Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

705 results about "Construction scheduling" patented technology

BIM-based track engineering construction progress information management method

The invention discloses a BIM-based track engineering construction progress information management method. The method comprises the following steps: S1, establishing a three-dimensional simulation model of a to-be-constructed track construction based on BIM (Building Information Modeling); S2, establishing primitive information links for a construction progress plan and the three-dimensional simulation model in the S1, integrating time dimensions and forming a 4D progress visualization model; S3, applying the 4D progress visualization model to dynamic monitoring of the to-be-constructed trackconstruction, and comparing the actual construction progress and quality with the 4D progress visualization model to confirm consistency; if the actual construction progress and quality with the 4D progress visualization model are not consistent, carrying out S4: analyzing reasons of construction progress delays or poor quality; if the actual construction progress and quality with the 4D progressvisualization model are consistent, continuing S5: performing dynamic monitoring on each stage of the to-be-constructed track construction until the construction is completed. The method has the following advantages: the construction progress, related resources, the construction quality, site arrangement or the like can be comprehensively taken into consideration, plans can be formulated reasonably, resource utilization can be optimized, better dynamic monitoring and management of the whole construction progress can be realized, closed-loop feedback can be realized, and the efficiency can be improved.
Owner:重庆工业赋能创新中心有限公司

BIM simulation and aerial photography combined construction management and control method and system

The invention discloses a BIM simulation and aerial photography combined construction management and control method and system. The method comprises the following steps of outputting a BIM three-dimensional model of a building; according to demands for information acquisition, selecting a characteristic coordinate point needed to be tracked and recorded in advance on the BIM three-dimensional model; an unmanned aerial vehicle arriving at the corresponding position matched with the selected characteristic coordinate point of the entity building, collecting entity engineering characteristic information, and sending the collected entity engineering characteristic information to a monitoring computer; establishing an entity three-dimensional model on the monitoring computer with the entity engineering characteristic information of the same positioning coordinate point which is sent to the monitoring computer by the unmanned aerial vehicle; matching, associating and comparing the entity three-dimensional model with the BIM three-dimensional model of the same characteristic coordinate point in one-to-one manner, automatically finding "matched" and "unmatched" items of the both models, and outputting a project completion comparison report. The system and the method can timely, conveniently and accurately master the construction progress and the construction effect of the building entity, the construction progress can be integrally regulated and controlled conveniently, the construction period is shortened, and the profit is improved.
Owner:SHENZHEN GRANDLAND DECORATION GROUP

Construction expert information system applicable to extra-large underground cavern group

The invention relates to a construction expert information system applicable to an extra-large underground cavern group. The system comprises a data information acquisition and wireless transmission platform and five main subsystems, wherein the data information acquisition and wireless transmission platform is a construction information acquisition and wireless transmission platform based on the Internet of Things, the five systems include the information collecting and processing subsystem, the construction progress visualization and real-time control subsystem, the construction real-time simulation and feedback subsystem, the early warning, forecasting and decision supporting subsystem and the extra-large underground cavern group construction site information management system based on B/S architecture. The construction expert information system has the functions in the aspects of construction information collection, construction progress organization and management, construction monitoring, construction safety control, construction early warning and emergency decisions for construction safety of the extra-large underground cavern group, and the complex, changeable and uncertain construction environmental conditions of underground engineering can be met; construction progress and construction safety of underground caverns can be dynamically analyzed, predicted and displayed, and powerful analysis tools and technical supports can be provided for progress control and construction safety management decisions of the underground cavern group.
Owner:SINOHYDRO BUREAU 14 CO LTD +8

Three-dimensional environment model reconfiguration method, equipment and system based on image recognition

ActiveCN107247834AImprove accuracyClearly know the progress of the construction siteGeometric CADImage analysisStereo matchingBack projection
The invention discloses a three-dimensional environment model reconfiguration method, equipment and system based on image recognition. The method comprises the following steps: extracting and matching feature points, and carrying out back projection by using the feature points to obtain pixel information; and carrying out stereo matching and iterative updating according to the pixel information. The accuracy of reconfiguration of a three-dimensional scene is improved; and visual and accurate reference is provided for follow-up construction management. The equipment runs on the basis of the method, in a whole construction process, modeling is implemented in real time by computer vision three-dimensional reconfiguration, and a construction scene is recovered visually and clearly. According to the system, images are acquired through a helmet, a camera is arranged on the helmet, terminal equipment is arranged on the background, and project management personnel who do not need to enter a construction site can clearly know the construction process of the site. By the management personnel, a three-dimensional reconfiguration model can be compared with an expected planning model of an expected construction process in BIM in real time, deviation in implementation is discovered in time, and the management efficiency is greatly improved.
Owner:HUAZHONG UNIV OF SCI & TECH

