Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

101results about How to "Realize the whole process management" patented technology

Management system and method of enterprise technology center

The invention discloses a management system and method of an enterprise technology center. The system comprises a main program server, a database server, an internal information publishing server, an external communication server, an instant messaging system server and a research and development assisting system server; the main program server stores an information management system, an information analyzing system and a report management system; the database server is a server equipped with a disk array; the internal information publishing server stores an information publishing system; the external communication server stores an external communication system; the instant messaging system server stores an expert online instant messaging system; the research and development assisting system server stores a research and development assisting system which consists of a TRIZ (Teoriya Resheniya Izobreatatelskikh Zadatch) database and an audit module. According to the management system and method of the enterprise technology center, all the systems above are utilized for managing the research and development working process and managing process of the technology center, and therefore, the informatization system management of the enterprise technology center is realized.
Owner:山东新矿信息技术有限公司

Novel propellant management device used in propellant storage box

A novel propellant management device used in a propellant storage box comprises a central supporting column, flow guide blades, supporting column blades, large blades, liquid storage blades, an upper pressing plate, an upper mesh, an upper supporting plate, small cylinders, a framework, a lower pressing plate, a lower mesh and a lower supporting plate, wherein the flow guide blades, the supporting column blades and the large blades are all fixedly mounted on the central supporting column in the radial direction to form an integral structure, the integral structure is fixedly mounted on the upper pressing plate through the central supporting column, the supporting column blades and the large blades are mounted in the same plane, and a mounting plane of each flow guide blade and a mounting plane of each large blade form a certain included angle; the liquid storage blades are fixedly mounted on the upper pressing plate in the radial direction; the upper pressing plate, the upper mesh, the upper supporting plate, the small cylinders, the middle framework, the lower pressing plate, the lower mesh and the lower supporting plate are sequentially fixedly mounted from top to bottom to form the integral structure, namely, a liquid accumulation assembly. The novel propellant management device has the inhibition function on shaking of liquid, performs comprehensive management on propellants and is simple in structure, high in strength and reliability and large in liquid storage capacity, the on-orbit work application range is large, the on-orbit liquid discharge speed is high, and meanwhile, repeated large-flow filling on the ground can be realized.
Owner:BEIJING INST OF CONTROL ENG

Industry cluster education training coaching system

InactiveCN104978619ARealize the design conceptMeet various needs of learning and trainingResourcesWeb siteApplication server
The invention provides an industry cluster education training coaching system, which solves the problems of teaching content transmission limitation and lack of effect examination after training of the existing E-learning. The industry cluster education training auxiliary system is characterized in that a client is connected with an industry cluster education training coaching website through a network; the industry cluster education training coaching website is connected with a network server and an application server; the network server is connected with a database and comprises a system setting module, an organizational mechanism management module, a learning content management module, a face-to-face teaching course management module, an examination management module, a learning tip action planning module, a successful case module, a knowledge center module, an investigation management module, a statistical form module and a website management module. The industry cluster education training coaching system has the beneficial effects that the characteristics of great information amount, visualization and data downloading are realized; corresponding links are arranged on a home page of the website; the effect of entering the corresponding module can be achieved through the links; and a customer can more timely, faster and more conveniently learn the self required courses and can download the self required data.
Owner:辽宁生产力促进中心

Big data based intelligent factory manufacturing management system

InactiveCN109634229AConvenient to get nearbyTimely feedback processingElectric/hybrid propulsionTotal factory controlNumerical controlMachine parts
The invention belongs to the technical field of big data, and discloses a big data based intelligent factory manufacturing management system. The big data based intelligent factory manufacturing management system comprises an integrated control system, a material transmission system, a data acquisition analysis and monitoring system, a communication system, a workshop central management and control system. According to the system, the relevant conditions can be conveniently acquired by workers, timely feeding back and processing can be carried out, the management quality of a production and manufacturing enterprise can be effectively improved, the production cost is reduced, and the serial processes among the operation processes of original equipment are changed into parallel processes among the operation processes, the full-process management of numerical control machining is realized, the efficiency and the rhythm of each preparation link are determined before the numerical control equipment is used for machining parts as well, and the abnormality and the delay situation of execution of a program in the production preparation process can be quickly positioned; and when a system judges that the machining plan condition is met, the machining program, a process document, the tool list information can be automatically sent to a station, the on-time production is realized, and theproduction efficiency of the machinery manufacturing enterprise is obviously improved.
Owner:DONGGUAN UNIV OF TECH

