Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

4884results about "Moulds" patented technology

Rapid demolding device and method for small prefabricated part

The invention discloses a rapid demolding device and method for a small prefabricated part, and relates to the technical field of prefabricated part production. The mold bearing table is mounted on the substrate of the demolding rack and is integrated with a multi-point temperature sensor and an acoustic vibration signal collector; the ejection demolding assembly is installed on the stand columns of the demolding rack in a liftable mode and comprises an ejection plate assembly, and an ejection force sensor and a high-frequency vibrator are arranged on the ejection plate assembly; the visual identification module is mounted on the demolding rack; and the controller is electrically connected with the multi-point temperature sensor, the sound vibration signal collector, the ejection force sensor, the high-frequency vibrator, the visual recognition module and a driving mechanism of the ejection demolding assembly. Multi-source sensing information is fused, the component condensation state and the demolding time are accurately judged, the ejection force and vibration in the demolding process are adaptively controlled, accurate and flexible control over the demolding time and process is achieved, and the demolding success rate and the component yield are remarkably increased.
Owner:GANSU XINLU TRAFFIC ENG CO

Concrete box girder prefabricated segmental girder formwork system and construction method thereof

The invention relates to the technical field of bridge engineering, and discloses a concrete box girder prefabricated segmental girder formwork system and a construction method thereof.The concrete box girder prefabricated segmental girder formwork system comprises a connecting beam frame and fences, the fences are fixedly connected to the upper surface of the connecting beam frame, and an end formwork is detachably installed on the front surface of the connecting beam frame; a side formwork is fixedly connected to the lower portion of the front surface of the connecting beam frame, a side formwork is detachably installed on the upper surface of the side formwork, and an auxiliary formwork is detachably installed on the lower portion of the side formwork. Through the arrangement of the end formworks, the side formworks, the auxiliary formworks, the movable bottom formworks, the walking sliding shoes, the jacks, the reinforcement cages and the side formwork frames, a short line matching method is adopted for prefabrication, a formwork system is matched, reasonable hydraulic jack arrangement is adopted, precise formwork adjustment, supporting and demolding are achieved, the segmental beam prefabrication precision is improved, the bridge splicing quality is guaranteed, the construction process is optimized, and the construction efficiency is improved. All procedures are closely connected, construction time is shortened, and construction efficiency is improved.
Owner:CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +2

Method of forming a composite wall structure

A precast composite wall structure and method for forming the wall structure are disclosed. The method includes providing a casting bed defining a plurality of shapes corresponding to a three-dimensional outer surface of a wall structure, placing a first layer of uncured concrete to conform to the shapes defined by the lower surface, positioning a forming member in overlying relation above the frame, the forming member defining a plurality of rectangular-shaped channels therebetween, positioning a stud frame within the casting bed along the forming member, placing a second layer of uncured concrete within the casting bed to conform to the rectangular-shaped channels between the rectangular protrusions, and allowing the concrete to cure.
Owner:ENVIROCAST LLC

Construction method of synchronous pouring type precast concrete fragmented bent cap and component mold and component manufacturing method of synchronous pouring type precast concrete fragmented bent cap

The invention discloses a construction method of a synchronous pouring type precast concrete split cover beam, a component mold of the synchronous pouring type precast concrete split cover beam and a component manufacturing method.The combined component mold is composed of a bottom mold, a side mold, a first side mold and a second side mold, and a baffle is arranged in a pouring area of the component mold; a plurality of components can be synchronously manufactured at a time through the mold, then the multiple components are spliced on site and cast in situ to form the component-piece-type prefabricated concrete cover beam, manufacturing of the large-cantilever prefabricated cover beam under the special working conditions that the construction site is narrow, the distance between supporting stand columns is small, cantilevers on the two sides are large, and the stress requirement is high can be achieved, and due to the fact that the prefabricated concrete cover beam is heavy, manufacturing cost is low. The prefabricated concrete cover beam is simple in structure and high in transportation difficulty, the transportation and hoisting difficulty is reduced by manufacturing the multiple components in a split mode, the manufacturing difficulty of the prefabricated concrete cover beam is reduced, meanwhile, manufacturing of the prefabricated concrete cover beam with the larger size and weight can be achieved, and the requirements for the prefabricated concrete cover beam in different projects are effectively met.
Owner:SHANGHAI CONSTR BUILDING MATERIALS TECH GRP CO LTD

