System for monitoring safety of tower crane

InactiveCN102153024ARealize real-time monitoringRemote monitoring real-time dynamicCranesGeneral Packet Radio ServiceEngineering
The invention relates to a safety technology for remotely monitoring a tower crane, in particular to a system for monitoring the safety of a tower crane. In the system, the output ends of an inclination angle sensor, an angle sensor, a height sensor, an amplitude sensor, a wind speed sensor and a weight sensor are electrically connected with the input end of a signal conditioning module respectively; the output end of the signal conditioning module is electrically connected with the input end of a micro processor; a storage module, a key input module, a voice alarm module and a control output module are electrically connected with the micro processor module; the micro processor module is further electrically connected with an RS232 module; and a global positioning system (GPS) module, a liquid crystal display, a general packet radio service (GPRS) module and a ZIGBEE module are electrically connected with the RS232 module respectively. In order to guarantee the signal processing instantaneity, the micro processor module adopts two micro processors for coordination and distribution of responsibilities; and the two micro processors exchange data with each other by using a system management bus (SMBus), so the high-instantaneity and all-round monitoring of the safety of the tower crane during running can be realized, and safety accidents can be avoided.
Owner:GANZHOU DEYE ELECTRONICS TECH

Self-jacking construction platform integrating vertical transportation equipment and mold base

The invention discloses a self-jacking construction platform integrating a vertical transportation equipment and a mold base, which comprises a steel platform, construction equipment connected to the steel platform and a supporting jacking system used for connecting the steel platform to the top of a core tube of a high rise building in construction in a supporting way, wherein a spatial steel truss platform is adopted as the steel platform; the construction equipment comprises a hanging rack and a template which are arranged on the spatial steel truss platform, a tower crane, a concrete spreader, a resting place, a simple processing field, a monitoring and overhauling system, and a construction elevator, wherein the tower crane, the concrete spreader, the resting place, the simple processing field and the monitoring and overhauling system are erected on the top of the spatial steel truss platform; and the construction elevator is connected between the spatial steel truss platform and the core tube. The supporting jacking system comprises a supporting stand column, a supporting frame and a hydraulic jacking mechanism. The self-jacking construction platform is arranged flexibly, and the steel platform is supported by the supporting jacking system, therefore, heavy equipments such as the tower crane, the concrete spreader and the like can be directly arranged on the steel platform and rise synchronously with the steel platform so that the time and cost consumed by respective jacking of various large-scale construction equipments are saved, and the construction efficiency is greatly improved.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

Movable-arm tower crane

The invention provides a movable-arm tower crane which comprises a backward-inclination prevention device, wherein the backward-inclination prevention device comprises a backward-inclination oil cylinder, a travel switch, a limiting detection piece and a hydraulic system; the backward-inclination oil cylinder comprises a rodless cavity; a spring is arranged in the rodless cavity; the travel switch is arranged on the cylinder body of the backward-inclination oil cylinder; the limiting detection piece is arranged on the piston rod of the backward-inclination oil cylinder; when the piston rod moves toward the rodless cavity, and reaches a preset position, the limiting detection piece triggers the travel switch; the hydraulic system comprises an oil tank, an oil drainage pipeline communicatedwith the rodless cavity and the oil tank, a logic cartridge valve which is arranged in parallel to the oil drainage pipeline, and is used for quickly draining oil, an overflow valve for draining the oil under preset pressure, and an electromagnetic valve electrically connected with the travel switch; and the electromagnetic valve is used for controlling the logic cartridge valve to change from anopening state to a closing state when the travel switch is triggered. According to the movable-arm tower crane, due to the backward-inclination prevention device, rigid impact between two members, namely a crane jib and an A-shaped frame, is reduced remarkably; the members are uniformly stressed; and the whole safety is improved.
Owner:ZOOMLION HEAVY IND CO LTD

Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame

ActiveCN103291076ASolve the problem of difficult control of lateral stabilityReduce high-altitude assemblyBuilding material handlingTower cranePortal frame
The invention relates to a steel truss hoisting construction method, in particular to a multilayer steel truss fragmented reverse hoisting construction method in an arc-shaped frame. The multilayer steel truss fragmented reverse hoisting construction method comprises the steps of firstly performing modeling and checking calculation to all of hoisting conditions, utilizing brackets at two ends and a portal frame in the middle as lifting points of an arc-shaped main truss, hoisting the arc-shaped main truss by combining a hydraulic synchronous hoisting technology, connecting sub trusses above two roof trusses and steel beams to form a trapezoid fragmented truss, utilizing the temporality-fixed main truss hoisted in position and the hydraulic synchronous hoisting technology to install roof layer fragmented trusses, dismounting the lifting point of the portal frame of the arc-shaped main truss after the arc-shaped main truss is stabilized, sequentially and inversely lifting multilayer fragmented sub trusses to a bottom layer downward, and then utilizing the main truss, the sub trusses, a truck-mounted crane, a tower crane and leading chains to install other members and finish hoisting of a multilayer steel structure of the arc-shaped frame. The multilayer steel truss fragmented reverse hoisting construction method in the arc-shaped frame has the advantages of achieving hoisting operation in a narrow field or on a building surface, ensuring quality and safety, saving expenses, shortening a construction period and being free of pollution and good in environmental-protection benefit.
Owner:JIANGSU NANTONG NO 6 CONSTR GRP

Hydraulic climbing system for wall-attached support frame

The invention discloses a hydraulic climbing system for a wall-attached support frame. The system comprises a support upright post, a support frame device and a hydraulic jacking device, wherein the support frame device is detachably connected with a bracket which is fixed on a core barrel concrete wall and at least comprises an upper support frame device and a lower support frame device; both the upper support frame device and the lower support frame device are provided with upright post supporting devices and upright post clamping devices; climbing step blocks are vertically distributed at intervals on a column of the support upright post; and the support upright post is supported on the upright post supporting device through the climbing step blocks and is connected with the upper support frame device and the lower support frame device through the upright post clamping devices in a clamping way. In the system, an overall elevating template system, a construction steel platform system, a tower crane support system and the like are automatically elevated entirely along with the height increase of a building main body. The system has high safety, short climbing time and high construction efficiency, and can be used repeatedly in different projects.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

Tower crane video monitoring system with automatic tracking and zooming functions and monitoring method

The invention discloses a tower crane video monitoring system with automatic tracking and zooming functions, and the invention also discloses a tower crane video monitoring method with automatic tracking and zooming functions. The method comprises the following implementing steps of taking a marker on a crane hook as a tracking target image, and detecting the area and the center of mass of an object at real time by the image processing technology to realize the automatic zooming and tracking, image sequence acquisition, target characteristic extraction, target characteristic match and target search location; and aiming at swaying in the running process of the tower crane, combining a color histogram with form features, and then improving the present mean shift tracking algorithm which is based on the distribution of a target color histogram according to the real operating condition of the tower crane, thereby realizing the target tracking under the environment of the tower crane. The invention has automatic camera zooming and tracking functions so that a tower crane operator can watch the lifted objects and the circumferential situation thereof clearly in a control room at real time .
Owner:XIAN UNIV OF TECH

Intelligent assembled building hoisting method based on robot machine vision

The invention belongs to the technical field of building hoisting, and discloses an intelligent assembled building hoisting method based on robot machine vision. A camera is utilized for replacing human eyes to analyze a complex scheme and obtain the optimal scheme, the prefabricated part hoisting path can be better planned, the assembled building hoisting efficiency and accuracy are greatly improved, and assembled building hoisting intelligence is achieved. The character of high precision of the three-dimensional laser scanning technology is utilized for obtaining the three-dimension accuratesize of a prefabricated component, a construction site and a construction tower crane, and high precision of construction is guaranteed. Finally, an operator of the construction tower crane conductsoperation through the obtained tower crane parameters, a field monitoring device can be utilized for visually judging whether the hoisting path requirement is met or not, and the defect that a personis needed for commanding in a traditional hoisting method and the defect that repeated hoisting is conducted for installing precision adjustment are overcome. By means of the intelligent assembled building hoisting method based on robot machine vision, the hoisting accuracy can be improved, the hoisting efficiency is improved, the construction time is shortened, and the labor force is relieved.
Owner:XIHUA UNIV