System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model

The invention discloses a system and a method for managing railway bridge construction progress based on a 3DGIS (Three-dimensional Geographic Information System) and an engineering three-dimensional model. The system comprises a user management module, an actual progress data collecting module, a construction and organization plan module, a three-dimensional image progress display module, a statistic analysis module, a progress early-warning module and a log record module, wherein the actual progress data collecting module has the functions of data filling and reporting, data auditing and storing; the construction and organization plan module is used for making and inputting a work point construction and organization plan; the three-dimensional image display module has the functions of three-dimensional image leading-in, bridge work point model leading-in, three-dimensional navigating and progress display; the statistic analysis module is used for carrying out statistic analysis on progress data and outputting a statistical form; the progress early-warning module has the functions of early-warning personnel allocation and short message reminding; the log record module is capable of recording user login information, progress filling and reporting information and audit information in real time. According to the system and the method, disclosed by the invention, refined and three-dimensional visual management of railway bridge construction progress can be realized.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

{0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof

The invention relates to an auxiliary management system for subway integrated pipeline construction. The system comprises a user management module, a three-dimensional management module, a construction management module and a logging module, wherein the user management module comprises user login authentication and logging off function; the three-dimensional management module comprises scene import, three-dimensional roaming, layer management, legend management and navigation functions; the construction management module comprises basic information management, pipeline modification management, spatial analysis, pipeline collision detection, process coordination, construction schedule management functions; and the logging module can record information on user operation on pipelines in real time. The auxiliary management system for subway integrated pipeline construction provided by the invention has the beneficial effect that three-dimensional visualization of construction process management is realized, so that construction schedule is more visual, and the representation of construction management effect is enhanced, and rework in pipeline construction process is effectively avoided; and through spatial analysis and pipeline collision detection means, the problem of spatial collision between professional pipelines can be effectively solved, and the smooth progress of projects is ensured.
Owner:XIAN UNIV OF TECH

Engineering construction multi-dimensional dynamic information fusion and cooperation interactive system

The invention discloses an engineering construction multi-dimensional dynamic information fusion and cooperation interactive system, comprising a professional system, a data management system, a progress management system, a positioning system, a monitoring system, a BIMVR system, a communication system and a construction system. The professional system, the data management system and the BIMVR system are combined to built a simulation engineering model and actual construction site scenes and the simulation engineering three-dimensional model are combined to achieve data interaction, thus, real-time data acquisition and interaction between software and hardware equipment under control of the software are both achieved. A non-linear management mode is utilized to manage construction progress, last-minute changes of progresses can be adjusted in any time, and progress management is much flexible and convenient. A block chain technique is utilized for data management, particularly, multi-point mesh block structure is built through the block chain technique, all terminals participates recording of a database, and thus, safety and flexibility in use of the whole system is guaranteed effectively.
Owner:武汉八维时空信息技术股份有限公司

Intelligent large-scale shield tunnel management system based on BIM and AI

InactiveCN106897813AEasy to visualize managementEasy to monitorResourcesInformation repositoryState of art
The invention relates to an intelligent large-scale shield tunnel management system based on BIM and AI. The system comprises a time management subsystem used for regulating and managing the construction process and construction matters, a BIM management subsystem used for planning and managing the space position of materials and equipment and mobilisation & demobilisation, and an AI intelligent subsystem used for predicting resources needed by future construction and optimizing resource configuration in advance according to learning about known engineering. Compared with the prior art, the system is advantaged in that the time is the main line, the integral construction process is regulated and managed, and man-machine-material regulation is carried out; the space is the support, the BIM management subsystem is used for planning and managing the space position of the materials and the equipment and mobilisation & demobilisation; data is taken as the root, an engineering information database is managed and is taken as learning resources of the AI intelligent subsystem, an intelligentization level is improved continuously, the three are mutually independent and are associated through the data, visual management and monitoring on the tunnel shield construction process are facilitated, and construction experience references for subsequent engineering are facilitated.
Owner:TONGJI UNIV

Three-dimensional live-action modeling method based on aerial survey of unmanned aerial vehicle