Forming equipment for ceramic guide rail production and forming method thereof

The invention discloses forming equipment for ceramic guide rail production and a forming method thereof, and relates to the technical field of ceramic guide rail forming, the forming equipment comprises a conveyor, a forming processing box and a raw material box, and the top of the conveyor is provided with the forming processing box. The ultrasonic disperser arranged in the raw material box is combined with the constant-temperature heating sleeve and the viscosity sensor of the conveying pipe, uniform flowing and accurate metering injection of slurry are guaranteed, in the forming stage, the vacuum pump actively pumps out bubbles in a cavity through the micropore array, pores are further eliminated in cooperation with the high-frequency micro-vibration device, the compactness and surface smoothness of the guide rail are greatly improved, and the production efficiency is improved. The cooling runner realizes gradient cooling and curing through closed-loop control of a temperature sensor and a temperature regulator, ceramic cracking deformation is effectively inhibited, the rotary mold assembly supports multi-angle adjustment, nondestructive demolding of a complex structure is facilitated, the production period is shortened, the process stability, energy consumption control and equipment adaptation flexibility are further enhanced, and the production efficiency is improved. And the targets of high precision, low defect and batch production are achieved.
Owner:莎特卡科技(江苏)有限公司 +1

Targeted Ceramic Casting Core Inhomogeneity

A method for molding a ceramic core includes introducing a slurry to a mold and vibrating the mold. The slurry has: silica-containing particles; polymer fiber; and matrix precursor. The mold has an outer tool and a liner held within the outer tool. The vibrating comprises operating a plurality of vibration transducers distributed along the mold.
Owner:RTX CORP

Wind power concrete tower drum mould

The invention relates to the technical field of wind power equipment manufacturing, in particular to a wind power concrete tower drum mold which comprises a bottom mold body, an outer mold body and an inner mold body. The outer mold comprises a plurality of first modules and a plurality of first connecting flexible plates, the first modules can be connected to form a cavity, one first connecting flexible plate is connected between every two adjacent first modules, the inner mold comprises a plurality of second modules and a plurality of second connecting flexible plates, and the inner mold and the outer mold form a pouring cavity. The arrangement mode of the inner mold is consistent with that of the outer mold; when the diameter of the outer mold needs to be decreased, the two adjacent first modules are folded towards the outer side of the cavity, when the diameter of the outer mold needs to be increased, the two adjacent first modules are unfolded towards the inner side of the cavity, and the area of the top plane of the cavity before the diameter is changed is equal to the area of the bottom plane of the cavity after the diameter is changed; the diameter changing mode of the inner mold is the same as that of the outer mold; the die has the effect of improving the defect that the diameter of the die is inconvenient to adjust.
Owner:NORTHWEST ELECTRIC POWER CONSTR NO 1 ENG CO

Composite material blade forming mold, device and method

PendingCN120056253AMouldsMould fastening means
The invention provides a composite material blade forming mold, device and method, the composite material blade forming mold comprises a blade basin side mold, a blade back side mold and a pin shaft, and the blade basin side mold and the blade back side mold are connected through the pin shaft and are switched between a mold opening state and a mold closing state through rotation around the axis of the pin shaft. The blade basin side mold is provided with a first cavity surface used for forming at least part of a blade basin surface of the composite material blade, the blade back side mold is provided with a second cavity surface used for forming at least part of a blade back surface of the composite material blade, and in a mold closing state, a cavity used for forming the composite material blade is defined by the first cavity surface and the second cavity surface; in the process of switching from the mold opening state to the mold closing state, the composite material blade is gradually compacted and formed in the direction from the front edge to the tail edge, the effect of stroking a composite material laying layer from front to back is achieved, the risk that laying layer wrinkles appear on the front edge and the nearby position of the blade is reduced, and the wrinkling position is concentrated on the tail edge position with the low profile requirement.
Owner:AECC COMML AIRCRAFT ENGINE CO LTD

