Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Anti-subsidence control method by supplying grouting in real time in shield construction

A supplementary grouting and control method technology, applied in the direction of earthwork drilling, shaft lining, tunnel lining, etc., can solve the problems that are difficult to control, and the surface deformation is easy to exceed the control standard, so as to control the formation subsidence, enhance timeliness and effectiveness Sexual, obvious effect

Active Publication Date: 2017-09-01
CCTEB INFRASTRUCTURE CONSTR CO LTD +1
View PDF7 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, after the excavation of the shield tunnel, there is an excavation gap between the stratum and the segment. Due to the weight of the shield itself, the excavation gap is usually larger at the upper part. Therefore, if the excavation gap at the top of the shield is not in the excavation process When filling in a timely manner, when passing through highly sensitive strata such as silt and silt fine sand, and the tunnel structure is close to important risk source projects, the induced surface deformation can easily exceed the control standard and is difficult to control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anti-subsidence control method by supplying grouting in real time in shield construction
  • Anti-subsidence control method by supplying grouting in real time in shield construction
  • Anti-subsidence control method by supplying grouting in real time in shield construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0021] see Figure 1-3 As shown, a real-time supplementary grouting anti-settlement control method for shield construction, including:

[0022] 1.1 Hole opening: After the shield cutter head 1 is excavated in place and the segment 5 is assembled, a hole must be opened at the top when the segment 5 is in the shield shell 2, and a ball valve 12 must be installed at the opening position to prevent the segment from 5 After the tail of the shield is removed, the h...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an anti-subsidence control method by supplying grouting in real time in shield construction. According to the anti-subsidence control method, a shield machine cutter, a shield shell, a shield tail brush, around soil layers, segments, a first annular segment, a second annular segment, a third annular segment, a water glass grout grouting pipe, an auxiliary synchronous grouting pipe, a main synchronous grouting pipe, a water glass grout grouting pump, a water glass grout preparation barrel, a shield machine cement grout synchronous grouting box and a ball valve are included. Synchronous grouting and secondary grout supplying are effectively integrated, cement injection and water glass injection are organically combined, therefore the timeliness and the effectiveness of filling of gap in the backs of the segments are strengthened, disturbances caused by intersection construction of a traditional secondary grouting and normal tunneling of the shield machine are eliminated, compared with the traditional secondary grouting method, cement grout does not need to be prepared separately, the grouting amount is greatly decreased by separately pumping the water glass grout, the construction schedule is speeded up, the automation level is improved by taking full use of self equipment of the shield machine, and the manpower and material resources are saved.

Description

technical field [0001] The invention relates to a control method during shield tunnel construction, in particular to a real-time supplementary grouting anti-settlement control method for shield tunnel construction, and belongs to the technical field of civil engineering construction technology application. Background technique [0002] Although the shield construction technology has been greatly developed, the ground subsidence caused by the construction is still unavoidable. When shield construction is carried out in the city, it is inevitable to pass through the section with complex ground conditions and dense superstructures, which has a great impact on ground subsidence. The control requirements are very high. When the shield tunnel passes through a major risk project or area that requires strict ground settlement control, one method is to adopt a scheme of soil reinforcement, and then the shield tunnel crosses again. This scheme requires sufficient reinforcement space on...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/08E21D11/10E21D11/08
CPCE21D11/08E21D11/105
Inventor 欧莘玮朱海军余南山叶亦盛苏长毅操琪侯博海刘开扬
Owner CCTEB INFRASTRUCTURE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products