BIM-technology-based track construction system

A track and technology technology, which is applied in the field of track construction system based on BIM technology, can solve the problems of lack of data recording and visualization means, lack of data and building component association, and difficult statistics of project real-time progress, so as to improve project content and progress control The ability to optimize the construction plan, reduce errors and practical effects

Pending Publication Date: 2018-05-29
SICHUAN COLLEGE OF ARCHITECTURAL TECH
View PDF4 Cites 28 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This way of working is not only inefficient, but also the accuracy of the collected data is urgently questionable. It is difficult to count the real-time progress of the project, and it is also difficult to use it as a reference for management personnel to make decisions.
In addition, experienced managers in modern engineering are scarce, and excellent experienced managers are even rarer. How to use a set of software mechanisms to replace on-site construction guidance is a difficult problem that modern engineering needs to solve
Moreover, the traditional construction data is mostly in the form of paper tables, which is not conducive to intuitive display, and lacks the relationship between data and building components, and also lacks visual means for data recording, editing, and push operations.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-technology-based track construction system
  • BIM-technology-based track construction system
  • BIM-technology-based track construction system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] The track construction system based on BIM technology of this embodiment, such as figure 1 Shown: including on-site information collection module, construction plan module, BIM operation and maintenance server, project schedule tracking system, mobile terminal;

[0027] The on-site information collection module is used to collect parameters required for construction modeling in real time at the construction site, as a basis for establishing a construction dynamic model.

[0028] The construction plan module is used to provide existing GIS geographic information, construction equipment information, construction plan drawing information, and construction personnel information as a basis for establishing a construction foundation model.

[0029] The BIM operation and maintenance server communicates with the on-site information collection module in a wireless transmission mode, and communicates with the construction plan module, and is used to contact the data collected on ...

Embodiment 2

[0037] This embodiment is further optimized on the basis of embodiment 1, such as figure 2 As shown: the on-site information collection module includes an electrical equipment information collection unit, a weather information collection unit, a geographic information collection unit, and a construction personnel information collection unit; the electrical equipment information collection unit, a weather information collection unit, a geographic information collection unit, The construction personnel information collection unit is also connected to the wireless communication module to realize wireless communication with the BIM operation and maintenance server.

[0038] The geographical information acquisition unit includes a roadbed settlement detection device, a tunnel mountain body detection device, a rail bridge detection device; the roadbed settlement detection device includes a plurality of GPS locators distributed on the track route, a plurality of laser range finders a...

Embodiment 3

[0044] This embodiment is further optimized on the basis of Embodiment 2, and the wireless communication module is a ZigBee module. The ZigBee module is used here as the wireless communication module because it has the characteristics of simple structure, convenient use, reliable operation, and low price. In addition, each ZigBee network node can also communicate with multiple The isolated sub-node wireless connection that does not undertake the task of network information transfer is very suitable for stable information transmission between sensors and control switches that are not far away.

[0045] The construction personnel information collection unit includes an identity electronic tag and an RFID reader; the RFID reader communicates with the BIM operation and maintenance server through a ZigBee module. Through the characteristics of strong RFID penetration, stable working performance and low power consumption, it can effectively monitor the distribution of construction p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM-technology-based track construction system comprising a field information acquisition module for collecting parameters needed by construction modeling in real time at a construction site, a construction plan module for providing existing GIS geographic information, construction equipment information, construction plan drawing information and construction personnel information, a BIM operation and maintenance server for connecting data obtained by field collection and data stored in the construction plan module and establishing a construction model by using a built-in modeling software platform in the server, a program progress plan tracking system for checking a construction error timely and carrying out correction for optimization, and a mobile terminal for helping the staff receive track construction progress information in real time. With the BIM technology, dynamic model construction of the construction process is realized, so that the management content becomes visible and the capability of controlling the engineering content and progress by the administrator is enhanced. Therefore, the collaboration efficiency of construction participants is improved and the construction progress is accelerated.

Description

technical field [0001] The invention relates to the field of track construction, specifically, a track construction system based on BIM technology. Background technique [0002] The separation of design, construction, and operation in today's rail transit industry and the limitation of information brought about by the use of traditional two-dimensional design and the lack of information in the construction process have brought huge challenges to the operation and maintenance management of rail transit projects after they are completed. The application of BIM technology can effectively solve the problem of information recording and inheritance. BIM builds a 3D architectural model of the project in the design stage, and then enters the civil engineering, mechanical and electrical equipment and other related information of the project during the construction process to create a digital, visualized and integrated system information management that integrates design, construction...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/08
CPCG06Q10/04G06Q10/06G06Q50/08
Inventor 邹文莉廖思伟汤文杰杨梁山万阳
Owner SICHUAN COLLEGE OF ARCHITECTURAL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products