Automated side forming device for box girders

Automated side forming device for box girders for high-speed railways with: a side forming mechanism (2) wherein a side forming flange plate part and a side forming web part are connected to each other; a support traverse (4) which is arranged symmetrically on two outer sides of the base of the side forming mechanism (2); a support mechanism of the side form (3), wherein this is provided in several groups at longitudinal intervals on both outer sides of the side form mechanism (2), wherein each group of the support mechanism of the side form (3) comprises at least two length-adjustable side form spacers, one end of which supports a corresponding section of the side form flange section and the section of the side form web section, the other end of which is connected to the support traverse (4); a lifting mechanism (5) which is spaced longitudinally below the support traverse (4) and whose upper end is connected to the support traverse (4) in a way that allows it to be raised.
Owner:CHINA RAILWAY SHANGHAI ENGINEERING GROUP NO 5 ENGINEERING CO LTD

Production device and method of concrete member

The invention discloses a concrete member production device and method.The concrete member production device comprises a supporting assembly provided with a support and a supporting table, the supporting table is slidably connected with the support, a member mold is of a cubic structure and located on the supporting table, the member mold is formed by splicing a plurality of flexible mold units, and locking equipment is located on the supporting table; the locking device is used for fixing and limiting the position of the component mold, the control system is installed on the support, the bottom of the component mold is provided with an adjusting device, the adjusting device comprises a supporting air bag and a balance adjuster, and the inclination of the component mold is adjusted through the balance adjuster. According to the device, the component mold formed by splicing the multiple flexible mold units can adapt to different component shapes, so that the flexibility of the device is improved, meanwhile, under the mutual cooperation of the locking equipment and the adjusting device, the component mold can be stably kept at the needed fixing position, uniform pouring of concrete is effectively ensured, and the construction efficiency is improved. Therefore, the stability and the quality of the concrete member are improved.
Owner:DINGZHOU ZHUYE PREFABRICATED BUILDING TECH CO LTD

Deep V-shaped ceramic matrix composite component forming device and forming method

The invention provides a deep V-shaped ceramic matrix composite component forming device and method. The forming device comprises a bottom die, an outer die and an inner die. The outer die is connected to the bottom die; the inner mold is connected to the bottom mold, and the bottom mold, the outer mold and the inner mold are encircled to form a cavity for forming the deep V-shaped ceramic matrix composite component; wherein the inner die comprises a V-shaped main body die and a plurality of small-section dies connected to the V-shaped main body die, the plurality of small-section dies are arranged in the narrow opening position and are sequentially connected in the length direction, and the plurality of small-section dies are provided with die drawing angles in the length direction. The deep V-shaped ceramic matrix composite component can be formed and prepared, and demolding is convenient.
Owner:AVIC BEIJING AERONAUTICAL MFG TECH RES INST

Forming method of cone-shaped prefabricated body with unequal wall thickness

The invention relates to a forming method of an unequal-wall-thickness conical preform, belongs to the technical field of preparation of fiber reinforced ceramic matrix composite components, and solves the problems that a three-dimensional woven unequal-wall-thickness conical preform is long in forming period and high in cost; the transition section of the prefabricated body is unequal in wall thickness and difficult to shape; the method comprises the steps of graphite mold punching, high-temperature treatment, inner mold assembly, first-time carbon fiber cloth laying, second-time silicon carbide cloth laying, third-time silicon carbide cloth laying, fourth-time silicon carbide cloth laying and fifth-time carbon fiber cloth laying, and further comprises the steps of graphite mold punching, high-temperature treatment, inner mold assembly, first-time carbon fiber cloth laying, second-time silicon carbide cloth laying, third-time silicon carbide cloth laying, fourth-time silicon carbide cloth laying and fifth-time carbon fiber cloth laying. And sewing the prefabricated body and the inner mold, and closing the mold. The forming method is used for preparing the cone-shaped preforms with the unequal wall thicknesses.
Owner:XIAN XINGUI CERAMIC COMPOSITE MATERIAL CO LTD

