174 results about "Decision scheme" patented technology

A rule or strategy used in a group to select an alternative from choices put forward during discussions. These schemes or laws are sometimes explicitly acknowledged by the group, as when a formal tally of those favouring the alternative is taken. SOCIAL-DECISION SCHEME: "The social decision scheme is used to choose a project.".

Photovoltaic power station fault diagnosis method based on fuzzy production rule knowledge base

The invention relates to a photovoltaic power station fault diagnosis method based on a fuzzy production rule knowledge base, and belongs to the technical field of electric engineering informatization. According to the method, firstly, the field knowledge of photovoltaic power station equipment warning and fault information is stored in a fact and rule form for forming a fault information knowledge base; then, fuzzy logics are adopted for carrying out qualitative analysis on the fault information base of photovoltaic power station equipment, and a judging rule between a fault phenomenon and a reason is determined; detected fault feature vectors are subjected to fuzzy matching with each rule antecedent in a rule base; and according to the matching relationship between the fault phenomenon and the judging rule, the fault diagnosis reason and the result are determined, the fault is positioned, and an overhaul decision scheme is given. The photovoltaic power station fault diagnosis method has the advantages that the final fault or the most possible fault can be fast searched and positioned; meanwhile, the knowledge base is inquired to obtain the overhaul decision; the overhaul decision is provided for overhaul personnel, so that the overhaul personnel can shorten the fault inquiry time; the goal of fast repairing fault equipment is achieved; and the power station machine halt time is reduced, or the power station machine halt is avoided.
Owner:STATE GRID CORP OF CHINA +1

Space-time regulation and emergency guidance system and method for scenic spot tourists

The invention provides a space-time regulation and emergency guidance system and method for scenic spot tourists. The space-time regulation and emergency guidance system for scenic spot tourists comprises a hardware basis platform and an application software system, wherein the hardware basis platform comprises a tourist flow volume collector, a video monitor, a multimedia service terminal, a TRE server and a control management platform; the application software platform comprises a tourist flow analysis module, a video analysis module, a space-time regulation module, a TRE database, a scenic spot tour guidance module, a flow distribution and emergency guidance module, a flow distribution and emergency monitoring module and a TRE management module, and the tourist flow analysis module is used for judging the saturation condition of the tourist flow volume of a scenic spot and judging whether abnormal phenomena exist in the scenic spot by analyzing the bidirectional tourist flow volume, which is collected by the tourist flow volume collector, of a dispersion point in the scenic spot and the tourist flow real-time state, which is collected by the video monitor, of a scenic spot core area and a dispersion thoroughfare; according to a judgment result, the flow distribution scheme and the emergency decision scheme of each scenic spot are matched according to the relevant setting of the TRE database; information is transferred to tourists by the multimedia service terminal to guide the tourists to choose a touring route; and the situation of excess tourists in certain space time is alleviated.
Owner:SHAANXI NORMAL UNIV

Emergency rescue decision making system aiming at natural disasters and method thereof

The invention discloses an emergency rescue decision making system aiming at natural disasters and a method thereof. A hardware platform comprises a disaster information data input terminal, a database, an application server, a client decision making terminal, a comprehensive natural-disaster knowledge management terminal, a consultation terminal and a printing terminal; a software platform comprises a disaster information acquisition module, an task intelligent analysis module, an emergency rescue decision making module, a decision making scheme consultation module, a decision making scheme output module, a data management module and a natural disaster knowledge management module. By utilizing the emergency rescue decision making system, after the disaster information is obtained, the intelligent analysis of the decision making task is carried out, decision making is carried out under the support of basic data and knowledge, synergetic consultation of experts can be carried out on the obtained feasible scheme, the decision making scheme is output and implemented, the effect of implementing the decision making scheme is evaluated, and the implemented scheme is successfully stored. In the emergency rescue decision making system, according to the whole process of natural disaster development, corresponding emergency rescue measures are given, decision making support is provided for emergency rescue of the government, and the loss caused by natural disasters is reduced.
Owner:HEFEI INSTITUTES OF PHYSICAL SCIENCE - CHINESE ACAD OF SCI

Method for automatically determining rescue path of expressway network

The invention discloses a method for automatically determining a rescue path of an expressway network. The method comprises the following steps of: 1, after a traffic accident, acquiring information of an accident site, information of peripheral emergency rescue points and information of a road network; 2, searching a path which has the shortest distance from a peripheral rescue point to an accident point and serves as an initial backup rescue path from the expressway network according to the position of the accident point and the position of the peripheral rescue point; and 3, determining a traffic stream direction influenced by the traffic accident according to lane occupied positions and traffic stream directions of the occupied lanes on the accident site, and acquiring a road condition of the accident site, the number of jammed lanes of the accident site and the position of the accident point. By the method, a rescue path decision scheme in the expressway network of emergency resources can be generated automatically, so that the emergency resources can be transported to the accident site immediately, the emergency rescue efficiency can be improved, and casualties and property loss can be reduced.
Owner:SOUTHEAST UNIV