Suspended-rising support system of tower crane

InactiveCN102079489ASave materialReduce the maximum bending momentCranesSupporting systemMain branch
The invention relates to a suspended-rising support system of a tower crane, belonging to the field of building machinery. The suspended-rising support system comprises three sets of support structures which have same structure and are arranged up and down. When the suspended-rising support system works, the adjacent two sets of support structures support a tower body; each support structure comprises a support frame, a main girder, two symmetrical inclined struts as well as a first strut, a second strut, a third strut and a fourth strut, wherein the two symmetrical inclined struts are arranged at the lower part of the main girder and support the main girder; the first strut, the second strut, the third strut and the fourth strut support the main girder in the horizontal direction; the main girder, the two inclined struts and one ends of the four horizontal struts are respectively connected with the wall body; the upper part of the main girder is connected with the support frame; an expression of a pivot position of the main girder and the inclined struts is as follow: c(f-c)=a(f-a)+2a(f-c), wherein a is a distance from the action point of the frame at the outer side of a pivot O to the pivot O, c is the midline length of the frame along the main frame direction, and f is the calculation length of the main girder. The suspended-rising support system disclosed by the invention reduces the rigidity of the cantilever end, improves the action force of two main branches of the tower body near one side of a building to the main girder, enables the gravity of the tower body acted to the main girder to move inwards and reduces the horizontal load of the support structures to the building.
Owner:SHENYANG JIANZHU UNIVERSITY

Power transmission line monitoring and early warning system

The invention provides a power transmission line monitoring and early warning system. The power transmission line monitoring and early warning system comprises a field monitoring device and a surveillance server arranged in a power transmission line monitoring field, wherein the field monitoring device obtains video surveillance data in the monitoring field and transmits the video surveillance data to the surveillance server, and the surveillance server receives the video surveillance data. A target object which intrudes into the monitoring field is judged according to the video surveillance data. The target object is conducted with motion tracking, so that motion tracking data is obtained. According to the motion tracking data, the operation action and the motion trail of the target object are judged. According to the operation action, the motion trail and the position of a power transmission line in the monitoring field, early warning is conducted. According to the power transmission line monitoring and early warning system, a power transmission line cable is monitored in real time; action detection, tracking, recognition, behavioral model understanding and the like to large machinery moving objects such as a tower crane, an excavator and a bulldozer can be achieved; and decision making and the early warning are conducted. The problem of a 'passive monitoring' current situation of a traditional scheme is solved.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD +1

Tower crane hoisting and speed control system and speed control method thereof

ActiveCN103043534AImprove the efficiency of lifting operationsAvoid unpredictabilityLoad-engaging elementsSpeed control systemProgrammable logic controller
The invention discloses a tower crane hoisting and speed control system which comprises a PLC (Programmable Logic Controller); the PLC is respectively connected with an operation handle, a frequency converter and a hoisting sensor simultaneously; the frequency converter is connected with a motor and a speed measurement encoder to form a closed loop; the motor is connected with a winding drum through a reduction gearbox; and the hoisting sensor is used for detecting the hoisting weight through detecting the tensile force of a steel rope. The invention also discloses a tower crane hoisting and speed regulation control method; the PLC is adopted for controlling the speed regulation of the frequency converter to realize the gear separation and stepless speed regulation combination; during the working process, the PLC obtains a handle signal and a hoisting signal in real time and also obtains the current of the motor through a 485 bus; and a hoisting speed control mode is determined according to the state of the system. The device and the method have the beneficial effects that the practical running speed of the tower crane is regulated under the maximum speed limit of all gears, the unpredictability of a driver for speed is avoided, the PLC is adopted for realizing the closed-loop control of the current, and the speed stability is ensured.
Owner:XIAN UNIV OF TECH

Tower crane safety monitoring system capable of carrying out remote parameter diagnosis

