BIM-based construction progress monitoring method and system, electronic equipment and storage medium

A technology of construction progress and construction plan, applied in the field of construction project management, can solve problems such as slow efficiency, achieve the effect of reducing construction delays and improving monitoring efficiency

Inactive Publication Date: 2020-12-01
广东恩胜科技有限公司
View PDF3 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above-mentioned related technologies, the inventor believes that there are the following defects: the construction report needs to be filled in by managers every day, and at the same time, the required personnel report the overall engineering data, and the efficiency is slow.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based construction progress monitoring method and system, electronic equipment and storage medium
  • BIM-based construction progress monitoring method and system, electronic equipment and storage medium
  • BIM-based construction progress monitoring method and system, electronic equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] The following is attached Figure 1-3 The application is described in further detail.

[0055] The embodiment of this application discloses a BIM-based construction progress monitoring method, refer to figure 1 , including the following steps:

[0056] S1: Establish a BIM model, and decompose the BIM model into sub-models according to the construction plan.

[0057]Specifically, based on the BIM model established from the construction drawings, the established BIM model is lightweighted, wherein the lightweight refers to the compression of the data in the 3D geometric data part of the 3D building model. The construction plan includes the type and installation location of the components, and the BIM model is decomposed into sub-models according to the construction plan.

[0058] S2: Associate and pair submodels and components.

[0059] Specifically, the structure of the sub-model is the same as that of the component at the corresponding installation location, and the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a BIM-based construction progress monitoring method and system, electronic equipment and a storage medium, and belongs to the technical field of constructional engineering management. The monitoring method comprises the steps of establishing a BIM model, wherein the BIM model is decomposed into sub-models according to a construction scheme; carrying out association pairingon the sub-models and the components; acquiring construction information of the components, and building a sub-model paired with the components on the BIM model according to the construction information of the components to obtain construction progress information; and displaying and analyzing the construction progress information. The method has the effect of improving the construction progressmonitoring efficiency.

Description

technical field [0001] The present application relates to the technical field of construction engineering management, in particular to a BIM-based construction progress monitoring method, system, electronic equipment and storage medium. Background technique [0002] Prefabricated buildings refer to buildings assembled on site with prefabricated components. The advantages of this kind of buildings are fast construction speed, less restricted by climatic conditions, saving labor and improving construction quality. BIM (Building Information Modeling, Building Information Modeling) uses the relevant information data of construction projects as the basis of the model to establish building models. This technology uses digital modeling software to improve the efficiency of project design and construction. [0003] The construction schedule management of engineering projects is an important part of engineering project management. Engineering project schedule management refers to the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q10/04G06Q50/08G06F16/58G06F16/538G06F16/51G06T17/00G06F16/9537
CPCG06Q10/04G06Q10/103G06Q50/08G06T17/00G06T2210/04G06F16/51G06F16/538G06F16/5866G06F16/9537
Inventor 王朝萱温秋填
Owner 广东恩胜科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products