1600 results about "Construction scheduling" patented technology

System for multi-stage planning of construction processes and resource allocation

A system for multi-stage planning of construction processes and resource allocation, consisting of: a central planning engine configured to receive input data, including architectural design models, structural constraints, procurement schedules, and historical performance indicators; a task decomposition processor that is operationally connected to the central planning engine and configured to generate a hierarchical construction task graph by decomposing macro-level construction milestones into mid-level and micro-level subtasks, with each subtask having time estimates, location identifiers, resource requirements, and mutual dependencies; a hybrid planning processing unit configured to resolve time and resource constraints across the entire task diagram; a resource coordination controller that is operationally connected to the central planning engine, wherein the resource coordination controller includes a real-time database of work units, machines and material stocks, each resource being tagged with attributes such as availability, usage history, operating status and spatial location; a multitude of distributed execution units distributed across the construction zones, each distributed execution unit comprising an embedded controller, sensor interfaces, task status processing logic, and communication circuitry, each distributed execution unit being configured to receive planning instructions from the central planning machine, execute localized control logic for task confirmation and resource activation, and transmit task execution data back to the central planning machine; an adaptive conflict resolution processing unit that is operationally connected to the central planning engine and configured to detect conflicts in task execution or resource conflicts, simulate alternative task-resource allocation scenarios using a real-time multi-agent model, and autonomously update the task graph with revised task sequences and resource allocations; and A dashboard for the construction process, configured to visualize task progress, deviations from the planned schedule, and resource efficiency metrics, with the dashboard also being able to receive manual override inputs or approve automated conflict resolution proposals generated by the adaptive conflict resolution module.
Owner:1XL INFRA & REAL ESTATE DEVELOPMENT LLC +2

Communication engineering construction dynamic optimization method based on multi-dimensional perception

The invention discloses a communication engineering construction dynamic optimization method based on multi-dimensional perception, and the method comprises the steps: collecting the multi-dimensional perception data of a construction site in real time through a multi-source heterogeneous sensor network, including environment parameters, equipment operation states, construction progress and personnel behavior data; performing space-time alignment processing on the multi-dimensional sensing data, and constructing a space-time associated dynamic construction digital twinborn body; establishing a dynamic optimization model based on a reinforcement learning algorithm, taking construction efficiency maximization, resource loss minimization and safety risk minimization as target optimization functions, and embedding risk constraint conditions; inputting the dynamic construction digital twin into the dynamic optimization model, and outputting a multi-dimensional parameter optimization instruction set comprising equipment scheduling parameters, construction path parameters and resource configuration parameters; and performing real-time performance evaluation on the multi-dimensional parameter optimization instruction set through edge computing nodes, and dynamically adjusting weight parameters of the model to form closed-loop feedback control. The purpose of cooperatively improving the construction efficiency, the safety and the economical efficiency is achieved.
Owner:ZHUHAI PENGYUAN TECH CO LTD

Engineering construction digital project management method and system

The invention relates to the technical field of engineering progress management, in particular to an engineering construction digital project management method and system, and the method comprises the steps: database building, real-time data collection, and model building: generating a visual construction progress model; progress deviation judgment: calculating progress deviation and performing judgment; deviation analysis: calculating a resource gap of an affected process, and generating a resource allocation priority list; resource adjustment: pushing an adjustment instruction to the construction terminal according to the priority list; simulation: simulating the adjusted construction progress, and if the deviation is not eliminated, executing a redistribution step; redistribution: executing the deviation analysis step again; and optimization: optimizing subsequent project progress plan generation logic. The system comprises a database building module, a real-time data acquisition module, a model building module, a progress deviation judgment module, a deviation analysis module, a simulation module, a redistribution module and an optimization module. The method and the device have the effect of facilitating fine management of the engineering project.
Owner:济南崇道智能科技有限公司