The invention relates to a safety monitoring system, in particular to a tower crane safety monitoring system capable of carrying out remote parameter diagnosis. The tower crane safety monitoring system capable of carrying out remote parameter diagnosis comprises a control mainboard, a sensor, wireless modules, a remote monitoring platform, a displayer, a tower crane electric cabinet and a wireless hand set, wherein the wireless modules comprise a short-distance wireless module and a remote wireless module. The tower crane safety monitoring system capable of carrying out remote parameter diagnosis has the advantages that due to the fact that the wireless hand set is designed, debugging and maintenance of the tower crane safety monitoring system are convenient, the frequency of aloft working of workers is reduced, and safety of the workers is protected; the remote monitoring platform can carry out analysis on reported false alarms and missed alarms, and can timely send alarm information to related personnel through a short message platform; the control mainboard can detect abnormal signals of the sensor, and can timely discover a fault of the sensor; the remote monitoring platform can carry out diagnosis to judge whether parameters of the control mainboard are falsified, and can effectively prevent man-made amplification of an alarm threshold value.
Owner:浙江海康科技有限公司

BIM-based jacking formwork comprehensive design and application method

ActiveCN106250638AOptimizing the matching mold design schemeImprove work efficiencyGeometric CADForms/shuttering/falseworksTower craneLighting system
The invention discloses a BIM-based jacking formwork comprehensive design and application method. The method comprises the following steps of: firstly, designing a jacking formwork system according to a building structure drawing, and establishing a jacking formwork three-dimensional model based on a standard family library; secondarily, exporting the established three-dimensional model as a specified interface for performing structure checking and adjusting according to a result; and thirdly, in a jacking formwork system use process, respectively performing automatic formwork matching design and optimization, design and simulation of a whole process of mounting and dismounting of a jacking formwork and a tower crane, three-dimensional design and operation and maintenance of a lighting system of the jacking formwork system, comprehensive inspection of safety protection, integration of oil and electric circuit pipelines of the system, and anti-collision design of the tower crane and a climbing plan of the jacking formwork system. Through adoption of the BIM-based jacking formwork comprehensive design method provided by the invention, all designs of the jacking formwork system can be more visualized and precise, and the problems in a jacking formwork design process can be found from the visual level and the design can be adjusted in time, so that the work efficiency is improved, and unnecessary loss is reduced.
Owner:NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD

Method for reinforcing soft soil foundation by using cement-soil mixing pile

The invention relates to a method for reinforcing a soft soil foundation by using cement-soil mixing piles. The method comprises the steps of 1) arranging pile positions on the soft soil foundation; 2) lifting a mixing machine to one pile position on the soft soil foundation by using a tower crane; 3) starting up the mixing machine, wherein a mixing head cuts soil while rotating and then sinks to design depth; 4) preparing cement grout; 5) lifting the mixing head, spraying the grout and performing mixing to enable the cement grout to be fully mixed with the soil till the mixing head is lifted up to the ground; 6) repeating the step 3 to the step 5, wherein each pile requires for re-mixing and re-spraying; 7) filling clean water into an aggregate bin, starting up a grout pump to clean residual grout in all pipelines and cleaning the mixing head; and 8) moving the mixing machine to the next pile position and repeating the step 2 to the step 7 to carry out the construction of the next pile. Compared with the prior art, the method for reinforcing the soft soil foundation by using the cement-soil mixing piles has the advantages that the water-cement ratio is proper, the goal of uniform mixing is easy to realize, the pile forming quality is high, the strength is high, the construction is convenient to carry out, the construction cost is low and the economic benefits are remarkable.
Owner:STATE GRID CORP OF CHINA +2

Construction equipment and construction method for constructional engineering

ActiveCN103790378AEliminates manual construction workReduce construction costsBuilding material handlingInformatizationGuide tube
The invention discloses construction equipment for constructional engineering. The construction equipment comprises a tower crane, a control system, a material filling system, a material guiding tube and a 3D (three dimensional) printing head. The control system is used for establishing a model, setting 3D printing precisions according to engineering construction requirements, cutting the established model in layers by the aid of 3D model establishing software and controlling the position of the 3D printing head via the tower crane according to model information in each layer. The material filling system stores construction materials according to model information of each layer and is communicated with the 3D printing head via the material guiding tube. The invention further discloses a construction method for the constructional engineering. By the aid of the construction equipment and the construction method for the constructional engineering, only technicians need to manage equipment operation, prepare materials and manage a construction site, manual construction work of most of workers on the construction site is saved, engineering construction cost is saved, and construction techniques including informatization, automation and visualization of engineering construction are improved.
Owner:CHINA CONSTR STEEL STRUCTURE CORP LTD