Building panel

A building panel for modular construction. The building panel utilises less framework for reduced complexity, materials and weight. The panel utilises features of the formwork to allow the panel to be moved easily. The panel further utilises new formwork moulds that are easier to use and create effective patterns for keying with like panels.
Owner:SPEEDFLOOR LTD

Equipment of XinJexi guardrail production line

The invention discloses equipment for a XinJexi guardrail production line, and relates to the technical field of XinJexi guardrail production, the equipment comprises a mold trolley main body, the side wall of the mold trolley main body is provided with two first side plates which are oppositely arranged and two second side plates which are oppositely arranged; the first edge side plate and the second edge side plate are respectively connected with the edge of the mold vehicle main body through rotating shafts; the one-machine double-mold automatic production line for the New Jersey guardrails has the effect of one-machine double-mold, the production efficiency of the New Jersey guardrails can be improved, the locked locking structures can be opened, workers do not need to open the locking structures, the automation degree is high, the production efficiency can be improved, and the production cost is reduced. During mold opening, the first edge side plate and the second edge side plate do not need to be manually opened, the unfolded first edge side plate and the unfolded second edge side plate enable a guardrail workpiece to be separated from a guardrail mold cavity more easily, the guardrail workpiece can be conveniently hoisted in the later period, the production rhythm efficiency is high, and the automation degree is high.
Owner:DEZHOU HAITIAN ELECTROMECHANICAL TECH

Lightweight aggregate-based steam-curing-free high-performance pipe culvert and preparation method thereof

The invention discloses a lightweight aggregate-based steam-curing-free high-performance pipe culvert and a preparation method thereof, and belongs to the technical field of concrete pipe culverts. The lightweight aggregate-based steam-curing-free high-performance pipe culvert provided by the invention is prepared from the following raw materials by unit volume mass: 300-450 kg / m < 3 > of a sulfur-aluminum-iron series low-carbon cementing material; 800-920 kg / m < 3 > of solid waste-based lightweight aggregate; 300-550 kg / m < 3 > of solid waste-based artificial sand; 0-100 kg / m < 3 > of a mineral admixture; 0-50 kg / m < 3 > of an auxiliary material; 110-160 kg / m < 3 > of water; the concrete further comprises a water reducing agent and a retarder. The lightweight aggregate-based steam-curing-free high-performance pipe culvert can be demolded within 4 hours during molding, the demolding time is short, steam curing is not needed, the production cost is low, and the production efficiency is high; the obtained product is high in strength and good in impermeability and durability, and solid waste can be utilized in a high proportion.
Owner:SHANDONG UNIV +1

Die for concrete house construction

The utility model relates to the technical field of cement house construction, in particular to a mould for concrete house construction, which comprises an inner mould plate and an outer mould plate which are respectively driven by an inner mould closing mechanism and an outer mould closing mechanism to close and demould, the inner mould plate and the outer mould plate are fastened by a mould closing locking mechanism, and the adjacent outer mould plates are locked by an aligning locking mechanism. An adjusting assembly is arranged at the bottom of the cement room mold; the construction quality is improved, the mold closing and demolding time is greatly shortened, meanwhile, the mold closing and demolding precision of the outer mold plate and the inner mold plate is improved, the situation that the outer mold plate deflects in the mold closing and demolding process is avoided, and the mold closing and demolding efficiency is improved. The cement house formwork is suitable for the technical field of cement house construction, meanwhile, an adjusting assembly is arranged at the bottom of the formwork, when the cement house formwork is used, an adjusting main body is rotated, the adjusting main body is rotated to drive an adjusting sleeve to move, an extrusion plate above the adjusting sleeve moves, and the formworks can be tightly connected at the moment; and the subsequent pouring quality is ensured.
Owner:HEBEI FEIZHUMING ALUMINUM MOULD TECHNOLOGY CO LTD