Construction scene prediction method and device fusing image, text and BIM mode

The invention provides a construction scene prediction method and device fusing an image, a text and a BIM modal, and relates to the technical field of intelligent construction prediction management. According to the method, the BIM semantic graph is constructed by extracting the BIM semantic information of the BIM model, and the target detection recognition of the construction site video is carried out in combination with the YOLO model to obtain the target detection result; performing cross-modal alignment with the CLIP to realize deep fusion of the multi-modal data of the image, the text and the BIM to obtain a multi-modal heterogeneous graph; and inputting the multi-modal heterogeneous graph into a space-time sequence model for prediction, outputting prediction results of construction scenes at a plurality of moments in the future, and dynamically mapping the prediction results to a digital twinborn platform to realize risk early warning and visual display. The construction dynamic change can be captured in real time, the construction progress and risk can be accurately predicted, and the intelligent level of construction management is improved.
Owner:XIAMEN UNIV OF TECH

Construction progress monitoring method and system based on big data

The invention relates to the technical field of construction progress monitoring, and discloses a construction progress monitoring method and system based on big data. The method comprises the following steps: forming a space-time alignment data set through multi-source data acquisition, filtering and quality evaluation; performing feature extraction and registration to generate a digital model; target detection classification is performed to form a completion state table; progress evaluation is achieved through component-task mapping; trend analysis and risk identification are performed to generate a prediction result; decision reference is provided for personalized information screening and augmented reality display. Through multi-source data acquisition, fusion and intelligent analysis, accurate perception, objective evaluation, scientific prediction and visual presentation of the actual state of the construction site are realized, so that a comprehensive, accurate and prospective construction progress monitoring method is provided, the construction period delay risk is effectively reduced, and the construction management efficiency is improved.
Owner:ZHEJIANG ENERGY CONSTR CO LTD

BIM-based construction progress dynamic optimization system

The invention relates to the technical field of construction data modeling, in particular to a BIM (Building Information Modeling)-based construction progress dynamic optimization system, which comprises an abnormal event identification module used for detecting local abnormity based on multi-source data and marking an abnormal area; the local component reconstruction and dynamic fusion module is used for reconstructing an abnormal region component model and performing space mapping to obtain a global BIM model; the component-semantic double-layer graph modeling module is used for constructing a component topological dependency graph and a component semantic relation graph and jointly reasoning a state transition sequence of the component; the state recognition and self-adaptive classification module is used for fusing the geometric features of the component and the graph structure features and executing state recognition and judgment boundary adjustment; and the graph evolution calculation module is used for performing multi-round state propagation deduction to generate a component state evolution result. According to the method, in a heterogeneous information modeling environment, dynamic processing and state intelligent identification of component-level information are realized, and the data calculation precision and response capability under three-dimensional model driving are improved.
Owner:GUANGDONG YIZHIGU INFORMATION TECH CO LTD

Tunnel construction monitoring analysis method and system based on AI video monitoring

The invention provides a tunnel construction monitoring analysis method and system based on AI video monitoring, and relates to the technical field of artificial intelligence. A tunnel construction original video stream data set is acquired through a multi-view video acquisition device, and a spatio-temporal feature sequence is generated through spatio-temporal feature fusion processing; the spatiotemporal feature unit comprises a pixel region movement track, a personnel wearing identifier and a construction equipment contour feature, then extracting dynamic features of the spatiotemporal feature sequence to obtain a dynamic spatiotemporal feature set, and executing construction personnel statistical processing based on the dynamic spatiotemporal feature set; generating a hole entering personnel quantity statistical result, a personnel distribution statistical result of each construction part and a personnel identity matching result, performing work efficiency comparative analysis according to the personnel statistical result and a preset construction progress plan, and generating a construction progress deviation index and resource allocation optimization strategy; and when the progress deviation index exceeds the first threshold value, early warning is triggered, and a strategy is output to the management terminal, so that effective monitoring and management of tunnel construction are realized.
Owner:中国水利水电第七工程局有限公司 +1

Building engineering interaction method and system based on BIM model, and medium

