Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Large-scale project management system and method based on blockchain technology

A management system, large-scale engineering technology, applied in transmission systems, digital transmission systems, data processing applications, etc., can solve problems such as poor linkage ability, affecting the interests of stakeholders in the process of large-scale projects, and stakeholder trust crisis, etc. Security and non-repudiation, reducing risk and transaction costs, facilitating the effect of transaction automation

Inactive Publication Date: 2018-10-09
NO 719 RES INST CHINA SHIPBUILDING IND
View PDF7 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. The data is not highly available, that is, it is very dangerous for the data to exist in one place. When the node's own database is damaged, the data will be lost;
[0004] 2. Single-point control, that is, there is only one writing point, and the work efficiency is low;
[0005] 3. Poor linkage ability, that is, when stakeholders need to exchange data, they need to take out their own data for statistics and reports, and then carry out data interaction after the consent of the respective node leaders, the process cycle is long and the transparency is poor;
[0006] 4. Data inconsistency, that is, in the process of project implementation, the data generated by all stakeholders are stored in their own databases, which is prone to data inconsistency;
[0007] 5. The data security is poor, that is, the stakeholders randomly change the parameters, amount, progress, etc. according to the principle of maximizing their own interests, which leads to a crisis of trust among the stakeholders
[0008] The above problems will seriously affect the progress of large-scale projects and the interests of various stakeholders, making large-scale project management deadlocked

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-scale project management system and method based on blockchain technology
  • Large-scale project management system and method based on blockchain technology
  • Large-scale project management system and method based on blockchain technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054]The present invention will be further described below in conjunction with the accompanying drawings.

[0055] according to figure 1 As shown, a large-scale project management system and method based on block chain technology, including enterprise large-scale project stakeholder nodes, project implementation process, block chain system; characterized in that: the project implementation process is the enterprise large-scale project implementation Steps, personnel, results, constraints, etc. in the process; the stakeholder nodes of the large-scale projects of the enterprise are the main stakeholders participating in the large-scale projects of the enterprise, and the relevant departments of the enterprise responsible for the project; the blockchain system As an alliance chain, it consists of a series of functional modules. The blockchain system integrates the stakeholder nodes and project implementation process of large-scale projects into the blockchain, and uses the func...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a large-scale project management system based on the blockchain technology. A central node, stakeholder nodes, a key module, an information retrieval module and a block structure module form an integrated body; the central node is a planning department node, the stakeholder nodes are a R&D department node, an expert group node, a finance department node, a construction unitnode and a device unit node; the central node and the stakeholder nodes are connected through the P2P network. The system is advantaged in that the stakeholder nodes of the enterprise large-scale project and the project implementation flow are interconnected through the blockchain technology, and stakeholders are made to participate effectively in large-scale project management; data generated during project implementation are stored in the multiple nodes, and data availability is improved; blockchain reading and writing permissions are effectively allocated, and data security and non-repudiation are improved; the contract dispute risk and transaction cost are reduced, and transaction automation is promoted.

Description

technical field [0001] The present invention relates to the field of project management and computer application technology, specifically a large-scale project management system and method based on block chain technology. Background technique [0002] In traditional large-scale project management, all stakeholders have their own business processes and business data, which are stored in databases operated by all parties. This will have the following problems: [0003] 1. The data is not highly available, that is, it is very dangerous for the data to exist in one place. When the node's own database is damaged, the data will be lost; [0004] 2. Single-point control, that is, there is only one writing point, and the work efficiency is low; [0005] 3. Poor linkage ability, that is, when stakeholders need to exchange data, they need to take out their own data for statistics and reports, and then carry out data interaction after the consent of the respective node leaders, the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10H04L9/32
CPCH04L9/3234H04L9/3236H04L9/3247H04L9/3297G06Q10/103H04L9/32H04L9/50
Inventor 余然
Owner NO 719 RES INST CHINA SHIPBUILDING IND
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products