The invention discloses a three-dimensional real scene modeling method based on aerial survey of an unmanned aerial vehicle. The three-dimensional live-action modeling method based on aerial survey ofthe unmanned aerial vehicle comprises the following steps that 1, three-dimensional live-action modeling is carried out, aerial survey data are obtained through aerial survey of an unmanned aerial vehicle, image analysis is conducted through an aerial triangular analysis method, a series of two-dimensional aerial images are converted into three-dimensional dense point clouds of the to-be-measuredconstructional engineering, then data post-processing is conducted, a digital line drawing map and a digital surface model of the to-be-measured constructional engineering are obtained, and a live-action three-dimensional model is obtained; performing live-action patrol of the to-be-tested constructional engineering based on the live-action three-dimensional model and real surface point cloud toobtain construction execution data of the to-be-tested constructional engineering; and based on comparison of the three-dimensional planning design and construction execution data of the to-be-testedconstructional engineering, researching and issuing a construction scheduling instruction, and checking and correcting the execution effect of the scheduling instruction. The three-dimensional real scene modeling method based on aerial survey of the unmanned aerial vehicle is high in efficiency and low in cost.
Owner:THE SIXTH CONSTR CO LTD OF CHINA NAT CHEM ENG

Monitoring method and system based on BIM (building information module) three-dimensional model and intelligent safety helmet

The invention discloses a monitoring method based on BIM (building information module) three-dimensional model and intelligent safety helmet; the monitoring method comprises the steps of outputting a BIM three-dimensional model of a building by means of BIM three-dimensional modeling technology; pre-selecting characteristic coordinate points, to be tracked and recorded, on the BIM three-dimensional model; wearing the intelligent safety helmet, arriving at the real building to collect real engineering characteristic information from the selected characteristic coordinate points, and transmitting the real engineering characteristic information back to a monitor computer; screening the real engineering characteristic information transmitted in the step III to the monitor computer, and correlating the screened information with the corresponding characteristic coordinate points in the BIM three-dimensional model in one-to-one correspondence; opening symbols or parameters representing the characteristic coordinate points to be checked, and comparing BIM three-dimensional model and real engineering characteristic information for the characteristic coordinate points at different moments of time, and judging construction progress and construction quality for each characteristic coordinate point. The invention also discloses a monitoring system based on BIM three-dimensional model and intelligent safety helmet.
Owner:SHENZHEN GRANDLAND DECORATION GROUP

A construction method based on R-N5DL-BIM technology

PendingCN109190252AGuaranteed link 0 errorGuaranteed application guidanceGeometric CADSpecial data processing applicationsAnimationMaterials processing
A construction method based on R-N5DL-BIM technology belongs to the technical field of the construction method. The method includes: the construction of three-dimensional model of the building and comprehensive equipment collision inspection: the overall arrangement of construction progress and construction animation simulation; 5D construction dynamic simulation, analysis and optimization: material management and cost management of construction project effective control; material processing optimization of 3D model of construction site, visual animation display of simulation effect; The modelof construction organization system under different environment is established by this method, and the dynamic relationship among schedule, cost and construction flow process factors is considered comprehensively, so that the complexity, uncertainty and randomness in construction can be expressed more accurately, and the intuitionism, feasibility and scientificity of construction organization system can be enhanced. The invention provides accurate engineering information for the construction scheme establishment, maintenance and three-dimensional visual simulation effect experience of the project, and predicts and avoids unnecessary construction problems in the construction.
Owner:北京比目鱼信息科技有限责任公司

BIM-based informatization quality management method and system

The invention discloses a BIM-based informatization quality management method and system, and belongs to the field of quality management platforms. In order to solve the problems that in the prior art, a quality management platform does not combine construction quality and construction progress for construction so as to cause poor quality management linkage, insufficient quantification of a construction process and the like, the invention provides a BIM-based informatization quality management method and system, a BIM model is used as an informatization carrier, and the quality management system is combined with an inspection batch template library to decompose a project into inspection entries; the quality management system is combined with a process construction method library, and process construction methods correspond to the inspection entries; checking and accepting inspection entries according to procedures during quality management; according to the method, the acceptance project and the process method are combined, the acceptance process is decomposed, project acceptance is carried out by taking the process acceptance process as a main line, meanwhile, the construction quality and the construction progress are associated and managed, project visual management and data carriers are realized by using the BIM, and refined management is realized.
Owner:CHINA TIESIJU CIVIL ENG GRP CO LTD

Anti-subsidence control method by supplying grouting in real time in shield construction

The invention discloses an anti-subsidence control method by supplying grouting in real time in shield construction. According to the anti-subsidence control method, a shield machine cutter, a shield shell, a shield tail brush, around soil layers, segments, a first annular segment, a second annular segment, a third annular segment, a water glass grout grouting pipe, an auxiliary synchronous grouting pipe, a main synchronous grouting pipe, a water glass grout grouting pump, a water glass grout preparation barrel, a shield machine cement grout synchronous grouting box and a ball valve are included. Synchronous grouting and secondary grout supplying are effectively integrated, cement injection and water glass injection are organically combined, therefore the timeliness and the effectiveness of filling of gap in the backs of the segments are strengthened, disturbances caused by intersection construction of a traditional secondary grouting and normal tunneling of the shield machine are eliminated, compared with the traditional secondary grouting method, cement grout does not need to be prepared separately, the grouting amount is greatly decreased by separately pumping the water glass grout, the construction schedule is speeded up, the automation level is improved by taking full use of self equipment of the shield machine, and the manpower and material resources are saved.
Owner:CCTEB INFRASTRUCTURE CONSTR CO LTD +1