The invention relates to the technical field of building data interaction, in particular to a building engineering interaction method and system based on a BIM model and a medium. The method comprises the following steps: collecting construction site environment parameters and structure response data by using a distributed sensor network; preprocessing the data by an edge computing node; generating standardized environment data and key structure indexes; comparing environment threshold values to identify abnormal events; the method comprises the following steps of: displaying spatial positioning and risk levels through a visual interface, receiving a regulation and control instruction input by a user, dynamically adjusting construction parameters of a BIM model, generating an optimized construction progress scheme, comparing the optimized scheme with an original model to identify a construction conflict area, and generating a conflict resolution report. Through the advanced monitoring technology and construction management technology, the response speed and decision-making efficiency of the building engineering project are improved, and the safety guarantee and resource utilization efficiency in the construction process are improved.
Owner:SHENZHEN GUOJIAN ARCHITECTURAL DECORATION ENG CO LTD

Municipal road construction section scheduling optimization method and system based on artificial intelligence

The invention relates to the technical field of municipal road construction, and discloses a municipal road construction section scheduling optimization method and system based on artificial intelligence, and the method comprises the steps: collecting the multi-source dynamic data of a construction region through Internet of Things equipment and a satellite remote sensing technology, and constructing a time sequence database; a multi-objective optimization model is established, and an initial scheduling scheme is generated by adopting a non-dominated sorting genetic algorithm with the goal of minimizing construction period, resource waste and traffic jam influence. Dynamically adjusting the priority of the construction section by using a reinforcement learning algorithm, and updating a construction task sequence; a graph neural network is utilized to detect space-time conflicts of construction sections, and conflict-free scheduling constraint conditions are generated; and optimizing resource allocation based on mixed integer linear programming, simulating a construction process in combination with a digital twinborn technology, correcting a construction progress deviation by using a Kalman filtering algorithm, and outputting a final scheduling instruction. According to the invention, optimization of municipal road construction section scheduling is realized, the construction period is effectively shortened, resource waste is reduced, and traffic jam is relieved.
Owner:南京中交浦滨建设有限公司 +2

Engineering collaborative management system based on BIM

The invention relates to the technical field of BIM collaborative management, in particular to a BIM-based engineering collaborative management system, which comprises a construction task sequence adjustment module, a construction data permission mapping module, a BIM component state association module, a construction environment dynamic monitoring module and a construction progress adjustment strategy module. According to the method, a dynamic permission adjustment mechanism is established by comprehensively analyzing constructor classification, operation areas and equipment operation records in combination with permission setting rules and operation behavior records, data safety and sharing efficiency are remarkably improved, visibility and sectioning areas of BIM components are adjusted in real time, synchronization of a BIM model and construction progress is guaranteed, and the construction efficiency is improved. Visual management accuracy is enhanced, a construction task sequence and resource configuration are optimized, environment monitoring and equipment parameter adjustment enhance construction environment adaptability, operation is stable, progress management dynamically adjusts and improves plan flexibility and response speed, and project management collaboration and efficiency are integrally improved.
Owner:四川省建筑机械化工程有限公司

Construction progress dynamic optimization method and system based on BIM and computer vision

The invention discloses a construction progress dynamic optimization method and system based on BIM and computer vision, and particularly relates to the technical field of building construction management, and the method comprises the steps: carrying out the automatic registration of a BIM model and a construction site image; processing the construction site image by adopting a visual identification algorithm to generate a visual identification result; constructing a four-dimensional dynamic BIM model, and mapping a visual identification result to a corresponding component in real time through multi-feature similarity calculation; the progress deviation is monitored by using key path dynamic identification and a deviation propagation matrix, and the risk is predicted by combining a Bayesian network and Monte Carlo simulation. The BIM and computer vision technologies are fused, a construction progress optimization system integrating automatic registration, dynamic monitoring, risk prediction and intelligent decision making is constructed, and the problems that traditional manual inspection data collection is low in efficiency, progress monitoring is lagged, risk prejudgment is fuzzy and resource allocation is extensive are solved; accurate monitoring, risk early warning and resource optimization configuration of the construction progress are realized.
Owner:ZHEJIANG LIDE ENGINEERING CONSULTING CO LTD