Automobile manufacturing intelligent production scheduling processing method

The present invention discloses an automobile manufacturing intelligent production scheduling processing method. The method comprises the following steps of: receiving order information input from theoutside, and adding the order information into an order material list; combining product series and product models in the order material list and a preset manufacturing material list to generate a manufacturing material list; and combining the automobile product names and the automatic product codes in the manufacturing material list and a preset process material list to generate a production material list. The production material list of required production is automatically generated according to orders. Because the production material list, the assembling pitch time and the logistics pitchtime of each station in the production are calculated; and according to the pitch time of the manufacturing process of each product and the required produced number, and according to the calculation method in the document mentioned above, on the premise of ensuring the market demand, the production organization is performed by the fewest manpower resource so as to achieve the purpose of the benefit optimization production scheduling.
Owner:苏州圣基尚源信息科技有限公司

Intelligent project management system

The invention relates to an intelligent project management system, which comprises a project management module, a system management module, an approval management module, a resource management module,a supervision management module and a reminding and punishment module. The system has a chart statistics function, realizes objective management, plan management, summary management, evaluation management and quality management and the like of the whole process of the project, and can carry out integrated deployment management on personnel, equipment, materials and fund resources, thereby improving resource utilization rate; the system has a timeout automatic penalty function and integrates intelligent pressure-sensitive original handwriting hardware; when paper is signed or paper records arewritten, original handwriting electronic data is kept synchronously; the system integrates access control and attendance hardware and a temperature and humidity detector, and has a supervisory and management function, thereby preventing the submitted data from being tampered and deleted and ensuring originality and integrity of the data; the system wholly plays the function of risk control and cost control, thereby improving efficiency and project success rate; and the system is especially suitable for research and development and project management in the medical field.
Owner:黄玉新

Mobile intelligent meter reading system

ActiveCN101571990AImprove technology independenceImplementation technology does not affectTransmission systemsWireless communicationData synchronizationWeb service
The invention discloses a mobile intelligent meter reading system. The invention is characterized in that the system comprises a PC interface end, a PC work station, a GPRS network, a mobile terminal, an electronic tag, a concentrator and a printing terminal. The PC interface terminal sets a Web Service interface to synchronize data and to realize the uploading and the downloading of the data; the PC work station is used for leading the mobile terminal to be accessed into an enterprise MIS network; a GPRS network is used for leading the mobile terminal to be accessed into the enterprise MIS network; the mobile terminal uses a palm PDA to set a mobile meter reading procedure, a 232 serial port, a Bluetooth interface and a radio-frequency card, so as to realize each task such as downloading, uploading, managing meter reading, gauging and recording information, recording defects, reading meter on the spot, printing the advice note of energy charge, and counting meter reading results, and the like; the concentrator realizes the communication between the palm PDA mobile meter reading procedure and the ammeter of a meter box; and the printing terminal realizes the on-spot printing of the advice note of the energy charge of the mobile meter reading procedure on the palm PDA by the Bluetooth. The system realizes the combination of mobile intelligent meter reading and marketing MIS.
Owner:HEFEI POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1

Assistant diagnosis and treatment system based on knowledge graph

ActiveCN110459320AQuickly know the stage of diagnosis and treatmentGet quick diagnosis and treatment adviceImage enhancementMedical data miningMedical knowledgeNODAL
The invention discloses an assistant diagnosis and treatment system based on a knowledge graph. The system comprises a database, a patient information processing module and a diagnosis and treatment scheme push module, wherein the database is used for storing the medical knowledge graph, and the knowledge graph takes medical operations as nodes and takes the patient state between every two continuous medical operations as an edge; the patient information processing module receives information of a patient, extracts historical medical operations and patient state information and sends the historical medical operations and the patient state information to the diagnosis and treatment scheme push module; the diagnosis and treatment scheme push module acquires the knowledge graph from the database, matches the patient information with the knowledge graph according to the direction indicated by the edge in the knowledge graph, determines the position of the current state, in the knowledge graph, of the patient, and pushes a to-be-detected medical index and / or the next diagnosis and treatment operation based on the knowledge graph. By means of the assistant diagnosis and treatment system,the diagnosis and treatment stage of the patient can be quickly known, and a next diagnosis and treatment advice is given.
Owner:SHAN DONG MSUN HEALTH TECH GRP CO LTD

Plan-based assistant decision-making method, tailing pond monitoring method and system