Electric power engineering project management and control platform and system

The invention provides an electric power engineering project management and control platform and system. The electric power engineering project management and control platform comprises a project information unit, a contract monitoring unit, a design data monitoring unit, a construction progress monitoring unit and a completion monitoring unit. The electric power engineering project management andcontrol platform effectively integrates project management, contract management, financial control, acceptance management, information technology management, approval management and the like in enterprise management by utilizing an advanced informatization means so as to achieve the purpose of efficiently finishing various work or projects with high quality and low cost. As a set of modernized management information system, the target to be realized is not only project and personnel management, but also comprehensive cooperative work, knowledge management and monitoring management supportingthe whole process need to be realized. The system realizes timely information sharing, timely transmits approval of the reported information, reduces the waiting of the approval process and the information transmission between departments, and enhances the communication and communication of the system information.
Owner:晟光智能技术(山东)有限公司

Power transmission and transformation project construction field management system

InactiveCN105989431AReasonable schedulingAddress regulatory issuesResourcesDriver/operatorProject manager
The invention provides a power transmission and transformation project construction field management system. The process for implementing the system includes the following steps that: a construction party logins the system through a client end, authentication verification is performed on the construction party, if the construction party passes the authentication verification, the construction party is allowed to login the system; after the construction party logins the system successfully, the construction party checks messages, notices, upload field photos, work logs and field videos and scan a two-dimensional code to carry out attendance check; after a driver logins a client end, a vehicle positioning function is automatically enabled; a project administrator logins the project management system so as to query and manage construction progress; and after receiving information, construction personnel execute feedback operation in the system and accept the supervision of the project administrator. With the power transmission and transformation project construction field management system of the invention adopted, problems in supervision on the working conditions of the construction personnel and the use of vehicles in a construction field can be reasonably solved, so that the project administrator can have a good understanding of a whole construction process and the construction progress, and the improvement of the progress and quality of a project can be benefitted, and the scheduling of project personnel is more reasonable.
Owner:SICHUAN SHUNENG ELECTRIC POWER CO LTD

Method for resolving conflict between ordinary steel bar and prestressed pipeline based on BIM (Building Information Modeling)

The invention discloses a method for resolving conflict between an ordinary steel bar and a prestressed pipeline based on BIM (Building Information Modeling). The method is specifically implemented by the following steps: 1, building a three-dimensional model; 2, detecting a conflict position in the three-dimensional model built in the step 1; 3, exporting a CAD (Computer-Aided Design) drawing of the conflict position detected in the step 2; and 4, opening the CAD drawing of the conflict position saved in the step 3, and enlarging the ordinary steel bar inserted into the prestressed pipeline outwards at a corresponding position in order to avoid the conflict. According to the method, concrete construction information, ordinary steel bar information and prestressed pipeline information in a conventional two-dimensional plane construction drawing are integrated into a uniform three-dimensional BIM information model, so that the conflict position between the ordinary steel bar and the prestressed pipeline can be found easily and visually. A conflict avoiding scheme is put forward in advance, and workers perform steel bar blanking and binding under guidance, so that later rework is avoided; the construction quality is ensured; and the construction progress is accelerated.
Owner:SHAANXI RAILWAY INST

Engineering project intelligent dynamic safety supervision system based on BIM

ActiveCN111507595AImprove the intelligent level of safety risk managementRealize unified managementCharacter and pattern recognitionOffice automationControl systemMarking out
The invention provides an engineering project intelligent dynamic safety supervision system based on BIM, and the system comprises: a model building module which is used for building an engineering project BIM model according to the basic information of an engineering project; a project management and control module which is used for associating the construction progress of the engineering projectwith an engineering project BIM model to form an engineering project 4D BIM model; a safety analysis module which is used for analyzing dangerous large projects in the engineering project 4D BIM model according to the engineering project 4D BIM model and marking corresponding dangerous large project information in the engineering project 4D BIM model; and a safety supervision module which is usedfor monitoring the on-site construction process of the dangerous large project, acquiring on-site safety management information, and performing safety risk assessment and safety risk management according to the on-site safety management information. The intelligent dynamic safety management and control system is helpful for acquiring basic information of a project, analyzing dangerous large projects in the project by combining with the support of a database, and carrying out key safety supervision, analysis and management and control on the dangerous large projects, so that the efficiency ofengineering project safety supervision is improved.
Owner:广州高新工程顾问有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products