Construction progress analysis and regulation system based on BIM model

The invention relates to the technical field of construction progress management, in particular to a BIM (Building Information Modeling)-based construction progress analysis and regulation and control system, which comprises a component sequence identification module, a component time acquisition module, a sequence deviation identification module, a node offset analysis module and a plan time regulation and control module. According to the method, the three-dimensional coordinates of the BIM components are extracted to establish a spatial sorting relation, a priority system with spatial constraints is constructed, the sequence recognition precision is improved, time mapping is formed by combining state data and completion time, ordered association from the site progress to the model components is achieved, the completion time of the previous components is compared to recognize abnormal procedures, and quantitative records are formed. The actual offset and the planned floating time are fused to judge the offset type, the influence weight of the component in the progress network is quantified in combination with the offset direction and the sequence offset number, a comprehensive evaluation index is formed, the construction progress management has a clear logic structure, and the construction progress regulation and control precision and response efficiency are improved.
Owner:MIDDLE EAST INFRASTRUCTURE TECH GRP CO LTD

Dynamic subway construction progress regulation and control method and system based on digital twinning

The invention relates to a subway construction progress dynamic regulation and control method and system based on digital twinning. According to the method, a digital twin model is constructed by collecting multi-source heterogeneous data of a construction site, and a multi-dimensional construction progress characterization model is generated. Based on the model, progress deviation calculation and risk prediction are carried out to obtain a current progress deviation value. And once the value exceeds a preset threshold value, generating a regulation and control scheme set by using a multi-objective optimization algorithm. Then, the schemes are simulated and verified in a digital twinning environment, and a feasible regulation and control scheme set is formed to guide actual construction progress regulation and control. According to the method, by means of the digital twinborn technology and multi-source data fusion, the construction state is presented in real time, progress deviation and risks are rapidly recognized, an effective regulation and control strategy is formulated through an optimization algorithm, the construction progress management efficiency and accuracy are improved, the capability of responding to environment changes and emergencies is enhanced, construction delay and resource waste are reduced, and the construction progress management efficiency and accuracy are improved. And the subway construction management level and quality are optimized.
Owner:冯胤东

Digital management method and system for water conservancy project construction process

The present invention discloses a digital management method and system for a water conservancy project construction process, and belongs to the technical field of water conservancy projects. The method specifically comprises: real-time collection of relevant data from a water conservancy project construction site, and preprocessing, by comparing the actual construction progress with the planned progress, calculating the construction progress deviation, and analyzing the future construction progress trend, analyzing the construction quality data, training a prediction model through historical data, identifying construction quality hazards, combining the construction progress and quality, resource conditions and external environmental factors, intelligently scheduling construction resources, building a risk prediction model, and evaluating the risks in the construction process; in the context of complex water conservancy projects, it is possible to achieve process progress and quality management, reasonable resource scheduling and risk control, and better ensure the smooth progress of the project.
Owner:HENAN PROVINCIAL WATER CONSERVANCY FIRST ENG BUREAU +1

Hydraulic engineering construction digital intelligent management method and system

The invention discloses a digital intelligent management method and system for hydraulic engineering construction, particularly relates to the technical field of hydraulic engineering construction management, and is used for solving the problems of regulation lag and insufficient environmental disturbance adaptability of an existing method under the action of multi-physics field coupling. According to the method, a concrete three-dimensional temperature field model is established, initial regulation and control parameters are generated, and a heat conductivity coefficient under the seepage influence is corrected based on space-time relevance of pore water pressure and temperature data; the constraint boundary is dynamically adjusted in combination with the construction progress and the material strength curve, a cooling water pipe coordinated regulation and control matrix is constructed, and target flow instructions of space differentiation are generated through the included angle between the distance and the water flow direction; setting a lag time threshold and optimizing an execution time sequence according to the thermal inertia parameter, splitting the threshold and allocating a weight coefficient when the environmental wind speed suddenly changes, and finally updating the model parameter and the regulation and control instruction; accurate temperature control response and abnormal heat conduction suppression under multi-field coupling are achieved, and the structural safety and construction efficiency under complex working conditions are improved.
Owner:QINGDAO RUIYUAN ENG GRP CO LTD

