Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

100 results about "Numbering" patented technology

In computability theory a numbering is the assignment of natural numbers to a set of objects such as functions, rational numbers, graphs, or words in some language. A numbering can be used to transfer the idea of computability and related concepts, which are originally defined on the natural numbers using computable functions, to these different types of objects.

Substitution Boxes

InactiveUS20090055458A1Increase sequential execution latency timeReduce performanceCoding/ciphering apparatusSecuring communicationBoolean functionMultiple input
A multiple-input multiple-output s-box receives a contiguously numbered input bits (101, 102, 103, 104, 105) I1, I2 to Ia, where a is at least 4, and outputs b contiguously numbered output bits (131, 132, 133, 134, 135) O1, O2, to Ob. The s-box comprises c primitive s-boxes (121, 122, 123) sb1 sb2 to sbc. Each primitive s-box (121, 122, 123) has a multiple-input single-output Boolean function ƒ1, ƒ2, to ƒo defining the relationship between the multiple inputs and the single output. Each primitive s-box (121, 122, 123) receives a set of input bits s1, s2, to sc, respectively, each such set is chosen from the a input bits (101, 102, 103, 104, 105) to the s-box and containing sl1, sl2, to slc bits respectively. Each of the numbers sl1, sl2, to slc, is in the range of 3 to (a−1), and the sum of the numbers sl1, sl2, to slc is larger than a. The b output bits of the s-box (131, 132, 133, 134, 135) are the outputs of the c Boolean functions.
Owner:ONEIL SEAN

Method for processing vector graph by utilizing key proportional scale and similar tile technology

The invention discloses a method for processing a vector graph by utilizing a key proportional scale and a similar tile technology. The method comprises the following steps of performing grading on elements in a topographic map and naming levels; performing rectangular block segmentation on each level, and performing numbering; calculating out the key proportional scale of each level, calculatingout a display scale of the level, and performing storage; determining tiles and performing numbering; and performing storage on each piece of tile data, comprising a tile number, a size, a position and graphic data, as a whole body. According to the storage method, the response speed can be remarkably increased during opening as well as panning and zooming of the vector graph in quality graph making software.
Owner:JIANGXI UNIV OF SCI & TECH

Method for drawing exploratory point planar graph on basis of Excel

ActiveCN102722616AOmit generationOmit the calling linkSpecial data processing applicationsComputer Aided DesignData capacity
The invention relates to a method for drawing an exploratory point planar graph on the basis of the Excel. The method comprises the following steps of: 1, setting an Excel template file, i.e. setting a corresponding worksheet, wherein the worksheet at least comprises a header, a column number acquisition region, a CAD (Computer Aided Design) batch command generating region for expressing graph blocks and characters of different exploration holes, a hole coordinate input regions of the exploration holes and an element input region; 2, setting a CAD template file, including steps of setting corresponding drawing layers and defining the graph blocks and graph block names as per the elements, and programming a small program of 'numbering and coordinate extracting.dvb'; and 3, by loading the small program of 'numbering and coordinate extracting. dvb', generating a corresponding Excel table, acquiring the coordinates of exploratory points so as to obtain the worksheet, starting a CAD batch command and drawing the exploratory point planar graph. The method has the advantages that the method is simple, is easy to operate, is flexible and changeful, has strong adaptability, is convenient to carry out batch regulation and modification and has large data capacity; the time of generating the exploratory point layout plan in the investigation project is greatly shortened; and the working efficiency is improved.
Owner:CHEM IND GEOTECHN ENG

Graph data storage method and device, graph data processing method and device and computer storage medium

The embodiment of the invention discloses a graph data storage method and device, a graph data processing method and device and a computer storage medium, and belongs to the technical field of graph databases. The method comprises the steps of acquiring target vertex sequence numbers of target vertexes stored in a target partition, storing a plurality of vertexes in the target partition, wherein the vertexes correspond to the vertex sequence numbers respectively; obtaining a partition number of a partition where the other vertex of each edge in one or more edges associated with the target vertex is located, a vertex sequence number of the other vertex and the direction of each edge, and obtaining target edge data corresponding to the target vertex sequence number; and writing the target edge data into a side data file in the target partition, wherein the side data file is used for storing side data corresponding to each vertex sequence number. According to the embodiment of the invention, the partition numbers of the partitions where the vertexes are located and the vertex sequence numbers of the vertexes in the partitions are used as identifiers, so that the memory required for graph calculation is reduced, and the calculation performance of the calculation nodes is improved.
Owner:HANGZHOU HIKVISION DIGITAL TECH