Large-diameter duct piece independent kiln flow conveying prefabricating method and large-diameter duct piece independent kiln flow conveying prefabricating system

The invention relates to the technical field of tunnel engineering prefabricated part production, in particular to a large-diameter duct piece independent kiln assembly line conveying prefabricating method and system. S2, a reinforcement cage and an embedded part are installed; s3, concrete is precisely poured and vibrated; s4, pre-curing and surface treatment; s5, carrying out roller way type flow conveying; s6, hydration heat-driven dynamic maintenance is carried out; and S7, demolding and finished product detection. And S8, mold circulation. According to the large-diameter duct piece prefabricating production line, through technical innovation in multiple aspects of mold, conveying, maintenance, control and the like, the core technical problem in existing large-diameter duct piece prefabricating production is solved, high-precision, high-efficiency, low-energy-consumption and green production of large-diameter duct pieces is achieved, and the large-diameter duct piece prefabricating production line has remarkable technical advantages and wide application prospects and is suitable for large-diameter duct piece prefabricating production. The method can be widely applied to infrastructure construction projects such as shield tunnels, open caisson projects and underground comprehensive pipe galleries.
Owner:CHINA RAILWAY 19 BUREAU GRP CO LTD +3

Universal template device for prefabricating concrete box girder component

The utility model discloses a concrete box girder member prefabrication universal template device, which relates to the technical field of concrete box girder prefabrication, and comprises a pedestal and a template assembly, the template assembly is arranged around the periphery of the pedestal so as to enclose a forming cavity for prefabricating a concrete box girder member above the pedestal; and the beam height adjusting pedestal is detachably arranged at the bottom in the forming cavity and stacked at the upper end of the pedestal, so that the beam height of the prefabricated concrete box beam component is adjusted by reducing the height of the forming cavity. Concrete box girder components of different models can be prefabricated, side formworks do not need to be replaced, bottom pedestal width splicing does not need to be carried out, and the prefabricated concrete box girder component has the advantages of being simple in structure and convenient, fast and efficient to construct.
Owner:浙江梁铭构件有限公司

Composite material hollow guide vane forming die and manufacturing method

A composite material hollow guide vane forming die comprises a bottom die and a pressing die, the bottom die is fixedly arranged, the pressing die can move relative to the bottom die, and the pressing die and the bottom die jointly define a forming space of a composite material hollow guide vane. Wherein the bottom die comprises a core die, the core die comprises an expansion body, the circumferential surface of the expansion body is configured to be an annular laying supporting face, and the expansion body enables the laying supporting face to expand in the radial direction. The mold can provide uniform pressure from inside to outside for the prefabricated body in the forming process, the uniformity of forming pressure distribution is improved, the prefabricated body is fully compacted, the quality defect caused by dimensional deviation or thermal expansion performance difference is avoided, and the part performance is improved. The invention further provides a manufacturing method of the composite hollow guide vane.
Owner:AECC COMML AIRCRAFT ENGINE CO LTD

Prestress applying device for fiber gridding cloth reinforced reinforced concrete precast slab