Civil construction intelligent scheduling method and system based on BIM

The invention relates to the technical field of civil construction scheduling, and discloses a BIM-based civil construction intelligent scheduling method and system. The method comprises various resource parameters, construction procedures and site arrangement information. Performing construction progress dynamic simulation on the BIM model, generating a multi-dimensional progress plan in combination with a resource database, identifying a process logic relationship and potential resource conflict points, and forming a conflict early warning list with priorities; establishing an intelligent scheduling model according to the progress plan and the conflict early warning list, optimizing a scheduling algorithm by using a conflict early warning result, and dynamically adjusting resource allocation parameters; comparing the real-time construction data with the intelligent scheduling model, identifying resource supply and demand deviations and process delay risks, marking key conflict events and feeding the key conflict events back to the BIM model for visual analysis, and obtaining a conflict influence range; and performing construction process deduction on the BIM model based on a conflict identification result, identifying a potential optimization path and a deployment scheme, and determining an optimal scheduling strategy and implementation steps through feasibility verification.
Owner:NANJING COMM INST OF TECH

Building project resource scheduling optimization method based on BIM

The invention relates to the technical field of project management, in particular to a BIM-based building project resource scheduling optimization method, which comprises the following steps: based on the current progress state of a construction task, collecting the consumption of constructors, mechanical equipment and materials, comparing the task plan progress with the real-time progress, screening out construction links with the backward task progress, and establishing a construction project resource scheduling optimization model; and judging a resource type, and establishing a task progress offset. According to the method, the construction progress is accurately monitored, real-time evaluation of resource consumption is achieved, waste and scheduling lag are avoided, the construction path is optimized by means of the BIM model, the key path monitoring precision is improved, progress management and control effectiveness is ensured, key path progress deviation is analyzed, the resource shortage risk is recognized, stable supply of construction resources is guaranteed, and on the basis of the influence of resource shortage, the construction efficiency is improved. The resource distribution sequence is optimized, the resource utilization efficiency is improved, the supply chain delivery cycle is matched, the resource scheduling is optimized, the influence of resource supply and demand imbalance on the construction progress is reduced, and the continuous and stable construction progress is ensured.
Owner:SHENZHEN LEZAO PACKAGING TECH CO LTD

BIM model-based curtain wall construction progress visualization method and system

The invention relates to the field of building information management and construction progress visualization, in particular to a curtain wall construction progress visualization method and system based on a BIM model, and the method comprises the steps: obtaining the three-dimensional position information and installation state data of a curtain wall unit plate in real time through a sensor and an image collection device, and comparing the three-dimensional position information and installation state data with BIM integrated data, generating and updating a digital twinborn model; analyzing the construction data by using an artificial intelligence model, detecting a construction deviation and generating a construction adjustment suggestion; an optimal path is calculated through a construction path optimization algorithm, construction data are integrated to generate visual feedback, and the construction progress, the installation state and deviation information are displayed in real time through a visual engine, so that the construction monitoring and management efficiency is remarkably improved.
Owner:MINMETALS CONDO SHANGHAI CONSTR

BIM-based intelligent two-dimensional code bridge construction quality and progress management and control system

