Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

223 results about "Construction planning" patented technology

Project management method, platform and device, computer equipment and storage medium

The invention relates to a project management method, platform and device, computer equipment and a storage medium. The method comprises the following steps: enabling a server to obtain map information of the engineering project according to the obtained map information of the engineering project and a total construction period plan; obtaining a building information BIM model and a construction plan of the sub-project; generating a target construction organization corresponding to the engineering project including the personnel information, the material information and the equipment information; and according to the target construction organization, obtaining a corresponding dispatch list, sending the dispatch list to the corresponding construction party equipment, receiving feedback information of the dispatch list sent by the construction party equipment, and completing quality acceptance of the engineering project according to the feedback information of the dispatch list. Accordingto the method, the legality of engineering construction is restrained through the dispatch list, the risk of safety production is reduced, the control of the server on the whole construction period target is realized, a collaborative environment is provided for BIM application corresponding to a total engineering project through the 4D information model with a compatible data integration interface, and the problem of information isolated island is avoided.
Owner:中铁建华南建设有限公司 +1

PEPSO-basedsiting and sizing method optimization method of distribution type power supply

The invention discloses a PEPSO-basedsiting and sizing method optimization method of a distribution type power supplyand belongs to the field of electric systems. The method is rapid, precise, effective and proper and is mainly provided for planning optimization of a power distribution network including a distribution type power supply. The objective is to determine an optimal access position and the capacity of the distribution type power supply. The technological means include capacity expanding of a transformer substation, circuit transformation upgrading and new accessing of the distribution power supply. The method is advantageous in that a complete multi-target optimization teaching model is established; the model covers multiple aspects of actors such as economic performance, reliability and environment protection; optimization seeking calculation is carried out based on a novel improved multi-target particle group algorithm PEPSO; a construction planning scheme is determined via the fuzzy decision technology; and power grid auxiliary analysis programs are compiles and planned based on the method, and the optimization seeking calculation is carried out, so a feasible scheme set is formed and an optimal scheme is determined.
Owner:STATE GRID HEBEI ELECTRIC POWER RES INST +2

Construction planning management system based on BIM+GIS

The invention discloses a construction planning management system based on BIM+GIS, and the system builds a new project bidding file which is automatically matched with an enterprise BIM family library, carries out the matching and screening of a BIM family library needing to be supplemented, and forms a new project-level BIM family library through the secondary expansion of the family library. And the new project bidding file is matched with an existing GIS platform, a region range where the newly-built project is located is screened and delimited, and project-level GIS bottom-layer three-dimensional information data is formed through existing GIS data with different precisions. The construction organization quickly creates a module block, and quickly extracts a BIM model and GIS three-dimensional terrain to complete site arrangement, temporary road arrangement, project department residence arrangement and large temporary facility arrangement on the basis of a project-level BIM familylibrary, a project-level GIS module and an optimized project resource configuration file. The construction organization simulation optimization module is fast, the progress plan and the cost are associated with the BIM+GIS model, the optimal construction scheme is automatically selected through data analysis, and the field construction condition is dynamically optimized.
Owner:CHINA RAILWAY 18TH BUREAU GRP CO LTD

Construction safety monitoring method and system based on unmanned aerial vehicle

The invention discloses a construction safety monitoring method and system based on an unmanned aerial vehicle. The method includes the following steps: acquiring data of construction planning data and data of current construction progress; generating a first flight path of the unmanned aerial vehicle and several data acquisition points; sending a first control command to the unmanned aerial vehicle to make the unmanned aerial vehicle fly according to the first flight path and acquire data at all data acquisition points; receiving a first image taken by the unmanned aerial vehicle at each dataacquisition point; identifying a guardrail from the first image taken by the unmanned aerial vehicle at each data acquisition point, and then judging whether the guardrail of each data acquisition point is set correctly; and if any guardrail is not set correctly, generating a warning message. The construction safety monitoring method and system can replace manual inspection and save human resources. In the meanwhile, inspection cycles are shortened largely, and safety hazards can be reflected timely. The construction safety monitoring method and system can be widely used in safety monitoringtechnology.
Owner:广东强雄建设集团有限公司

BIM technology-based railway large-span continuous beam swivel construction management and control method

The invention, which belongs to the field of railway large-span continuous beam swivel informatization management, discloses a BIM-technology-based railway large-span continuous beam swivel construction management and control method, thereby solving a problem that fine management of bridge swivel site construction is difficult at present. And the comprehensive management comprises electronic sandtable on-site live-action viewing and comprehensive management three-dimensional visualization technology disclosure. Technical management comprises electronic sand table on-site live-action check, three-dimensional visualization technical disclosure and collision check. The progress management compares and analyzes the actual progress and the planned progress according to the compiled construction progress plan, and automatically calculates the lag construction period. And the cost management directly carries out statistics on the number of generated projects by using a built model. And the safety management is used for monitoring a swivel beam bracket and establishing association between a BIM model and equipment to form an information base of safety quality management. The method has advantages of assisting managers in effective decision making and fine management, and ensuring manageability and controllability of management factors such as construction plans, progress and quality.
Owner:CHINA RAILWAY 19TH BUREAU GRP 1ST ENG +1

A system and a method for accurately identifying a target and measuring and calculating an effect in an ecological sponge-type city construction suitable area