PendingCN119077942Aavoid shear damageoffset tensile stressMouldsFiberReinforced concrete
The invention relates to the technical field of prestressed fiber gridding cloth reinforced reinforced concrete construction, in particular to a fiber gridding cloth reinforced reinforced concrete precast slab prestress applying device which comprises a bottom die and four side dies, and the four side dies respectively comprise two test die long side plates and two test die short side plates. The bottom die and the four side dies are used for defining a test die, the number of the angle steel end plates is two, horizontal plates of the two angle steel end plates are arranged at the two ends in the test die respectively, and the angle steel end plates are fixed to the corresponding short side plates of the test die; the number of the flat steel plates is two, and the two flat steel plates are arranged at the two ends of the interior of the test mold respectively; the plurality of pressing rods are arranged in parallel and are all fixed in the test mold; a plurality of anchoring sliding blocks are arranged in parallel, and full-thread bolts with the number corresponding to that of the anchoring sliding blocks are screwed on each angle steel end plate in a threaded mode; the technical problem that the prestress of the fiber gridding cloth in the fiber gridding cloth reinforced reinforced concrete prefabricated slab cannot be applied is solved.
Owner:ZHENGZHOU UNIV +2

Form for vertically casting flared end products and method of manufacturing the same

ActiveUS20250073950A1MouldsPalletCasting
A base assembly with a pair of doors slidingly attached to the base assembly for moving between an open position and a closed position. An inner core comprising a first end and a throat end with the throat end having a larger diameter than the first end is positioned downward on top of the base assembly with the first end in an upright position. A pallet is positioned around the throat end of the inner core. When the pair of doors are in the closed position, a cavity is formed that is open from the top of the pair of doors and is located between the inner core and the pair of doors and corresponds to the shape of the concrete product with the flared end. The foregoing assembly allows for wet casting concrete products in a vertically upright position.
Owner:HAWKEYEPEDERSHAAB CONCRETE TECHNOLOGIES INC

Automatic forming equipment for concrete pole machining

The invention relates to the technical field of concrete pole machining, in particular to automatic forming equipment for concrete pole machining, which comprises a bottom plate, first electric guide rails, a moving frame, an extension plate, a horizontal sliding rail, a first sliding plate and the like, the top of the bottom plate is connected with the two first electric guide rails, and sliding blocks of the two first electric guide rails are jointly connected with the moving frame; an extending plate is connected to the bottom plate, a horizontal sliding rail is connected to the top of the extending plate, and a first sliding plate is slidably connected into the horizontal sliding rail. Cement mortar in the lower mold can be pressed through the pressing plate, the cement mortar in the lower mold is compacted, the pressing force every time is consistent, compaction is more uniform, compaction is carried out automatically, the burden of workers can be relieved, the upper mold and the lower mold can be driven to rotate through an output shaft of a driving motor, and the working efficiency is improved. And the cement mortar and the steel frame are fully mixed, and the cement electric pole is formed.
Owner:BAODING MANCHENG YONGWANG CEMENTS PROD CO LTD

Forming process and forming mold for precast concrete box-type house

The invention discloses a forming process and a forming mold of a precast concrete box-type house. The forming process comprises the following steps: step S1, pouring concrete out of a house bottom plate; s2, a wall plate inner mold and a wall plate outer mold are mounted on the house bottom plate subjected to pouring forming, and a wall plate pouring cavity is formed between the wall plate inner mold and the wall plate outer mold; s3, a top plate mold is in lap joint with the wallboard inner mold, and a top plate pouring groove is formed between the top plate mold and the wallboard outer mold; s4, a temporary supporting rod is arranged at the bottom of the top plate mold; s5, concrete is poured into the wall plate pouring cavities and the top plate pouring grooves, and house wall plates and roof plates are formed; s6, after the house wall plates and the roof plate are poured and formed, the wall plate inner mold, the wall plate outer mold and the temporary supporting rods are removed; the top plate formwork is a non-dismantling formwork, and the top plate formwork is reserved on the roof plate formed through pouring. The production efficiency of the box-type house can be improved.
Owner:华润智筑科技(定安)有限公司 +1