The first purpose of the invention is to provide a plan-based assistant decision-making method. The plan-based assistant decision-making method comprises the following steps of: step A, establishing a case database; step B, inputting emergency events; step C, judging whether the emergency events belong to a plan database, if yes, then directly calling and processing, or else, going to the next step; step D, calculating the similarity of each attribute in the emergency events; and step E, calculating the total similarity of the emergency events, comparing the total similarity of the emergency events with a set threshold, and taking corresponding measures. The second purpose of the invention is to disclose a tailing pond monitoring method, which comprises an on-line monitoring system and the above-mentioned plan-based assistant decision-making method. The third purpose of the invention is to provide a tailing pond monitoring system. The method and monitoring system provided by the invention rationally use information in a case database, and perform assistant decision making on abnormalities occurring in the tailing pond and accident treatment, which can guarantee the safe operation of the tailing pond, and reduce the disaster loss of the tailing pond to the greatest extent.
Owner:中铝智能(杭州)安全科学研究院有限公司

Complex structure welding parameter precise management and control system and welding method

The invention relates to a complex structure welding parameter precise management and control system comprising a man-machine interaction unit, a parameter collection unit, an alarm unit, a code scanning unit, a welding operation unit and a welding monitoring unit connected with the man-machine interaction unit, the parameter collection unit, the alarm unit, the code scanning unit and the weldingoperation unit. The man-machine interaction unit is used for inputting preset technological information. The code scanning unit is used for reading a two-dimensional code containing welded workpiece information and welder information. The parameter collection unit is configured to collect welding parameters in real time in the welding process. The welding monitoring unit is used for verifying thewelded workpiece information and the welder information read by the code scanning unit. In the welding process, the welding monitoring unit compares the welding parameters collected by the parameter collection unit with parameters in a corresponding preset technology in real time, and the alarm unit and the welding operation unit are controlled to act according to the comparison result. The invention further relates to a welding method utilizing the complex structure welding parameter precise management and control system, the welding parameters can be monitored precisely, and the automation level is increased.
Owner:CRRC QINGDAO SIFANG CO LTD

Beautiful village construction big data platform

A beautiful village construction big data platform comprises an object management subsystem, a measure analysis subsystem, a standing book tracking subsystem, an effect analysis subsystem, a data acquisition subsystem, a data exchange and sharing subsystem, a basic support subsystem and a beautiful village construction general information resource pool. The object management subsystem, the measure analysis subsystem, the standing book tracking subsystem and the effect analysis subsystem conduct analysis mining and visual display with the big data technology based on the core support of the beautiful village construction general information resource pool and the basic support subsystem. On the basis of a comprehensive assessment system with one comprehensive index, five systems and thirty indexes, the beautiful village construction big data platform is realized with the big data related technology, the implementation condition of beautiful village feature construction measures is digitized, visualized and systematized, the aims of getting a clear picture of the truth of matters, capturing features, taking measures accurately and laying emphasis on effects for the beautiful village are achieved, and a main basis is provided for the government department in planning construction as a whole and making a scientific decision.
Owner:中电万维信息技术有限责任公司

Transmission and transformation project environment monitoring and sensitive area prediction system and method

The invention discloses a transmission and transformation project environment monitoring and sensitive area prediction system and method. According to the geographical information corresponding to a transmission and transformation project and a spatial entity of an environment sensitive object, the shape of a buffer zone is determined, and a distance vector algorithm and space overlap are used for determining the range and size of an environment sensitive area to carry out data interaction and communication with a monitoring center; environment parameter data collection is conducted on measure points set in the determined environment sensitive area, relevant environmental impact assessment influence factor parameter values are extracted, obtained various influence factor indexes are matched with all stages of the transmission and transformation project, environmental protection measure implementation photos and videos of all the stages of the transmission and transformation project are collected, at the same time, a receiving report of the transmission and transformation project is received, relevant environmental protection measure inspection and acceptance results are extracted, and relevant data of the all stages is transmitted to the monitoring center, which has great meanings for the construction of an intelligent power grid.
Owner:ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +3

Intelligent encoding system for detecting live tool

The invention discloses an intelligent encoding system for detecting a live tool and particularly relates to a system for performing information query and remote monitoring and management on a tool byscanning a two-dimensional code on a tool tag. The system includes an intelligent code management platform, a two-dimensional code tag printing device and a two-dimensional code scanning device. Theintelligent code management platform automatically encodes tool information and generates the two-dimensional code, the two-dimensional code tag printing device intelligently selects a corresponding mode to print the two-dimensional code tag according to the tool type, the two-dimensional code tag is pasted to the tool, the two-dimensional code scanning device scans a tool position two-dimensionalcode and a corresponding position tool two-dimensional code, and the tool and the corresponding position information are bonded and recorded in the intelligent code management platform. According tothe system, the two-dimensional code is scanned through a mobile phone APP, the whole-process monitoring of the production and usage of the tool is performed, the system has functions of test validityperiod proximity prompt and out of validity, and the full-lifecycle management of the tool is achieved.
Owner:JIANGSU FRONTIER ELECTRIC TECH +2

