrealized through solidification of an allocation rule, so that the workload is reduced, and the working efficiency and quality are improved.

Description

technical field [0001] The invention relates to a completion settlement method, in particular to an automatic completion settlement method for power system engineering. Background technique [0002] After the unit project is completed and accepted, the final account of the project is the summary economic document prepared by the construction unit that comprehensively reflects the actual use of various funds, construction results and all construction costs in the whole process of the project from preparation to completion and commissioning. Completion settlement is a comprehensive reflection of the economic benefits of construction projects. It can not only correctly reflect the actual cost and investment results of the project, but also evaluate the effectiveness of investment control through comparison and analysis with the estimated budget and budget, and provide important technical and economic basic information for project construction. Looking at the final accounts of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q40/00G06Q50/06G06Q50/08
CPCY04S10/50
Inventor 沈华强李皓林海瑞赵学海钱芳罗哲珺周兵
Owner HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products