The invention discloses a steeply inclined thin ore body mining method suitable for broken surrounding rock conditions. The method comprises the following steps that S1,
engineering geological condition investigation is conducted on an ore body and surrounding rock of the ore body, and stope structure parameters are determined; s2, the ore body is divided into chambers and pillars in the trend according to the length of a stope, and continuous
stoping is conducted in two steps; s3, a stope preparation
cutting project is constructed in the stope; s4, arranging a slope ramp at the middle position of the ore body close to the ore body, constructing a connection roadway to the other side of the ore body from the slope ramp to the ore body, then constructing
stoping access roads from the side, close to the side with good surrounding rock stability, of the vertical connection roadway to the two sides, and performing
stoping filling step by step; s5, filling is carried out after the first layer is stoped, stoping of a second layer is carried out after filling is finished and design strength is reached, and circulation is carried out until stoping of the stope is finished; through the arrangement of the spiral slope ramp and the layered platforms, the distance between the slope ramp and the stope is reduced, the work amount of the connection roadway is greatly reduced, meanwhile, each layered platform is responsible for one layer, the gradient of the connection roadway is reduced, and ore transportation and equipment operation are facilitated; and meanwhile, the problems that when the steeply inclined thin ore body under the broken surrounding rock condition is exploited in an upward horizontal layered mode, the broken surrounding rock spans, even an ore body top plate cracks, and the safety of stoping operation of personnel under the cracked top plate is poor are solved, and the method has the advantages of being high in safety, efficiency and
mechanization rate and the like.