218 results about "Ground settlement" patented technology

Ground settlement. Lowering of the ground surface, known as subsidence or settling, often occurs during an earthquake. Common causes of ground subsidence during an earthquake include consolidation or failure of the ground under a foundation, densification of sand and gravel layers due to the ground shaking and liquefaction. Settlement caused by...

Primary support construction for shallow-buried extra-large section tunnel crossing highway underneath in uneven strata

The invention discloses a primary support construction for a shallow-buried extra-large section tunnel crossing a highway underneath in uneven strata, which aims to effectively control the settlement of tunnel construction and the ground settlement. The primary support construction comprises an advanced support structure and a primary support structure, wherein the advanced support structure is formed by combining external big pipe sheds (11) and internal big pipe sheds (12) which are radially arranged at intervals; and the primary support structure is formed by combining an arch external support layer (21) and a whole-ring internal support layer (22) which are formed by spraying concrete, and the side wall section of the primary support structure is distributed with side wall system anchor rods (20). The primary support construction has the advantages of effectively reducing the influence of excavation deformation on the ground, improving the stress of the primary support, strengthening the stability of soil body, effectively solving the technical problem of big section loess tunnel construction, controlling the settlement value of the tunnel construction and the ground settlement value within 30 mm, and ensuring the safety of the tunnel construction and highway operation.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Shield synchronous grouting slurry

The invention belongs to novel materials in tunnel construction, in particular to shield synchronous grouting slurry capable of effectively controlling stratum displacement caused by shield construction and tunnel floating after escaping from the shield tail. The properties of the novel shield synchronous grouting slurry material relate to the control of stratum settlement caused by shield construction, the tunnel floating after escaping from the shield tail, and the long-term stability of the tunnel. The invention aims at overcoming the shortcoming in condensation time of conventional single-fluid activity and inertia material, mainly adopts yellow sand, lime putty and fly ash, and adds proper amount of additives to prepare the high-quality synchronous grouting material with high density, high early strength, small shrinkage deformation, good fluidity, good filling property, good stability, seismic resistance and no liquefaction. By the application of the synchronous grouting slurry in engineering test, the invention effectively controls the ground settlement and the tunnel floating after escaping from the shield tail, simultaneously excellent performance and construction effect of the synchronous grouting material obtain general consent from the building side and the construction side, and the synchronous grouting slurry has practicality and promotion value.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Groundwater recharge system structure for foundation pit dewatering

The invention relates to a groundwater recharge system structure for foundation pit dewatering. The purpose of the invention is to provide a groundwater recharge system structure for foundation pit dewatering which is capable of reducing and retarding surrounding stratum settlement and ground settlement caused by foundation pit dewatering under the state of an enormously thick confined aquifer, and simultaneously capable of overcoming the shortcomings such as recharge well blockage and water outflowing at the outer side in the prior art, improving the recharge efficiency and also prolonging the service life of the recharge system. The groundwater recharge system structure is matched with a foundation pit depressurizing system in use, and comprises a recharge well and a recharge device, wherein the recharge well comprises a well pipe; a water stop layer, a water-resisting layer and a filter layer are orderly arranged on the outer wall of the well pipe from top to bottom, a mudjacking pipe is reserved outside the well pipe, a sedimentation pipe is arranged at the bottom of the well pipe, a two-layer wind filter is arranged at the upper part of the sedimentation pipe, and a water suction pump is arranged in the well pipe 2-6m away from the bottom of the well, and the like; the recharge device comprises a recharge pipeline, a water release pipeline, an exhaust pipeline and the like.
Owner:SHANGHAI CHANGKAI GEOTECHN ENG

Ground sedimentation monitoring system

ActiveCN101813478AAccurate land subsidence monitoring dataMake up cycleNetwork topologiesSurveying instrumentsData acquisitionSedimentation
The invention relates to the technical field of geological condition monitoring, in particular to a ground sedimentation monitoring system which comprises a plurality of sensors, a programmed data acquisition unit and a data acquisition processing server. The sensors are arranged in a borehole extensometer and a water level well. A star topology structure consists of the sensors and the data acquisition unit, and the data acquisition processing server establishes connection with the data acquisition unit. The ground sedimentation monitoring system is characterized in that the data acquisition unit is connected with a CDMA (Code Division Multiple Access)module which is connected with a fixed IP server by a CDMA network, the fixed IP server is connected with a communication port of the data acquisition processing server by an LAN (Local Area Network), unique code corresponding to a placing area is stored in each sensor, and the data acquisition processing server is internally provided with an item table for recording and setting the code information corresponding to sensor codes. The invention has the advantages of acquiring ground sedimentation monitoring data in real time with high efficiency and overcoming the defects of long period and less data of manual monitoring.
Owner:上海市地质调查研究院 +1