Surgical instrument management method, system and device

The invention discloses a surgical instrument management method which comprises the following steps: receiving a surgical plan, judging whether a surgical instrument required by the surgical plan hasa material shortage risk or not, and if not, determining the surgical plan and sending an execution instruction; reading a total identification code of a surgical instrument package, and downloading asurgical instrument list, the surgical instrument package coming from a supply room and containing surgical instruments; sequentially reading the identification codes of the surgical instruments fordata comparison, prompting whether the surgical instruments in the surgical instrument bag are complete or not, entering the next process if the surgical instruments are correct and complete, otherwise, giving an alarm and checking again, and if the surgical instruments are determined to be missing, performing an instrument missing process and recording comparison information. Aiming at managementand counting of the surgical instruments, the surgical instruments before, during and after an operation are conveniently counted one by one, it is guaranteed that the surgical instruments cannot beleft in the body of a patient, use records can be recorded, and subsequent instrument management is facilitated.
Owner:VG MEDICAL TECH CO LTD

Spliced steel arch frame and manufacturing method thereof

The invention provides a splicing steel arch frame. The splicing type steel arch frame comprises a vault support and two side wall supports located at the two ends of the vault support. The vault support is formed by connecting a plurality of first supports, and each side wall support is formed by connecting a plurality of second supports. The first supports and the second supports each comprise profile steel and a connecting steel plate; the connecting steel plates are perpendicularly welded to the ends of the two ends of the profile steel, and two sets of symmetrical connecting holes are formed in the connecting steel plates. Profile steel for manufacturing the first supports and the second supports is the same in length and width, a groove for positioning and inserting the profile steelis milled in the center of each connecting steel plate, and the shape and the size of the section of the groove are the same as those of the profile steel. The manufacturing method of the steel archframe comprises the steps of: steel arch frame design; material preparation; cold bending deformation and welding; and storage. The splicing steel arch frame has the advantages of being simple in structure, tight in connection and convenient to store and transport; and the manufacturing method of the splicing steel arch frame enables the steel arch frame to achieve process operation, and the rateof finished products is high.
Owner:CCCC SHEC DONGMENG ENG CO LTD

Mine business to-do list processing method

PendingCN110163562ASolve poor communication transmissionResolve delaysOffice automationFull life cycleBusiness class
The invention discloses a mine business to-do list processing method. The method comprises the following steps: creating a business form and initiating a business process; logging in the technical collaboration platform, and signing and checking the to-do list and the business form; clicking a service software link, and starting service software; the service software downloads related service datafrom the central database; completing the business work by a mine business engineer through business software; the attachment page is uploaded to a central database; submitting a service form and automatically forwarding to a next process node according to the service process flow; receiving the mine business to-do reminding by the next process node, checking whether the business work of the previous process node meets the requirements or not, rejecting if the business work of the previous process node does not meet the requirements, and continuing if the business work meets the requirements;and enabling the mine business process flow to the next process node, and so on until the business process is finished. According to the invention, the unification, process management and collaborative operation of the mine full-life-cycle business are realized, the data sharing is realized, the data loss and inconsistency are avoided, and the working efficiency and quality of the mine business are improved.
Owner:CHANGSHA DIGITAL MINE

Substation operation and maintenance hidden danger whole-process management and control system

The invention discloses a substation operation and maintenance hidden danger whole-process management and control system, and the system comprises a voice recognition device which is used for converting the content of voice into characters through voice recognition, and transmitting the data to a communication network system in real time; the on-site image, image and audio acquisition device is used for carrying out camera shooting acquisition on on-site equipment and images and audios of workers and transmitting acquired data to the communication network system in real time; the geographic position information acquisition device is used for transmitting the geographic position information of the acquired place to the communication network system in real time; the communication network system is used for transmitting the voice data, the image data and the geographic position data which are received in real time to the online monitoring and analyzing device; and the on-line monitoring and analyzing device is used for analyzing and classifying the received various voice data, image data and geographic position data, obtaining an analysis result and storing the analysis result. According to the invention, the labor cost, time cost and financial cost for substation operation and maintenance personnel to collect, upload, analyze, screen and check hidden dangers can be reduced.
Owner:STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products