Position query method and device, computer equipment and storage medium

PendingCN111026978AImprove performanceEffective support for arbitrary spatial range queriesDigital data information retrievalNatural language data processingData setEngineering
The embodiment of the invention provides a position query method and device, computer equipment and a storage medium. The method is applied to the field of data query in data processing. The method comprises the following steps: encoding all position points in a preset data set according to a geohash algorithm to obtain character strings corresponding to the position points; sorting and numberingall the position points in the preset data set and the character strings corresponding to the position points according to the lexicographical order to obtain a target data set, and constructing an extended dictionary tree according to the target data set; converting the extended dictionary tree into a double-array dictionary tree; if a query instruction is received, querying the double-array dictionary tree according to the query instruction to obtain position points in a query domain; and verifying the position point in the query domain to obtain a target position point. By implementing theembodiment of the invention, the effects of effectively supporting any spatial range query, improving the index structure performance, improving the retrieval efficiency and being higher in coding adaptability can be achieved.
Owner:PING AN TECH (SHENZHEN) CO LTD

Method for obtaining frame structure information based on Revit secondary development in combination with Ansys command stream

The invention discloses a method for acquiring frame structure information based on Revit secondary development in combination with Ansys command stream. The method comprises the following steps: developing an information export operation interface; creating a structural column and a frame beam of a frame structure model; obtaining geometric information of the structural columns and the frame beamcomponents in order; creating a structural plate; obtaining geometric information of the structural slab components in order; and copying the command stream of the geometric information to Ansys software, and automatically generating a model. The method is used for solving the problem that body cannot be generated or the generated body is in a distorted state due to the extracted geometric information of the Revit frame structure model cannot meet the high requirement of Ansys software on the numbering sequence, the framework model established by Revit software is imported into Ansys software, a model is provided for subsequent analysis operation, the operation of repeatedly inputting key point numbers and coordinates in the Ansys software is avoided, and the application of the building information model in the aspect of structural design is enhanced.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY

Sparse subspace clustering method based on selective coordinate descent optimization

The invention discloses a sparse subspace clustering method based on selective coordinate descent optimization. The method comprises the following steps: 1, establishing a sparse subspace clustering model, substituting the sparse subspace clustering model into the Lasso formula, converting the sparse subspace clustering model into a quadratic programming problem, and solving a similarity matrix; 2, starting to solve the similarity matrix, traversing all features in the first time iteration by using a coordinate descent method, and using a calculated solution as an initial value; 3, starting from the second time iteration, traversing each feature, if the current solution item is non-zero, updating the feature of the coordinate position by using the coordinate descent method; otherwise, skipping the update of the feature of the coordinate position; repeating the process until the convergence of an objective function; and 4, after the similarity matrix is obtained, performing a spectral clustering process to obtain a classification serial number. According to the sparse subspace clustering method disclosed by the invention, whether the current solution item is zero or non-zero is quickly judged by using an infinite norm rule, thereby avoiding an unnecessary calculation process of a zero item result and shortening the time of optimization solution; and the effect on large-scale sparse problems is extremely obvious.
Owner:NANJING UNIV OF INFORMATION SCI & TECH

Method and system for implementing partition load balancing in Spark environment

The invention discloses a method for implementing partition load balancing in a Spark environment. The method comprises the steps of receiving a Spark application sent by a user, and analyzing the Spark application program to obtain an analysis result, wherein the RDD graph represents the relationship among the plurality of elastic distributed data sets RDDs, and the directed acyclic graph DAG isused in the scheduling stage; sequentially determining a dependency relationship between every two adjacent scheduling stages according to the DAG graph; numbering the wide dependency relationships inall the obtained dependency relationships; setting counter cnt = 1, and judging whether the cnt is greater than the total number of the wide dependency relationships or not; and if not, sampling datain all partitions in the last RDD in the Map end corresponding to the cnt-th wide dependency relationship to obtain hash tables which represent data key distribution and correspond to each partition,and merging the hash tables corresponding to all the obtained partitions. According to the method, the problem of data inclination in big data calculation can be solved, meanwhile, allocation of calculation resources is optimized, and the program running time is shortened.
Owner:HUNAN UNIV