Regional ground settlement monitoring method based on multiple track and long strip CTInSAR (coherent target synthetic aperture radar interferometry)

Disclosed is a regional ground settlement monitoring method based on multiple track and long strip CTInSAR (coherent target synthetic aperture radar interferometry). The regional ground settlement monitoring method based on the multiple track and long strip CTInSAR includes seven steps: step 1, partitioning long strip radar data and performing accurate registration on the long strip radar data after being partitioned; step 2, generating a differential interference stripe atlas; step 3, removing track remnant phase positions; step 4, performing CTInSAR timing sequence analysis; step 5, examining and correcting adjacent partitioning blocks of a long strip; step 6, unifying coordinate systems of multiple tracks; step 7, examining information of the multiple tacks and unifying basis references. The regional ground settlement monitoring method based on the multiple track and long strip CTInSAR solves the two main problems that how to reduce error influences of base line error, atmospheric oscillation, phase unwrapping noise and the like, which show obvious low frequency characteristics along with range enlargement in a spatial domain during the deformation information extraction process and how to perform the accurate registration on deformation monitoring results of the adjacent tracks on space positions, which are encountered during the large region deformation survey and monitor process of InSAR (synthetic aperture radar interferometry), and unifies the basis references of deformation measurement among the different tracks.
Owner:CHINA AERO GEOPHYSICAL SURVEY & REMOTE SENSING CENT FOR LAND & RESOURCES

Blade-cut-in type soft soil multi-point displacement meter anchor head

The invention relates to a blade-cut-in type soft soil multi-point displacement meter anchor head comprising a middle shaft rod, an external rod, an upper frame, a lower frame, a spring tube, a transmission rod and an anchoring cutter. The external rod sleeves the upper portion of the middle shaft rod, the bottom of the external rod is connected to the upper frame, the bottom of the middle shaft rod is connected to the lower frame, the spring tube sleeves the lower portion of the middle shaft rod, the upper end of the spring tube is connected with the upper frame, the lower end of the spring tube is connected with the lower frame, one side of the transmission rod is hinged to the upper and lower frames, the other side of the transmission rod is hinged to the anchoring cutter, the middle shaft rod is provided with a segment of spiral structure, and the inner side of the upper frame is provided with a nut structure; when the middle shaft rod rotates, the spring tube stretches to drive the lower frame to bounce upwardly so as to drive the transmission rod to extend out the anchoring cutter into the tested-segment drilling hole wall soil. Compared with the prior art, the blade-cut-in type soft soil multi-point displacement meter anchor head has the advantages that the blade-cut-in type soft soil multi-point displacement meter anchor head can be used for measuring different ground settlement in a soft soil area and providing ground settlement monitoring data for foundation pit engineering and underground engineering.
Owner:TONGJI UNIV

Near-G-series high-speed train ground settlement prediction method based on three-dimensional geologic model and back analysis

The invention discloses a near-G-series high-speed train ground settlement prediction method based on a three-dimensional geologic model and back analysis. The method comprises the following steps of S1, obtaining geological survey data, the underground water level and ground settlement monitoring data in a study area; S2, constructing a regional three-dimensional geological model; S3, calculating the regional underground water level change; S4, constructing a regional ground settlement model; S5, conducting back analysis calculation on stratum mechanical parameters; S6, conducting prediction calculation on the regional ground settlement amount. According to the along-G-series high-speed train ground settlement prediction method, the geological survey data, the underground water level and the ground settlement monitoring data of G-series high-speed train engineering are utilized, and with the combination of back analysis, a three-dimensional ground settlement prediction model which can consider the uneven spatial distribution of the soil layer thickness and the soil body mechanical parameters is constructed. The along-G-series high-speed train ground settlement prediction method has high prediction precision, and can be widely applied to prediction of the ground settlement amount caused by the change of the water level along the G-series high-speed trains.
Owner:CHINA RAILWAYS CORPORATION +1

Transverse tunnel cover method for shallow-buried underground excavation large underground space construction

The invention discloses a transverse tunnel cover method for shallow-buried underground excavation large underground space construction. Foundation pits or pilot tunnels are formed, in the longitudinal direction of underground space, of the tops of side walls of the underground space to be constructed, temporary transverse stress structures are formed inside the foundation pits or the pilot tunnels at a time and located above a top plate of the underground space to be constructed and are controllable in rigidity, the temporary transverse stress structures are connected with piles inside the foundation pits or the pilot tunnels to form a temporary transverse top cover-pile bearing system, and under protection of the transverse top cover-pile bearing system, a single-span or multi-span and a single-layer or multi-layer underground space structure can be constructed in a sequential construction mode or in an inverse construction mode. In shallow-buried underground excavation large underground space structure construction, ground settlement is effectively controlled, constructed building deformation is reduced, the construction risks are reduced, the construction period is shortened, and the construction cost is lowered.
Owner:BEIJING GENERAL MUNICIPAL ENG DESIGN & RES INST +1

