The invention discloses a water conservancy project
construction management system and method based on three-dimensional
visualization, and belongs to the technical field of water conservancy projects, and the method specifically comprises the steps: collecting related data of a water conservancy project construction region, carrying out the preprocessing, obtaining first
monitoring data, building a three-dimensional digital model of a water conservancy
project based on the first
monitoring data, and carrying out the construction of the water conservancy project. On the basis of the
hydraulic engineering three-dimensional digital model,
hydraulic engineering construction risks are evaluated in combination with
hydraulic engineering construction historical data, and risk grades are divided and hydraulic
engineering construction is dynamically managed according to
risk evaluation; on the basis of a three-dimensional visual model, all-around and real-time risk monitoring and evaluation can be carried out on a construction site, through real-
time data collection and analysis, potential safety hazards such as geological changes, equipment faults and earthwork collapse can be found in time, early warning and
emergency treatment are carried out in advance, and safety accidents are effectively avoided.