Intelligent project management system

A project management system and project management technology, applied in data processing applications, resources, calculations, etc., can solve a large number of manual operations, cannot be covered by the project management system, and the project management system is simple, etc., to achieve the effect of easy operation

Inactive Publication Date: 2018-06-08
黄玉新
View PDF7 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the past, project management usually used project or excel software for project management, but in the process of use, on the one hand, the operator needs to have strong editing ability, and needs to be familiar with various command editing and logical operation formulas, and on the other hand, a lot of manual operations are required. Due to the characteristics of intelligence and automation, it is impossible to analyze and solve comprehensive problems, and it is impossible to realize functions such as process approval
In addition, some existing manufacturers can provide oa system and erp system, but some of these systems do not contain project management modules, and some of them are very simple even if they do. To be clear about the specific project management process and management content, users need to build their own functional modules or customize modules according to their needs, which consumes a lot of manpower and material resources
Although some project management systems have appeared in the face of the vast demand, the existing project management systems that are known are all too simple, simply considering project management, occasionally involving personnel and other simple aspects, and cannot achieve comprehensive planning and management functions. Moreover, different fields have their own particularities, and there are huge differences in project management work characteristics and project management content in different fields. It is impossible to use one project management system to cover all fields.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent project management system
  • Intelligent project management system
  • Intelligent project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0073] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0074] This system can be developed based on Microsoft.NET / ASP.NET 4.0, the database adopts SQL Server, and the development tool Visual Studio 2013 can also be developed based on Microsoft Visual Studio.NET+MSSQL database, and the database can also use Oracle and other databases. Technicians can use multiple languages ​​to achieve the same effect, preferably using the language C#, which can be designed with three or more layers of structure.

[0075] After the system is installed on the server, the user can log in as a web page through the computer terminal or the mobile communication device terminal with browser Internet access function without any client installation program. LAN, Internet and mobile Internet can log in, with Extensive system compatibility features, user-friendly.

[0076] Such as figure 1 Shown is the overall module struc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an intelligent project management system, which comprises a project management module, a system management module, an approval management module, a resource management module,a supervision management module and a reminding and punishment module. The system has a chart statistics function, realizes objective management, plan management, summary management, evaluation management and quality management and the like of the whole process of the project, and can carry out integrated deployment management on personnel, equipment, materials and fund resources, thereby improving resource utilization rate; the system has a timeout automatic penalty function and integrates intelligent pressure-sensitive original handwriting hardware; when paper is signed or paper records arewritten, original handwriting electronic data is kept synchronously; the system integrates access control and attendance hardware and a temperature and humidity detector, and has a supervisory and management function, thereby preventing the submitted data from being tampered and deleted and ensuring originality and integrity of the data; the system wholly plays the function of risk control and cost control, thereby improving efficiency and project success rate; and the system is especially suitable for research and development and project management in the medical field.

Description

technical field [0001] The present invention relates to the field of project management of pharmaceutical product research and development, specifically an intelligent project management system with functions such as automatic statistical analysis, automatic reminder, and automatic punishment, and integrates intelligent handwriting hardware, temperature and humidity detection hardware, and access control and attendance hardware. It belongs to the technical field of computer software programs. Background technique [0002] For project management work, managers at different levels have different concerns. Investors care about whether they can achieve their goals and when they can achieve their goals to create benefits. Project managers care about how to effectively control the process, not deviate from the goal, and reduce risks. , How to effectively control the cost, how to complete it smoothly, how to ensure that the project information is not lost due to unstable personnel ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/063
Inventor 黄玉新黄恋乔乔爽
Owner 黄玉新
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products