Traffic simulation integration system based on interaction usages of macroscopic, mid-scopic and microscopic traffic simulation platforms

InactiveCN102393928AEasy to integrateStrengthen inheritanceForecastingDecision schemeData acquisition
The invention, which belongs to the virtual simulation technology field, more particularly relates to an integrated traffic simulation system based on interaction usages of macroscopic, mid-scopic and microscopic traffic simulation platforms. The system comprises a macroscopic traffic simulation module, a mid-scopic traffic simulation module, a microscopic traffic simulation module and a data collection and fusion module. The mid-scopic traffic simulation module is connected with the macroscopic traffic simulation module; the microscopic traffic simulation module is connected with the mid-scopic traffic simulation module; and the data collection and fusion module is respectively connected with the macroscopic traffic simulation module, the mid-scopic traffic simulation module and the microscopic traffic simulation module. According to the invention, on the basis of independent simulation of macroscopic, mid-scopic and microscopic traffic simulation platforms, interaction utilization of all layers of simulation systems and various simulation platform data is realized; traffic operation states of traffic flows and pedestrian flows large-scale activities can be comprehensively simulated; therefore, a technological basis can be provided for formulation of various traffic decision schemes of large-scale activities.
Owner:广州市交通规划研究所 +1

Diagnosis and treatment decision-making support system

InactiveCN107591201AImprove decision-makingReduce the rate of misdiagnosis and mistreatmentMedical communicationMedical automated diagnosisDiseaseDecision scheme
The invention discloses a diagnosis and treatment decision-making support system. The system includes a human-computer interaction unit, a processing unit, a decision-making support unit and a database unit, wherein the human-computer interaction unit is used for a user to exchange data with the diagnosis and treatment decision-making support system, the processing unit is connected with the human-machine interaction unit and is used for performing business and data processing, the decision-making support unit is connected with the processing unit and is used for feeding back decision-making schemes according to input data, and the database unit is used for storing medical treatment data to provide a data foundation for the decision-making support unit. The system of the invention can maximally conform to actual clinical diagnosis and treatment processes and provide full-process diagnosis and treatment decision-making services for doctors. With the diagnosis and treatment decision-making support system of the invention adopted, diagnosis and treatment schemes and suggestions can be provided for doctors; the doctors can be assisted to improve decision-making levels; the doctors canbe prompted with potential errors; diagnostic suggestions and decision-making schemes can be provided according to the disease conditions of specific patients, so that the doctors can be assisted to comprehensively understand a wide range of possibilities; the doctors can be assisted to make better decisions, so that a misdiagnosis rate can be reduced; and the system can be combined with the actual diagnosis and treatment processes, so that the actual diagnosis and treatment processes can be standardized.
Owner:CHONGQING INST OF GREEN & INTELLIGENT TECH CHINESE ACADEMY OF SCI

Melon growth management expert system based on Internet of Things

ActiveCN107944596AForecast revisionRealize weather disaster warningForecastingResourcesDecision schemeSystems management
The invention provides a melon growth management expert system based on the Internet of Things. The melon growth management expert system comprises a main interface module, an expert knowledge base module, a monitoring information module, a growth simulation and prediction module, a decision-making and inference module, an expert consultation module, a personal information module and a backgroundmaintenance module. The melon growth management expert system manages melon real-time growth environment monitoring, growth status monitoring, water and fertilizer amount and environmental temperatureearly-warning as well as pest and disease damage judgment combined with an image recognition technology, realizes melon growth and development simulation and yield quality prediction, and is equippedwith a planting knowledge base and an expert online question answering function. The melon growth management expert system realizes real-time monitoring of environment and plant growth information, is conductive to planting decision-making, reminds the user to improve the management conditions through real-time water and fertilizer amount and environmental temperature early-warning, realizes high-precision simulation of plant growth indexes, fruit quality and yield, and provides real-time water and fertilizer precise decision-making scheme according to comprehensive analysis of real-time environment and plant growth monitoring, data processing based on a machine learning method, plant growth model prediction and the like.
Owner:SHANGHAI JIAO TONG UNIV

