Intelligent large-scale shield tunnel management system based on BIM and AI

A shield tunnel and management system technology, applied in the field of civil engineering, can solve the problems of imperfect construction site configuration, untimely information communication, waste of construction land space, etc., to facilitate visual management and monitoring, improve the level of intelligence, guarantee The effect of construction progress

Inactive Publication Date: 2017-06-27
TONGJI UNIV
View PDF2 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to subjective and objective factors such as insufficient experience of construction technicians and complex geological environment, there are still problems in the construction of shield tunnels, such as untimely information communication, unreasonable allocation of man-machines and objects, and imperfect configuration of construction sites.
For example, the construction of shield tunnels involves a large amount of data, and it is difficult for follow-up projects to learn from the experience of specific construction stages; the construction of shield tunnels involves a variety of construction machinery and equipment, and conventional management methods can only control the time and sequence of entry and exit. Relying on manual work, it is impossible to optimize the configuration; the construction of shield tunnels involves the spatial planning of the construction land, and it is difficult to optimize the use of conventional methods, thus wasting the space of the construction land

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent large-scale shield tunnel management system based on BIM and AI
  • Intelligent large-scale shield tunnel management system based on BIM and AI

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] Such as figure 1 As mentioned above, the present invention discloses a large-scale shield tunnel intelligent management system based on BIM and AI. The intelligent management system proposes a three-dimensional management concept, including: a time management subsystem 1 for time, regulating and managing the overall construction progress, deployment of man-machines and objects; space-oriented BIM management subsystem 2, planning and managing the spatial location and entry and exit of materials and equipment; data-oriented AI intelligent subsystem 3, managing engineering information database, and using it as an AI Systematic learning resources, and constantly improve the level of intelligence. The management subsystem performs space-time management 18 and data-time management 19 for the construction items 17 in the time-space-data three-dimensional structure. Subsystem 3 to manage.

[0033] Establish the above-mentioned intelligent management system for the selected sh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an intelligent large-scale shield tunnel management system based on BIM and AI. The system comprises a time management subsystem used for regulating and managing the construction process and construction matters, a BIM management subsystem used for planning and managing the space position of materials and equipment and mobilisation & demobilisation, and an AI intelligent subsystem used for predicting resources needed by future construction and optimizing resource configuration in advance according to learning about known engineering. Compared with the prior art, the system is advantaged in that the time is the main line, the integral construction process is regulated and managed, and man-machine-material regulation is carried out; the space is the support, the BIM management subsystem is used for planning and managing the space position of the materials and the equipment and mobilisation & demobilisation; data is taken as the root, an engineering information database is managed and is taken as learning resources of the AI intelligent subsystem, an intelligentization level is improved continuously, the three are mutually independent and are associated through the data, visual management and monitoring on the tunnel shield construction process are facilitated, and construction experience references for subsequent engineering are facilitated.

Description

technical field [0001] The invention belongs to the field of civil engineering and computer technology, and relates to a shield tunnel management system, in particular to an intelligent management system for large shield tunnels based on BIM and AI. Background technique [0002] At present, the shield tunneling method has become the main method for constructing tunnels due to its high efficiency, speed, and safety. However, due to subjective and objective factors such as inexperienced construction technicians and complex geological environment, there are still problems in the construction of shield tunnels, such as untimely information communication, unreasonable allocation of man-machines and objects, and imperfect configuration of construction sites. For example, the construction of shield tunnels involves a large amount of data, and it is difficult for follow-up projects to learn from the experience of specific construction stages; the construction of shield tunnels invol...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06G06Q50/08
Inventor 张子新王帅峰李佳宇黄昕
Owner TONGJI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products