5 results about "Project management process" patented technology

A project management process is the management process of planning and controlling the performance or execution of a project.

Reconfigurable equipment simulation system based on software radio

PendingCN121502861AGeometric CADDesign optimisation/simulationProject management processDesigned equipment
The invention relates to a reconfigurable equipment simulation system based on software radio, and the system achieves the high-integration, user-friendly and efficient-management reconfigurable equipment simulation system through the modularization and seamless integration of a radio waveform design function, an equipment simulation user operation interface design, a business logic function design and a project management function. Therefore, even if a user does not have a deep programming capability, the user can quickly construct, test, manage and deploy the equipment simulator with complete functions. The system is rich in waveform component and UI component library, customizable in function and good in flexibility, software radio waveform design and equipment simulation are innovatively and seamlessly integrated, automatic non-inductive or manual upgrading can be achieved, the universality is good, various equipment simulators can be designed, the designed equipment simulators have open function expansion, and the system is suitable for popularization and application. And a complete project management process is provided.
Owner:DAYAO INFORMATION TECH (HUNAN) CO LTD

Engineering project management process display device

ActiveCN223941520UBoardsDisplay boardProject management process
The utility model relates to the technical field of engineering projects, and discloses an engineering project management process display device which comprises a frame body, a supporting plate is arranged at the bottom of the frame body, folding pages and telescopic rods are arranged on the inner sides of two sets of frame bodies, the two sets of telescopic rods are located on the upper sides and the lower sides of the folding pages, and a shielding cover is arranged on the upper portion of the frame body. The folding hinge is composed of multiple sets of hinge plates, lantern rings are arranged on the left side and the right side of each hinge plate, pin shafts are arranged in the lantern rings, placing grooves are formed in the inner sides of the hinge plates, display plates are arranged in the placing grooves, the telescopic rod comprises a positioning pipe, a telescopic pipe is arranged in the positioning pipe, and the telescopic rod is connected with the telescopic pipe. According to the scheme, when the device is stored, the device can be folded and stored by folding the blade plates and retracting the telescopic rods, so that the placement area of the device is effectively reduced, the occupied space of the device during placement is reduced, and the device can be better stored and placed.
Owner:SHUIFA ENERGY ENG CO LTD +6

A building carbon emission digital calculation method based on IFC data standard

PendingCN122390214AProject management processBuilding design
The embodiment discloses a building carbon emission digital calculation method based on an IFC data standard, is based on BIM modeling software, is based on life cycle assessment theory, constructs a BIM model of the whole life cycle of building carbon emission, divides the life cycle of the whole building unit into four main stages: building design and transportation stage, building construction stage, operation and maintenance stage and demolition disposal stage, and obtains the carbon emission of each stage based on the carbon emission calculation model of each stage, and then realizes the comprehensive evaluation of building carbon emission in the building project management process, realizes the carbon emission accurate quantification, visual analysis and intelligent decision-making of the whole process from building transportation, construction, operation to demolition.
Owner:CHINA RAILWAY FIRST GRP SECOND ENG CO LTD +1

Project plan Gantt chart generation method and device, computer equipment and medium

The invention relates to the technical field of natural language processing, and particularly discloses a project plan Gantt chart generation method and device, computer equipment and a medium. According to the method, the initial management process can be automatically generated according to the to-be-analyzed file and the business knowledge graph, the process is adjusted according to the execution result of each process node in the execution process, and the project plan Gantt chart is generated, so that automatic generation and dynamic optimization of the project plan Gantt chart are realized, manual participation is not needed, and the efficiency is improved. And the generation efficiency of the project plan Gantt chart is improved. The method is applied to management process generation business of projects such as financial product development and medical tool research and development, the generation efficiency of the project management process can be improved, the management process can be dynamically optimized according to the execution result of each process node, and the management efficiency of the projects such as product development and tool research and development is improved.
Owner:CHINA PING AN PROPERTY INSURANCE CO LTD

A system and method for implementing project management process groups through custom stages

The application discloses a system and method for realizing project management process groups through self-defined stages, which comprises the following steps: step one, device composition; step two, assignment; step three, trigger condition; step four, intelligent triggering; and step five, input record. The application realizes fuzzy searching by calling preset functions LIKE / NOTLIKE in a database, so that similar values and similar values of the input self-defined values can be easily searched, the central processing unit can call the trigger conditions stored in the database to run, the function of intelligent fuzzy matching is realized, the problem that the computer cannot recognize the input instruction of the user when the user inputs incomplete or non-standard instructions is solved, the intelligent effect of the control process group is increased, the user does not need to accurately input the self-defined values, the operation difficulty of the user is reduced, and the intelligent effect of the method for controlling the project management process group is increased.
Owner:YOP NETWORK TECH CO LTD