Concrete forming equipment and forming method for prefabricated box girder

InactiveCN119748603AMouldsGrinding drives
The invention provides concrete forming equipment and a forming method for a prefabricated box girder, and belongs to the technical field of concrete prefabricated box girders. The device comprises a guide table, a box girder body and a box girder prefabricated template used for forming the box girder body, and further comprises a partition lubricating assembly and a detection driving assembly. Through cooperation of the speed reducer, the lead screw and the hydraulic cylinder, the positions of the scraping plate and the grinding disc can be adjusted, the surface of the box girder is scraped and polished, and flatness and smoothness are ensured; the movable disc is matched with the spring, can adjust and buffer impact according to the surface fluctuation of the box girder, protects the box girder and prolongs the service life of the millstone and the movable disc; the partition lubricating assembly realizes precise lubrication by using a special nozzle and a nano channel; the low-viscosity nano lubricant guarantees timely lubrication, the detection driving assembly intelligently controls the lubrication degree according to feedback of a friction force sensor, the utilization rate is improved, the grinding disc condition can be inferred by analyzing sensor data, grinding disc parameters are adjusted in time when friction force is abnormal, and damage to a box girder and excessive abrasion of the grinding disc are prevented.
Owner:ZHEJIANG JINZHU TRANSPORTATION CONSTR

Repair roadway model test lining model prefabricating device and method

The invention discloses a repair roadway model test lining model prefabricating device which comprises an inner mold and an outer mold, the inner mold and the outer mold are detachably connected to a bottom plate, an inner ring clamping groove and an outer ring clamping groove are formed in the bottom plate, the inner mold and the outer mold are clamped in the clamping grooves, and the inner ring clamping groove and the outer ring clamping groove are formed in the bottom plate. A plurality of through holes are formed in the inner mold and the outer mold, short rods are arranged in the through holes of the inner mold and the outer mold in a penetrating mode, and a pouring cavity is formed among the inner mold, the outer mold and the bottom plate. The device is simple in manufacturing process, accurate in size, light in weight, low in manufacturing cost, easy to mount and demould, detachable and reusable, meanwhile, the test cost is greatly saved, the test efficiency is improved, and the use effect is good.
Owner:INST OF GEOMECHANICS

Concrete pole production mold

The utility model provides a concrete pole production mold, and relates to the field of molds. Comprising an upper die and a lower die which are matched with each other, first opening and closing die assemblies are symmetrically arranged on the two sides of the upper die, and second opening and closing die assemblies matched with the first opening and closing die assemblies are symmetrically arranged on the two sides of the lower die; the first mold opening and closing assembly comprises first shells fixedly connected to the two sides of the upper mold, rotating rods rotationally arranged on the inner sides of the first shells, worms embedded in the rotating rods at equal intervals, worm wheels meshed with one sides of the worms and rotationally connected with the upper mold, and bolts arranged on the inner sides of the worm wheels in a sliding mode and capable of rotating along with the worm wheels. Threaded holes corresponding to the bolts are formed in the edge of the upper die and the edge of the lower die. The upper die and the lower die can be automatically connected and fixed, a worker does not need to tighten a bolt, time and labor are saved, and production efficiency can be improved.
Owner:GANXIAN BRILLIANT CEMENT PROD CO LTD

Casting apparatus and casting method for manufacturing ceramic articles

Casting method and apparatus (1) for manufacturing ceramic articles (2), the apparatus (1) comprising: - a mould (3) which, in turn, comprises: at least two mould parts (4A, 4B, 4C or 4A, 4B, 4C, 4D and 4E) mutually movable between a closed configuration, in which they are coupled to one another to define a casting cavity (5) and an open configuration; and at least one insert (6), adapted to cooperate with said at least two mould parts to create at least one undercut zone (P) in the ceramic article (2); - a feeding system to feed a mixture under pressure into said casting cavity (5); - a moving device (9) for automatically positioning the insert (6) in coupling with at least one of said two mould parts, when they are in the open configuration; and - a hydraulic system operatively connected exclusively to the at least two mould parts so as to feed a fluid under pressure through them.
Owner:SACMI COOPERATIVA MECCANICI IMOLA SOC COOP ARL