Particle swarm optimization method for air combat decision

InactiveCN101908097AGood air combat decisionsAddress inherent shortcomingsBiological neural network modelsSpecial data processing applicationsDecision schemeEmpirical formula
The invention discloses a particle swarm optimization method for an air combat decision, comprising the following steps of: firstly, acquiring the current situation of a battlefield from a command control center; secondly, acquiring a threat factor among aircrafts according to the current situation of the battlefield; thirdly, setting the particle swarm scale and the maximum iterations of the particle swarm; fourthly, initializing all particles of the particle swarm; fifthly, acquiring the threat degree of an enemy party on a first party after weapon attacks of the first part according to an empirical formula; sixthly, constructing a BP (Back Propagation) neural network; seventhly, updating the historical optimal position of the particle swarm and the individual historical optimal position of the particles; eighthly, continuously searching an air combat decision scheme until the maximum iterations of the particle swarm are achieved; and ninthly, determining the historical optimal position coordinate of the particle swarm as the obtained air combat decision. By processing the input and the output of the BP neural network, the decision method can move in a set solution space and has favorable search capability on the optimal solution.
Owner:BEIHANG UNIV

Urban IoT (Internet of Things) information classification processing system and method

The invention relates to an information classification processing system and method based on an urban IoT (Internet of Things), particularly relates to an information classification processing, prediction, decision and automatic learning method, and belongs to the technical field of IoT information processing. The system comprises a sensing layer, a data transmission layer, a data filtering layer,an information definition layer, an information processing layer, a decision supporting layer, a network layer and a decision tree autognosis method based on a self-built database; real-time sensed data is output at regular time by the data transmission layer; and the decision supporting layer carries out analysis statistics according to information uploaded by the information processing layer, combines instant information to carry out comparison with historical information, predicts future information which cannot be obtained in real time by a sensor and event trends, calculates an occurrence probability of an event along with a master variable at a future time point, makes a plurality of suggestion decision schemes, selects an optimal scheme to execute, collects process information andresult information and establishes a decision tree model, and after repeated optimization, the system automatically learns and carries out cognition, so that a decision is gradually made by the system.
Owner:重庆光电信息研究院有限公司

Computing task unloading method and device and computer readable storage medium

InactiveCN110418356AAdaptable to changing needsData switching networksNetwork planningDecision schemeDecision maker
The embodiment of the invention discloses a computing task unloading method and device and a computer readable storage medium. The method includes: respectively calculating the communication time forthe user terminal to unload the calculation task, the task execution time for the user terminal to unload the energy consumption to execute the local calculation task and the task execution time for the local execution energy consumption mobile edge calculation MEC server to execute the unloaded calculation task in the mobile edge calculation environment based on the average energy consumption ofthe user and calculating an average response delay based on the sum of the tasks; establishing a multi-objective optimization model for the average energy consumption of the user and the average response delay of the task; and solving the multi-objective optimization model to obtain a plurality of satisfactory calculation unloading decision schemes. According to the method, the calculation task unloading problem is converted into the multi-objective optimization problem and then solved, a plurality of satisfactory unloading decision schemes are obtained, a decision maker can have more choicesin a rapidly changing network environment, and the method is more favorable for adapting to the requirement of changing at any time.
Owner:SHENZHEN UNIV

Multiple target comprehensive decision evaluation method based on scene

A multiple target comprehensive decision evaluation method based on a scene comprises steps of establishing decision schemes of various scenes for the actual problem, and establishing a target set and a an evaluation set; determining the base weighing of evaluations; distinguishing uncertainty factors of objective aspects and subjective aspects, which influence evaluation weighing coefficients, and regarding uncertainty factors as main control factors adjusting weighing of evaluations; according to the actual application environment and different decision evaluation targets, determining weighing coefficients of evaluations of all main control factors and relative important weighing coefficients which are occupied by the base weighing and all main control factors during evaluation; calculating comprehensive weighing coefficients of all evaluations; and reducing the overlapping information among data through a comprehensive evaluation method of integrated comprehensive weighing and main component projection, and comprehensively evaluating the multiple target decision. By the aid of the method, the information of evaluations can be considered comprehensively, the information of evaluations is complementary, and the accuracy of evaluation results is improved.
Owner:UNIVERSITY OF CHINESE ACADEMY OF SCIENCES +1