Assembling type telescopic early-warning discharging platform and assembling construction method thereof

InactiveCN106382014AAdjust the overhangSolve problems such as poor operationBuilding material handlingEarly warning systemFloor slab
The invention relates to an assembling type telescopic early-warning discharging platform and an assembling construction method thereof. The platform comprises a fixing part, a telescopic part, a transmission mechanism and an early-warning system, wherein the inner side of the fixing part is anchored to a structural floor slab, and the outer side of the fixing part is movably connected with the telescopic part through the transmission mechanism. The fixing part and the telescopic part are two intelligent wholes, are of a drawer type design, can stretch out and shrink in by virtue of rolling wheels and the transmission mechanism, so as to regulate the stretch-out length of the discharging platform; the discharging platform can easily shrink in or stretch out by virtue of the transmission mechanism, so that the stretch-out length of the discharging platform can be flexibly regulated, and the problem that a tower crane is difficult to operate when site operation conditions are limited, particularly a cornice is formed in an upper part structure is solved; the fixing part and the telescopic part are respectively of an assembling design, and components are connected through bolts, so that the platform is convenient to detach and transport; and by arranging the early-warning system, the tensile force on a steel wire rope is monitored in real time by virtue of a tension sensor, and sound-light alarm is given when the load exceeds a design limiting value, so that the accident is prevented.
Owner:CHINA STATE CONSTRUCTION ENGINEERING CORPORATION +1

Building construction tower crane and fixed-point hoisting and lofting auxiliary system thereof

ActiveCN105858480APrecise positioning of hoistingLifting tasks save time and effortLoad-engaging elementsCranesComputer terminalTower crane
The invention discloses a building construction tower crane and a fixed-point hoisting and lofting auxiliary system thereof. The building construction tower crane comprises a cross arm, a lifting rope and a lifting hook and is matched with the fixed-point hoisting and lofting auxiliary system. The fixed-point hoisting and lofting auxiliary system comprises a base station, a monitoring device and a client terminal. The building construction tower crane is characterized by further comprising a moving station and a speedometer, wherein the moving station is mounted on the cross arm and right above the lifting hook; the speedometer is used for detecting the mileage of the lifting rope; and the moving station receives a satellite difference correction signal from a base station, acquires position information of the moving station and sends the position information to the monitoring device, the speedometer acquires the mileage of the lifting rope, and the monitoring device determines the position of the lifting hook according to the mileage of the lifting rope and the position information of the moving station. According to the technical scheme of the invention, process links in a manual attendance method can be reduced, and the intuition, convenience, accuracy and efficiency of the hoisting operation can be improved.
Owner:BEIJING UNIV OF CIVIL ENG & ARCHITECTURE

Tower crane rotation control equipment, system and method and tower crane

The invention discloses tower crane rotation control equipment, a system and a method and a tower crane. The tower crane comprises a hanger, an arm rest, a rotation device, a motor and a frequency converter, wherein the frequency converter is used for driving the motor, the motor is used for driving the rotation device, and the rotation device is used for driving the arm rest; and the hanger is flexibly connected with the arm rest. The equipment comprises a receiving device and a control device, wherein the receiving device is used for receiving the actual angular speed or accelerated speed of the hanger; and the control device is used for obtaining the angular speed or accelerated speed of the arm rest, determining the rotation speed and the real-time angular displacement of the hanger according to the actual angular speed or accelerated speed of the hanger, determining the rotation speed and the real-time angular displacement of the arm rest according to the angular speed or accelerated speed of the arm rest, causing the rotation speed and the real-time angular displacement of the hanger to be respectively compared with the rotation speed and the real-time angular displacement of the arm rest, and controlling the frequency of the frequency converter according to compared results. By using the control equipment, the real-time following control of the arm rest speed to the hanger speed can be realized, so that the anti-sway effect is achieved.
Owner:ZOOMLION HEAVY IND CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products