Digital process management method and system and storage medium

The invention discloses a digital process management method and system and a storage medium, and the method comprises the following steps: S1, setting a two-dimensional code on each workpiece, and enabling the two-dimensional codes to be in one-to-one pairing with the workpieces through a preset numbering rule so as to number the workpieces; S2, after one production process of each workpieces is completed, scanning the two-dimensional code corresponding to the workpiece, and recording production process information of each workpiece in the system by scanning the two-dimensional code; S3, allowing workshop management personnel to confirm the flow and the real-time process of the workpieces according to the production process information of the workpieces recorded in the system; and S4, after all the procedures are completed, allowing the system to obtain the completion rate of the production task, the percent of pass of the product and the rework rate information according to the two-dimensional code information scanned in all the procedures, and uploading the information to workshop management personnel. According to the method provided by the embodiment of the invention, the intelligent level of the workshop can be improved, manual operation is reduced, and manpower and material resources are saved.
Owner:江苏凯达重工股份有限公司

AI-based objectified attribute text automatic classification method and system

The invention belongs to the technical field of data analysis and data mining, and particularly relates to an AI-based objectified attribute text automatic classification method and system, and the method comprises the following core steps: building a character coding library, carrying out character decomposition on all text data which are stored in a library in history, numbering single characters uniquely in the library, and integers being used as self-increasing numbers according to numbering rules; preprocessing standard attribute data, extracting stored standard data as to-be-trained data, and limiting the length of a character string to be 60 Chinese characters, such as drug general names, drug specifications, drug production enterprises, approved numbers and the like, and clearly expressing fields of data attribute characteristics. Through the invention, the subject attribute category described by a section of data can be quickly judged, and then whether the attribute category is consistent with the subject design or not is judged; in addition, attribute classification judgment can be carried out on a plurality of adjacent data, and the position of the main body description information can be positioned in the webpage.
Owner:北京星汉博纳医药科技有限公司

Question and answer method, system and device based on natural language processing and storage medium

The invention provides a question and answer method, system and device based on natural language processing and a storage medium. The method comprises the steps of obtaining a question and answer instruction input after a user starts an intelligent service; carrying out semantic identification on the question and answer instruction, and obtaining the question features corresponding to the question and answer instruction according to the identification result, wherein the question features comprise the intention category keywords and the execution category keywords; analyzing each execution category keyword, performing matching connection on the intention category keyword and all the execution category keywords by adopting the AND, OR and NOT expressions, and calling the similar statements corresponding to the question and answer instruction from a preset database according to a matching result; and obtaining the preset numbers of the similar statements, and obtaining the reply information corresponding to the similar statements according to the preset numbers. The question and answer method based on natural language processing can solve the problems of low reply efficiency, high labor cost and high system maintenance professionality of manual customer services, and has the advantages of high identification accuracy and accurate reply.
Owner:江西中业智能科技有限公司

Mining method, system and database terminal of similar word dictionary rule of database

The invention is applicable to the field of similar word dictionary rule mining, and provides a mining method, a system and a database terminal of a similar word dictionary rule of a database. The mining method of the similar word dictionary rule comprises the following steps of: scanning and analyzing a database r, eliminating single-value columns and columns in which all values are unique, and the marking the rest candidate column sets as R; counting up the support degree of each item of each column in the candidate column sets R, and numbering the item with the support degree more than the given maximum support degree with an integer; sequentially numbering each row of transactions in the database r, recording the row transaction number included in each item in a list, and then caching; using a method of DCfd to mine the similar word dictionary rule of the database r; and outputting the similar word dictionary rule. According to the invention, the similar word dictionary rule mining method of DCfd is used in the database r, a reverse increment search strategy is used, a search tree is trimmed by a trimming method, and simultaneously, the found rule is cached, so that the calculation amount of the whole mining method can be reduced, and the similar word dictionary rule in the database can be automatically and efficiently found.
Owner:SHENZHEN AUDAQUE DATA TECH