The invention relates to the technical field of bridge construction, solves the technical problem that progress or quality data cannot be updated in real time due to difficulty in direct synchronous data feedback between a construction site and a management system, and particularly relates to a BIM-based intelligent two-dimensional code bridge construction quality and progress management and control system. The geometric information, the construction progress and the quality standard of the bridge structure are recorded in detail, and a unique two-dimensional code is generated for each construction node. A constructor obtains real-time node information by scanning the two-dimensional code, updates the construction progress and uploads quality detection data, and analyzes and feeds back the construction data in real time, so that efficient management and control of the construction progress and quality are ensured. The system overcomes the defects in the prior art, has the characteristics of timely information updating, accurate data, automatic management, high traceability and the like, and can remarkably improve the management efficiency and the quality control level of bridge construction.
Owner:湖北交建检测有限公司 +1

Planning and scheduling system for optimizing road and bridge construction progress by utilizing artificial intelligence

The invention discloses a planning and scheduling system for optimizing road and bridge construction progress by using artificial intelligence, and relates to the technical field of road and bridge construction. The system comprises a data interaction system module, and the data interaction system module is bidirectionally and electrically connected with a model collaboration mechanism module. Through multi-source data fusion and model collaboration, the construction progress prediction precision is improved by 30%, resource waste is reduced by 20%, in the aspect of risk prevention and control, the geological disaster early warning advance rate reaches 85% through a space-time risk model, the social risk occurrence rate is reduced by 89% through public opinion monitoring, resource scheduling can be adjusted in real time through reinforcement learning and an evolutionary strategy, and the construction progress prediction efficiency is improved. The emergency risk response time is shortened by 50%, the block chain storage ensures that data cannot be tampered, the intelligent contract improves the multi-party collaboration transparency, and the construction management level is comprehensively improved. The problem that a road and bridge construction progress planning and scheduling system in the prior art does not dynamically adjust resource allocation in combination with risk factors and does not cover collaborative analysis of multi-source data is solved.
Owner:龙岩市公路建设发展中心

Project progress and resource early warning method and system based on dynamic regulation and control

The invention discloses a project progress and resource early warning method and system based on dynamic regulation and control, and the method comprises the steps: 1) collecting project progress and resource data in real time, and constructing a multi-source data fusion model; 2) based on the constructed multi-source data fusion model, judging whether the construction progress and the resource consumption are abnormal or not, and if so, executing the step 3); otherwise, continuing conventional construction progress tracking and resource management; 3) triggering a grading early warning mechanism, generating and executing an optimization regulation and control strategy, and adjusting the construction progress and resource configuration; and 4) evaluating the regulation and control effect, and returning to the step 2) after collecting feedback data. According to the method, the actual construction progress deviation and the resource supply and demand imbalance condition are comprehensively considered, the current overall operation condition of the construction project is analyzed, the construction management strategies are flexibly switched, the management parameters are flexibly adjusted, the construction progress can be rapidly and effectively guaranteed, resource utilization is optimized, and the construction efficiency is improved. And the intelligent level and the response efficiency of construction management are obviously improved.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Comprehensive pipeline construction management system based on BIM technology

The invention discloses a BIM technology-based comprehensive pipeline construction management system, which relates to the technical field of construction management and comprises a BIM model creation module, a pipeline construction planning module, a real-time progress monitoring module, a pipeline conflict detection and optimization module and a quality and safety management module. According to the comprehensive pipeline construction management system based on the BIM technology, multiple problems existing in traditional construction management can be effectively solved, through the functions of visual display, conflict detection and optimization, real-time progress monitoring, potential safety hazard inspection and the like of the BIM model, the system provides a comprehensive management tool for the construction process, and the construction efficiency is improved. The construction efficiency is improved, resource allocation is optimized, the construction quality and safety are greatly improved, finally, by means of the system, the overall management level of a project is remarkably improved, and the construction progress, quality and cost are more accurately and effectively controlled.
Owner:GUANGDONG CONSTR ENG DESIGN INST CO +1

Wharf steel structure construction progress dynamic management and control and resource allocation system