Distribution network blocking theory based power grid optimized operation method

ActiveCN104124686AReduce network loss percentageImprove economyAc network circuit arrangementsDecision schemePower grid
The invention relates to a distribution network blocking theory based power grid optimized operation method. The distribution network blocking theory based power grid optimized operation method is characterized by including the steps: numbering each node and each switch in a distribution network according to practical situations of a power grid and forming an initial number scheme; putting forward a 'distribution network blocking' theory and blocking the network on the basis so as to obtain a comprehensive information database of the distribution network; generating an alternative topological scheme set; subjecting generated schemes to feasibility check; subjecting blocked equivalent networks to data preprocessing; computing comprehensive evaluation indexes to comprehensively evaluate a reconstructed scheme, putting forward technical indexes to quantify reliability and economy of specific partitions, proposing a loss reducing decision scheme aiming at a typical section on account of the distribution network in operation, and providing relevant decision bases for scheduling operation. The distribution network blocking theory based power grid optimized operation method has the advantages of scientificity, reasonability, high reliability, good economy, high practicality and the like.
Owner:STATE GRID CORP OF CHINA +1

Method for generating plan based on cognitive model

InactiveCN101826184AComprehensive and effective contextual integrationImprove accuracyData processing applicationsDecision schemeDecision maker
The invention belongs to the technical field of emergency plan management and relates to a method for generating a plan based on a cognitive model. The method comprises the following steps of: inputting a bound variable by a decision maker, and calculating the level of the emergency by a system; performing characteristics matching in a case and plan base; if the matching is successful, outputting action sequences in a corresponding plan and a corresponding case, and judging the validity according to a situation; if the matching fails, returning to an initial state; if the generated initial plan decision scheme needs adjusting, performing re-matching on the case and the plan; and if the generated initial plan decision scheme does not need adjusting, obtaining a target plan decision scheme. Due to the adoption of the cognitive model and the plan CSP matching algorithm, the method has higher accuracy and real-time characteristic, and provides effective situation integration information and decision-making information for the decision maker by using the high-performance calculation power of a computer; and simultaneously, the high cognition of the decision maker on the field is fully utilized, and a comprehensive emergency plan is repeatedly studied under the intervention of the decision maker, so higher reality usability is achieved.
Owner:TIANJIN UNIV

Intelligent scheduling decision-making method for flood and drought control based on extreme climate condition

The invention discloses an intelligent scheduling decision-making method for flood and drought control based on extreme climate conditions. The intelligent scheduling decision-making method is used inriverside areas and comprises the steps of: step 1) acquiring and collecting various kinds of original data; step 2) preliminarily establishing a virtual reservoir model; step 3) optimizing the virtual reservoir model; step 4) and utilizing a final data model obtained in the step 3) to output various kinds of data to sub-functional modules, thereby achieving the intelligent scheduling decision-making purpose for flood and drought control in the riverside areas under extreme climate conditions. The intelligent scheduling decision-making method can ensure scientificity, precision and reliability of the data, achieves the effects expert early-warning support and decision scheme analysis, can timely respond to the sudden rainstorm process, and immediately starts up a pumping station drainage,not only reduces the water accumulating volume, but also greatly reduce the full-load working process of the pumping station, saves energy and reduces emission, effectively improves the early-warningand handling capacity of flood and drought control in the riverside areas, promotes the improvement of integral level of water resource scheduling management, and has extremely high practicability.
Owner:江苏鸿利智能科技股份有限公司

Reconfigurable assembly line multi-target scheduling decision method

The invention discloses a reconfigurable assembly line multi-target scheduling decision method. The method is characterized by comprising the following steps: 1) constructing an index feature value matrix of a reconfigurable assembly line multi-target scheduling decision; 2) constructing a standardized decision matrix of the reconfigurable assembly line multi-target scheduling decision; 3) computing a grey relational coefficient of a desired reference vector; 4) computing an objective weight through entropy; 5) computing a subjective weight through an AHP (analytic hierarchy process); 6) constructing a non-linear target programming model to compute the combined weight of the objective weight obtained in the step 4) and the subjective weight obtained in the step 5); 7) computing a desired reference vector relevancy according to the combined weight obtained in the step 6) and the grey relevancy coefficient obtained in the step 3); 8) making out the approach degree of a constructed vector and a positive desired reference vector according to the desired reference vector relevancy obtained in the step 7) and the standardized decision matrix obtained in the step 2); 9) selecting a decision scheme with the maximal approach degree as the optimal decision scheme. By using the approach degree as the judgment basis of the decision scheme, the evaluation result is more reliable and credible.
Owner:HOHAI UNIV CHANGZHOU