Production scheduling management method based on logic priority principle by utilizing computer

The invention discloses a production scheduling management method based on a logic priority principle by utilizing a computer, and the method comprises the following steps: issuing and inputting all work orders including finished products and semi-finished products into a computer system, numbering the work orders according to a priority sequence during input, giving a priority sequence number toeach work order, and taking the minimum priority sequence number as the priority principle; scheduling production from the entered work order, and scheduling production from small to large according to the size of the priority number, wherein only the orders in the issued and started states are scheduled; adopting the overall logic priority principle that the priority sequence number is minimum, and then judging the priority sequence of the single work order according to the determined rule judgment priority sequence so that scheduling can be conducted. According to the method, production scheduling is carried out in a priority sequence number mode by taking the minimum number as a priority principle, a detailed load list can be given for each resource, and which resources are capacity bottlenecks can be judged; therefore, the capacity of bottleneck resources can be adjusted or which procedures are temporarily outsourced can be set, and production scheduling is less prone to walking.
Owner:常州市龙星工业自动化系统有限公司

Parallel disassembly line setting method without merging priority relation matrixes

The invention discloses a disassembling line setting method without combining a priority relation matrix, and relates to the technical field of disassembling line balance. The method comprises the following steps that firstly, all parts of an object to be disassembled are numbered, the preferential disassembly relation, the hazard attribute and the demand attribute of the parts are recorded, then a mixed integer linear programming model is established, the model comprises an objective function and constraint conditions, and finally the model is solved. According to the method, a processing mode different from a traditional parallel disassembly line processing mode is established, disassembly tasks are distributed according to the priority relation matrix of the disassembly products on the parallel disassembly line, the parallel disassembly line balance problem is solved, the mixed integer linear programming model of the non-merging parallel disassembly line priority relation matrix is established, and the parallel disassembly line processing mode is optimized. And respectively solving single-target optimal values of four targets, namely the number of the working stations started by the parallel disassembly line, the total idle time, the demand attribute and the hazard attribute.
Owner:SOUTHWEST JIAOTONG UNIV

Programming language online education learning method

InactiveCN112102666AObserving the fruits of laborLearn to think independentlyElectrical appliancesTeaching apparatusInformation transmissionUser input
The invention discloses a programming language online education learning method. The method comprises the steps that S1, a course number is obtained; S2, corresponding course contents are opened, andprogramming code contents stored by a course code user for the last time are opened; S3, a user operation instruction is obtained, displaying a teaching content unit of the previous step or the next step is correspondingly executed, course learning is completed, information is transmitted to a course list module of the previous stage, and course progress is notified and modified; S4, an editing area performs format standardization according to the code format of the programming language input by the user, whether the format of the programming language is correct or not is judged, if an error exists, the user is informed, and modifying is performed; and S5, after the programming language standardization is detected as qualified, a programming program is going to be executed in the background, and an execution result is displayed through a lower computer execution unit. According to the method, learners can understand the significance of programming and intuitively observe the labor result of programming, so that programming is no longer a boring code, but the code can be studied and applied creatively and learned for practice.
Owner:深圳市易科诺科技发展有限公司

Hoisting sequence setting method and system

The invention discloses a hoisting sequence setting method and system, and is applied to the field of prefabricated buildings. The method comprises the following steps of: receiving preset hoisting sequences; generating numbers, in one-to-one correspondence with components, sorted according to the hoisting sequences, wherein reserved compilation spaces for adding sub-numbers are reserved between numbers of adjacent components; and generating a hoisting sequence file, wherein the hosting sequence file stores the hoisting sequences sorted according to the numbers and is separated from an IFC file. According to the method, the preset hoisting sequences are received, the numbers, in one-to-one correspondence with the components, sorted according to the hoisting sequences are generated, and thereserved compilation spaces for adding sub-numbers are reserved between the numbers of the adjacent components to ensure that the numbers of other components are not influenced after hoisting sequences of newly added components are added to the original hoisting sequence file, so that modification of the hoisting sequence file is decreased; and meanwhile, the hoisting sequence file is a separatefile and does not influence the IFC, so that the hoisting work efficiency is improved.
Owner:CHINA MINGSHENG DRAWIN TECH INVESTMENT CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products