The invention relates to the field of engineering management, and discloses a wharf steel structure construction progress dynamic management and control and resource allocation system, which comprises a real-time data perception and fusion module for collecting field data and an initial plan and generating a fusion data stream; the dynamic construction digital twinborn construction and evolution module is used for updating the digital twinborn and a dynamic empirical risk layer in real time based on the fusion data flow; the multi-agent self-adaptive decision engine is used for generating a self-adaptive construction scheme based on digital twinborn simulation deduction and feeding back a risk signal; and the man-machine cooperation and closed-loop execution module is used for visualizing the scheme for manual decision making and issuing an instruction to a site. According to the method, the physical field data sensed in real time is fused with the digital model, the dynamic construction digital twin capable of being synchronously updated with the physical construction field state is constructed, and the technical effect that digital information and the physical entity state are kept highly consistent is achieved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Water conservancy construction progress intelligent management method and system

The invention provides a water conservancy construction progress intelligent management method and system. Wherein hydraulic engineering project plans are collected, dynamic changes in a life cycle are obtained through an integrated building information model technology, and a hydraulic engineering construction progress management framework is generated; extracting multi-source heterogeneous data, performing cross-modal information integration by applying a multi-modal fusion network algorithm, evaluating specific influence of external environment factors by adopting a causal forest technology, and generating a water conservancy construction progress and risk early warning report; establishing a kinetic equation by applying a graph neural differential equation algorithm, performing dynamic system simulation, and constructing a virtual water conservancy construction environment by adopting an enhanced digital twinborn simulation technology to capture construction efficiency and resource utilization conditions and generate a water conservancy construction resource allocation optimization report; and a lean six-sigma methodology is introduced to set a lean improvement plan, project feedback is collected, and a water conservancy construction progress intelligent management scheme is generated. According to the technical scheme provided by the invention, the intelligent level of water conservancy construction progress management is remarkably improved.
Owner:CHONGQING HUAJIDA TECHNOLOGY CO LTD

BIM-based traffic engineering construction progress and resource management optimization system

The invention discloses a BIM-based traffic engineering construction progress and resource management optimization system, and the system comprises a three-dimensional cognitive interaction body which adjusts the construction progress and resource configuration in real time, and eliminates the physical difference between a virtual model and an actual environment; the self-adaptive calculation engine is used for realizing butt joint between the virtual model and an actual construction site by utilizing real-time sensing data and a cognitive correction mechanism; the progress prediction simulation module is used for realizing dynamic prediction and optimization of the construction progress through deep learning and a self-adaptive feedback mechanism; the virtual-reality synchronous perception grid is constructed based on the obtained progress dynamic prediction and optimization result, and a virtual model and a construction site are synchronized and dynamically corrected; and the self-optimization module is used for realizing self-adaptive optimization and long-period evolution through a genetic algorithm and multi-objective optimization by utilizing a self-optimization and ecological optimization mechanism. According to the method, the problem of virtual reality distortion is solved, and the difference between virtuality and reality in the construction process is accurately corrected.
Owner:CHINA HIGHWAY ENG CONSULTING GRP CO LTD +1

Engineering cost progress management control method and system

The invention relates to the technical field of project cost progress management control methods, in particular to a project cost progress management control method and system. Comprising a multi-dimensional data integration and simulation deduction module, an intelligent early warning and dynamic decision module and a block chain collaboration and knowledge evolution module. Through the unique coding rule, the engineering quantity list, the material price, the labor cost and the model component are dynamically associated, the construction progress plan is embedded in the BIM model, the 4D construction animation is automatically generated, the resource demand peak value of each time period is counted, the resource conflict is identified in advance, and the component coding integrity and the cost parameter logicality are automatically verified through the attribute checking tool. And the manual auditing time is reduced.
Owner:SHANXI TRAFFIC PLANNING PROSPECTING & DESIGN INST

Water conservancy project cost accurate calculation method and system based on BIM model