Method for optimizing and determining disaster-reduction decision scheme

InactiveCN102110250AQuick and comprehensive generationMethod scienceResourcesDecision schemeElectricity
The invention discloses a method for optimizing and determining a disaster-reduction decision scheme, which comprises a server, a database built therein, and a data processing module established for performing operation by using a central processing unit of the server and receiving and outputting data through a terminal connected with the server electrically. Particularly, the database includes an optimization model base providing an optimized reference scheme for a disaster-reduction decision and a scheme and disaster situation information database providing assistant correction information and data for the reference scheme so as to generate the final decision scheme; and the data processing module includes a decision scheme optimizing module, a decision scheme determining module and a decision scheme output module, which are used for generating the optimized reference scheme with a formative requirement of materials, the distribution of the materials and an order of recovery and reconstruction projects, generating the final decision scheme, sending the final decision scheme to a historic case base in the scheme and disaster situation information database in a required mode, and outputting the final decision scheme by the terminal. The method for optimizing and determining the disaster-reduction decision scheme can provide the determined disaster-reduction decision scheme after natural disasters of all kinds occur.
Owner:HEFEI INSTITUTES OF PHYSICAL SCIENCE - CHINESE ACAD OF SCI

Wide-range power transmission line forest fire emergency disposal optimization intelligent decision making method

InactiveCN103942458AEnhancing Wildfire Disposal CapabilitiesSpecial data processing applicationsICT adaptationDecision schemePower grid
The invention discloses a wide-range power transmission line forest fire emergency disposal optimization intelligent decision making method. The wide-range power transmission line forest fire emergency disposal optimization intelligent decision making method comprises the following steps of 1 obtaining power transmission line warning forest fire point data; 2 calculating a distance between a fire point and a nearby pole tower; 3 predicting the dangerousness degree of the fire point; 4 sequentially arranging extinguishment; 5 searching reserved data of extinguishment facilities; 6 generating a plurality of extinguishment emergency disposal decision schemes; 7 selecting an optimal emergency disposal decision scheme from the extinguishment emergency disposal decision schemes generated in the step 6, namely a wide-range power transmission line forest fire optimal emergency disposal intelligent decision scheme. The method had the advantages that limited extinguishment teams and materials can be utilized to the most degree so as to achieve optimal power transmission line forest fire disposal efficiency and benefit; advanced deployment can be guided, the forest fire disposal capacity of a power grid can be improved.
Owner:STATE GRID CORP OF CHINA +2

Wireless sensor routing algorithm based on fuzzy multi-attribute decision

The invention discloses a wireless sensor routing algorithm based on the fuzzy multi-attribute decision. The method comprises the following steps that (1) communicable nodes around the current node are created as decision schemes by starting from a source node; (2) the fuzzy attributes of the decision schemes in the step (1) are determined, and a fuzzy evaluation matrix X is established; (3) standardized processing is performed according to the fuzzy evaluation matrix so that a standardized fuzzy decision matrix H is obtained and the objective weight is determined by using the H; and the subjective weight is determined according to the preference in the fuzzy evaluation matrix; (4) the combination weight is determined by using the objective weight and the subjective weight of the previous step; (5) the combination weight is combined with the fuzzy decision matrix so as to calculate a comprehensive evaluation value, the optimal point is selected to act as a next jump node and set as the current node; and (6) whether the node belongs to a sink node is judged, and the algorithm is ended if the node belongs to the sink node; or the process returns to the step (1) for repetition if the node does not belong to the sink node. According to the technical scheme, the more stable, reliable, scientific and objective fuzzy multi-attribute wireless sensor routing algorithm can be obtained.
Owner:宁波深路信息科技有限公司

Interval intuitionistic fuzzy multi-attribute decision making method based on improved entropy and score function

InactiveCN109146184ASolve some problems in selecting suppliersMake up for the problem of sorting failureForecastingResourcesDecision schemeMultiple attribute
The invention belongs to the field of multi-attribute decision making, and discloses a method and system for interval intuitionistic fuzzy multiple attribute decision-making base on improved entropy and score function. Aiming at the popular problem of supplier selection, the fuzzy entropy of uncertainty and hesitation is used to determine the weight of each index under the condition that the weight of supplier attribute is completely unknown, and the objective weighting method is used to correct the deviation caused by the agent preference. The new score function is used to sort the scheme set, and the final supplier selection scheme is obtained. The invention utilizes an improved method to calculate the attribute weight according to the contribution degree of the attribute to the decisionscheme. In view of the limitation of the existing score function, a new score function is proposed. The weight of the attribute is correctly and reasonably calculated, and the score function makes upthe problem the other sorting functions fail to sort certain interval numbers to a certain extent. When the invention selects suppliers for enterprises, the invention provides a more objective and reasonable method.
Owner:CHENGDU UNIV OF INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products