The invention discloses a system and a method for precisely identifying a target and calculating an effect in an ecological sponge type urban construction suitable area. The system comprises a spatialdata acquisition module, a suitable area spatial identification module, an index control and measure design module and a construction effect calculation module. The method is used for sponge city construction from city construction planning to engineering design whole process. Accurate identification of construction and reconstruction target suitable areas and suitable grade targets in urban heatisland control and urban landscaping processes can be realized, and the effects of flood disasters and high-temperature extreme climate events under different urban construction and reconstruction scenarios can be measured and calculated. The system comprises a novel sponge city and heat island control dual-target city planning and design framework, achieves refined remote sensing classificationand artificial intelligence detection algorithm aiming at precise identification of the ecological sponge city space suitability, and can effectively simulate the effects of city construction and reconstruction on rain flood and extreme high temperature events.
Owner:INST OF GEOGRAPHICAL SCI & NATURAL RESOURCE RES CAS

Method for collocation optimization and operation control of controlled phase shifters

The invention discloses a method for the configuration optimization and the operation control of controlled phase shifters, and relates to a method for construction planning and the operation control thereof for alternating current main lines or alternating current distribution network, particularly to a method for the configuration optimization and the operation control of the controlled phase shifters for an ultrahigh voltage power transmission network based on improving the fracture surface conveying ability of the power network. The method comprises the following steps: obtaining node data of the fracture surface of the power network and planning configuration number of the controlled phase shifters, and building the node power balance equations of power systems of the controlled phase shifters; building an optimal tidal current mathematical model stated by solving; determining the optimal configuration state of the controlled phase shifters according to the configuration states of the controlled phase shifters when the transmission capacity of the comprehensive fracture surface is greatest; adjusting the operation mode and the phase shifting angle of each controlled phase shifter according to an operation control parameter list. Through configuration optimization and the operation control of the controlled phase shifters, the method enables the fracture surface conveying ability of the power network to be nearly improved to the theoretical thermal stability limit of the fracture surface.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Collaborative dynamic prediction method for overlying strata and surface subsidence induced by coal mining

The invention relates to a collaborative dynamic prediction method for overlying strata and surface subsidence induced by coal mining. The method comprises the following five steps: mining area working face geological parameter acquisition, prediction parameter determination based on a probability integral method, determination of a time sequence time function model based on an actually measured maximum sinking point, final surface movement deformation, dynamic prediction and final overlying strata internal movement deformation, dynamic prediction and the like. On one hand, the system is simple in construction structure, convenient in data acquisition and high in efficiency and precision, and can effectively improve accurate and continuous prediction of various complex deformation data ofoverlying strata in an underground resource extraction mining area; on the other hand, the efficient data calculation capability is realized; the prediction precision of the overlying strata in the underground resource extraction mining area is improved; in addition, the overlying strata deformation and settlement trend at any position in the range of the mining area can be accurately pre-judged according to existing data, the monitoring precision and efficiency of mining area settlement operation are improved, and meanwhile a reliable reference basis can be provided for mining area construction planning and mining area follow-up repair and utilization.
Owner:HENAN POLYTECHNIC UNIV

Sponge city construction underlying surface nested remote sensing refined drawing method

The invention discloses an underlying surface nested remote sensing refined drawing method for sponge city construction. 'low influence degree development 'is introduced; The invention discloses an advanced idea of a sponge city, a grade nested classification method and the like. The invention provides a novel remote sensing refined drawing technology which is suitable for sponge city constructionand is supported by an urban surface multi-source data integrated grade scale nested classification system. Sponge city construction planning, design and engineering implementation application objectives are developed, and the key technology and the multi-level proportional scale drawing and visualization method for extracting the surface water permeability, the relative slope information, the population density level and the urban function division multi-attribute information of the'pattern spot entity 'are integrated. The system can realize an intelligent calculation and statistical mappingmethod for sponge city construction target identification. The method has the advantages of being low in cost, high in classification precision and high in applicability, and the target application requirements for sponge city construction, landscape garden planning, ecological environment protection and the like are better met.
Owner:INST OF GEOGRAPHICAL SCI & NATURAL RESOURCE RES CAS

Operation method based on a roadbed filling intelligent command system and system thereof

The invention discloses an operation method based on a roadbed filling intelligent command system and system thereof. The method comprises the following processes of construction preparation, construction planning, filling operation, paving and leveling operation, unmanned rolling operation of a road roller, slope finishing operation and quality acceptance. According to the method, with an intelligent roadbed filling command system as a core, theoretics and technologies of BIM, big data, Beidou positioning, automatic control, informatization detection, Internet of Things and the like are comprehensively applied to achieve dynamic management, automatic paving guidance, automatic fine leveling control, unmanned rolling compaction and automatic slope finishing guidance of filler transportation under unified scheduling of a command system, so that continuous detection of roadbed compaction quality, filler grading and automatic detection of moisture content are realized, and a novel digitaland intelligent high-speed railway roadbed filling technology is formed; the roadbed filling quality is effectively guaranteed, the operation efficiency is improved, and the traditional operation mode of roadbed construction is changed.
Owner:RAILWAY ENG RES INST CHINA ACADEMY OF RAILWAY SCI +3

Construction safety management system and method based on building information model

A construction safety management method based on a building information model comprises the steps that construction plan data input by a user are received, and the building information model is established according to the construction plan data; danger source data is generated, wherein the danger source data comprises the position of a danger source in a construction site and the type of the danger source; determining a virtual position corresponding to the position of each danger source in the construction site in the building information model, and generating a first identifier at the virtual position by adopting a display mode corresponding to the type of the danger source; receiving monitoring data, transmitted by the monitoring module, of a dangerous source located on a constructionsite, and judging whether the dangerous source is in a dangerous state or not according to the monitoring data; and if the dangerous source is in the dangerous state, replacing a first identifier corresponding to the dangerous source in the building information model with a second identifier, the second identifier being different from the first identifier. The construction safety management systemcan visually monitor the danger source in real time and provide the danger source information in time.
Owner:深圳云联万企科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products