The invention discloses a BIM model-based water conservancy project cost accurate calculation method and system, and relates to the technical field of water conservancy project informatization management, and the method comprises the steps: obtaining BIM model component data, construction scheduling data, construction path data and construction cost data, constructing a scheduling component diagram for conflict recognition, calculating the load value of a path segment, and calculating the load value of the path segment; a construction progress deviation value is determined by combining sensing data of the internet of things, and finally a comprehensive cost estimation value is calculated; the method has the beneficial effects that BIM model component data, construction scheduling data, path data and cost data can be integrated, a three-dimensional scheduling component diagram is constructed for conflict detection, a progress deviation value is dynamically calculated in combination with sensing data of the Internet of Things, quantitative association of construction cost and progress deviation is realized, and the construction efficiency is improved. The method has the advantages of improving the construction cost calculation accuracy, enhancing the dynamic response capability of the construction process and realizing the real-time linkage of the cost and the progress.
Owner:SHANGHAI EMBANKMENT PUMP GATE CONSTR & OPERATION CENT

Construction positioning method and system of simulation equipment in steel bridge deck pavement twin scene

The invention relates to the technical field of road engineering, in particular to a construction positioning method and system for simulation equipment in a steel bridge deck pavement twinning scene, and the method comprises the steps: obtaining the positioning information and construction data of a construction site in real time, and constructing a construction site data set; performing primary processing on the construction site data set through a positioning algorithm to obtain a positioning position and construction dynamic characteristics of equipment; based on a GIS technology and a BIM architecture, constructing a three-dimensional twinborn scene model of the steel bridge deck, and numbering the three-dimensional model according to bridge deck pile numbers and pile-by-pile coordinate information; and matching the processed equipment positioning position data with the three-dimensional twin scene, and displaying the real-time position and the movement track of the equipment through a model. According to the invention, the problem of inaccurate positioning data caused by signal interference in the steel bridge deck pavement construction process is effectively solved, the accurate monitoring of the equipment position and the construction track is realized, and the comprehensive monitoring capability of the construction progress and quality is improved.
Owner:JIANGSU JINGXING WUYUAN TECH CO LTD

Full-period management method and system for tunnel construction organization optimization based on BIM (Building Information Modeling)

The invention discloses a BIM-based full-period management method and system for tunnel construction organization optimization, and belongs to the technical field of construction organization and cost management. The management method comprises the following steps: establishing a three-dimensional geometric model and a parameterized model of a tunnel based on a BIM technology; performing work decomposition on a construction task, and calculating a construction activity time parameter; calculating the cost of materials, machinery and manpower of each construction unit, and summarizing the total cost of the project; optimizing a construction period and resource allocation under a multi-constraint condition by adopting a genetic algorithm; predicting future process time consumption and construction progress based on an LSTM time sequence prediction model; and integrating dynamic data of the construction site, and updating the BIM model in real time. Through combination with dynamic data, efficient organization and scientific management of the whole tunnel construction process are realized, the construction efficiency can be improved, the engineering cost can be reduced, and the scientificity and rationality of project decision making are remarkably improved.
Owner:CHINA MCC17 GRP CO LTD

Progress management method and system based on BIM model

The invention provides a progress management method and system based on a BIM model, and the method comprises the steps: S1, building the BIM model of a target building based on the parameters of the constructed target building; s2, superposing the virtual model in the BIM into a to-be-constructed scene in reality through AR equipment, and visually displaying a building structure; s3, the calculation system calculates the construction progress of each day according to the predicted completion time of the target building, simulates a site construction scene through AR equipment, and carries out conformity comparison on site construction photo information collected by collection equipment and the simulated construction progress to obtain a construction progress deviation; and S4, comparing the construction progress deviation with the preset construction progress deviation of the calculation system, judging whether the difference between the construction progress deviation and the preset construction progress deviation is higher than a threshold value or not, and taking corresponding measures. According to the invention, the engineering project can be managed quickly, accurately and visually through the BMI.
Owner:HANGZHOU GESHUO NETWORK TECHNOLOGY CO LTD