Construction method for treating operating metro tunnel settlement by using anchor cable method

InactiveCN102767194ADoes not affect normal operationSolve the problem of differential subsidence deformationFoundation repairPilot holeEngineering
The invention relates to a construction method for treating operating metro tunnel settlement by using an anchor cable method, wherein a horizontal directional driller is utilized to drill along a design arc curve so as to form a pilot hole, then the guiding drill bit is replaced by a reversed broaching bit, the driller is backed and a stranded wire is pulled back at one time, a concrete pier with a reserved channel for passing through the stranded wire and a foundation pile for supporting the concrete pier are casted in the buried point and unearthed point of the stranded wire, a prestressing force is applied, and a construction of prestress anchor cable system passing through the downside of the operating metro tunnel is formed; in soft earth area, the prestress anchor cable system is arranged in every 200-600 meters along the direction of the operating metro tunnel. The technical method belongs to a trenchless construction technology, the project amount is less, the construction cost is low, and the influence on peripheral buildings and environment is less; and during the construction, not only can the normal operation of the metro tunnel be not influenced, but also the differential subsidence deformation of the metro tunnel in soft earth area caused by ground settlement can be effectively solved, the charge for long term maintenance is reduced, and the operation safety is ensured.
Owner:HOHAI UNIV

Water level cycle rising and falling induced ground settlement test apparatus and test method thereof

The invention relates to a water level cycle rising and falling induced ground settlement test apparatus and a test method thereof. The apparatus comprises a model column (23) used for containing soil for test, a water supply unit, a water drainage unit, a data measurement unit and a data acquisition unit, the bottom of the model column is provided with a model column water inlet (18) and a model column water outlet (19), the water supply unit is connected with the model column water inlet (18), the water drainage unit is connected with the model column water outlet (19), the data measurement unit is arranged in the soil for test in the model column (23), and the data acquisition unit is connected with the data measurement unit; and the on or off state of the water supply unit and the water drainage unit is adjusted to carry out water level cycle rising and falling adjustment, the data measurement unit measures data information of the soil for test in the model column (23), and the data acquisition unit acquires data information, and analyzes the data information. Compared with the prior art, the apparatus and the method realize effective research of the change rules of the settlement volume, the soil pressure and the aperture water pressure of different soil layers, induced by water level cycle rising and falling.
Owner:TONGJI UNIV

Ground settlement space monitoring method through Kriging interpolation based on genetic algorithm

InactiveCN102855392AEasy to handle simultaneouslyReduce interpolation susceptibility to outliers in regionalized variablesGenetic modelsSpecial data processing applicationsWeight coefficientGenetic algorithm
The invention discloses a ground settlement space monitoring method through Kriging interpolation based on a genetic algorithm. The method comprises the following steps of: acquiring coordinates and ground settlement of monitoring points; calculating distance among the monitoring points; dividing the distance into distance groups; calculating variation function values corresponding to the distance groups; determining a variation function model and fitting a variation curve; solving a Kriging weight coefficient; calculating settlement estimated values and conducting iterative computation; and encrypting settlement monitoring results through a grid method. On the basis of the traditional Kriging algorithm, the genetic algorithm is introduced, the variation function model is fit and natural logarithm is taken for regionalized variables, so as to reduce influences caused by distribution problems and abnormal values. Compared with the traditional settlement monitoring model, the ground settlement space monitoring method through Kriging interpolation based on the genetic algorithm has the characteristics of high estimation accuracy, high reliability and the like.
Owner:HOHAI UNIV

Construction method for earth pressure balance shield tunneling machine to laterally penetrate through initially-supporting mined tunnel at close range

The invention provides a construction method for an earth pressure balance shield tunneling machine to laterally penetrate through an initially-supporting mined tunnel at a close range. The construction method comprises the following specific steps that firstly lofting is conducted on site to determine the side boundaries of two tunnels, construction of the mined tunnel is stopped, construction of partition piles is started, and an inclinometer, mined tunnel monitoring points and ground settlement monitoring points are laid; then initial values of all the monitoring points are collected, the shield tunneling machine starts to tunnel normally, data are collected, processed and analyzed, obtained information is fed back to constructors in time, and mining protective measures and tunneling parameters of the shield tunneling machine are dynamically adjusted; and finally after the shield tunneling machine passes through the mined tunnel smoothly, tunneling of the mined tunnel is started. The construction method for the earth pressure balance shield tunneling machine to laterally penetrate through the initially-supporting mined tunnel at the close range can quickly provide conditions and construction parameter guidance for shield construction, reduces the safety risk of mined tunnel construction, provides effective soil changing forms, and has good social effects and economic benefits in the aspects of construction periods, cost, safety, quality, and the like.
Owner:URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP

A method for early warning of tower emergency failure under ground settlement condition

ActiveCN109388865AFacilitate correct emergency decision-makingEffectively reflect the security situationHeight/levelling measurementDesign optimisation/simulationSimulationContact type
The invention discloses a pole tower emergency failure warning method under ground settlement condition. The invention locates the weak point of the pole tower under the ground settlement condition through the finite element simulation calculation, and provides guidance for the selection of strain measuring points; The safety margin of the tower under the ground settlement condition can be given accurately by analyzing the influence of the foundation change on the strain change of the measuring point. Through the real-time monitoring of the tower steel structure strain in a short time, combined with the results of finite element simulation analysis, it can effectively reflect the tower safety status and play a role of failure early warning, which is convenient for line operators to make correct emergency decisions. In addition, the invention provides a non-contact type tower strain real-time monitoring method and flow based on a substrate and a fixture, which can overcome the shortcomings such as installation and maintenance difficulties caused by the strain gauge directly pasted on the tower, easy dampness of the sensor and the like, and can be widely applied to the dangerous tower steel structure strain real-time monitoring under the short-term inland foundation settlement condition.
Owner:WUHAN UNIV

Construction method for opening hole between rectangular pipe jacking channels

The invention discloses a rectangular pipe jacking construction technology, and particularly discloses a construction method for opening a hole between rectangular pipe jacking channels. The construction method comprises the following steps: construction preparation, freezing hole construction, freezing station mounting, active freezing and maintenance freezing, excavating and building construction, freezing hole plugging, and thaw settlement grouting. Through the arrangement of a freezing hole, and arrangement of preventive measures in the construction process of the freezing hole, the construction safety and the construction effect are ensured; for contact channel excavating and building construction, earth excavation is carried out in a layering and blocking removal way, so that the structural stability after contact channel construction is ensured and damage to a surrounding structure is small; after completion of the contact channel construction, the thaw settlement grouting is performed through grouting holes preserved in the two sides of the hole opened between the pipe jacking channels, and preserved in a top plate and a bottom plate, so that ground settlement and structural deformation are controlled; by the construction method, the construction problem of the hole between the rectangular pipe jacking channels is solved, the construction process is safe, the opened channel structure is stable and reliable, and the construction efficiency is high.
Owner:CHINA RAILWAY NO 2 ENG GRP CO LTD

Underground comprehensive pipe gallery prefabricated assembling construction method

The invention discloses an underground comprehensive pipe gallery prefabricated assembling construction method. The underground comprehensive pipe gallery prefabricated assembling construction methodcomprises the following steps that (1), a mold and a reinforcement cage are prepared; (2) concrete is poured and vibrated; (3), steam curing and demoulding are carried out, (4), lifting and transportation are carried out; and (5), assembling is carried out. A BIM modeling is carried out before the step (1) is carried out; reinforcing steel bar cage construction is formed by auxiliary binding andbinding of a reinforcing steel bar shaping tire film; after the reinforcing steel bar cage is put into a mold, a hanging nail and a bolt are pre-buried; after concrete pouring is completed, an auxiliary angle at the corner position of the inner wall of a prefabricated pipe gallery is carried out, and a tensioning groove is formed in the middle of the auxiliary angle; and a first section of the prefabricated pipe gallery is spliced from the lowest gradient, and when two sections of two pipe gallery are assembled, a jack is combined to carry out opposite angle tensioning until the four corner parts are tensioned and pulled. The reinforcement cage can be smoothly fed into a die once, the pipe gallery structure does not need to be punctured in the pipe gallery when a support is hoisted and installed, the influence of ground settlement on the pipe gallery can be effectively prevented, and the construction efficiency and the construction quality are improved.
Owner:中铁十一局集团第五工程有限公司

Molded lining support structure and construction method for soft soil ground layer

The invention discloses a molded lining support structure and a construction method for a soft soil ground layer. The molded lining support structure comprises a closed lining support, the closed lining support comprises a plurality of steel tubes, first connecting steel plates, second connecting steel plates and concrete, the steel tubes are longitudinally and uniformly arranged, the adjacent steel tubes are communicated through the first connecting steel plates and the second connecting steel plates, and the concrete is poured in the steel tubes and spaces enclosed by the adjacent steel tubes, the first connecting steel plates and the second connecting steel plates. The molded lining support structure provides closed permanent lining support for an underground excavation project before the underground excavation project is excavated. Excavation workers do not need to worry about the problems of ground settlement and the like caused by unstable tunnel faces when large-area soil is excavated for the underground excavation project under the support of the closed lining support structure, so that the molded lining support structure and the construction method can be applied to any soft ground layers, and have the advantages of high construction process safety and mechanization degree.
Owner:CHINA RAILWAY ENG CONSULTING GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products