852 results about "Tunnel wall" patented technology

Construction method of V-level surrounding rock tunnel

InactiveCN101614125AAvoid defects such as cavity collapseRealize safe constructionUnderground chambersTunnel liningRock tunnelTunnel wall
The invention relates to a construction method of a V-level surrounding rock tunnel, comprising the following steps: (1) making a drill guiding I-beam steel lagging jack, i.e. mounting an I-beam steel lagging jack, a groove steel trimming beam, a lock pin anchor rod, a guiding steel pipe, a longitudinal connection steel rib and face injecting concrete in sequence; and (2) construction and support in the tunnel, i.e. drilling pipe shelter steel pipe holes, mounting pipe shelter steel pipes, filling slurry inwards. The earthwork construction of a pilot tunnel comprises earthwork construction, primary support, injecting concrete on a pilot tunnel wall, suspending steel bar nets, casting concrete basis, mounting I-beam steel lagging jack, groove steel trimming beam, steel pads, I-shaped steel inclined strut and lock pin anchor rods, welding longitudinal connection steel bar, injecting concrete on the face and removing core soils; mounting a first-level step temporary inverted arch comprises: constructing lower-level earthwork, performing primary support in the pivot tunnel, mounting the second-level step temporary inverted arch, constructing the following level of earthwork, performing primary support, casting and filling inverted arch, and casting lining concrete at a time inside the pivot tunnel. The invention has the advantage of rapid penetration speed and safe construction.
Owner:CHINA RAILWAY NO 9 GRP

Tunnel wall rock deformation monitoring method and monitoring system thereof

The invention relates to a tunnel surrounding rock deformation monitoring method and a monitoring system thereof. The monitoring method is as below: (1) firstly, a laser is fixed on the inner wall of a stabilized tunnel surrounding rock, then a fixed photosensitive displacement signal monitor is arranged on a preliminary bracing of an unstable surrounding rock in the constructed tunnel, and the signal output end of the laser is opposite to the signal receiving end of the photosensitive displacement signal monitor; (2) during the monitoring, the laser sends a real-time laser signal to the photosensitive displacement signal monitor used for receiving laser signals, and in the monitoring process, the photosensitive displacement signal monitor sends monitoring data on the deformation displacement of the unstable surrounding rock to a signal processing terminal; and (3) the signal processing terminal performs automatic analysis according to collected data, and when the deformation displacement value of the surrounding rock reaches or exceeds a dangerous deformation value, the signal processing terminal sends an alarm signal via an alarming system. The method and the system thereof are favorable for reducing and avoiding casualty and loss caused by serious tunnel and laneway collapse so as to improve the construction safety.
Owner:CHINA RAILWAY 24TH BUREAU GRP +2

Ceramic imitation cement component, ceramic imitation cement product and preparation method thereof

The invention discloses a ceramic imitation cement, a ceramic imitation cement product and a preparation method thereof. The ceramic imitation cement comprises the following components in percentage by mass: 35 to 50 percent of hydraulic adhesive, 15 to 43 percent of aggregate particles, 8 to 28 percent of filler, 0.5 to 8 percent of polymer, 0.3 to 3 percent of fiber, 0.5 to 1.3 percent of water reducing agent, 0.2 to 1.3 percent of additive and the balance of water. The ceramic imitation cement product of the invention has the characteristics of high intensity, toughness, rigidity, non-inflammability, low water absorption rate, high resistance to freezing and thawing, antibiotic property, insect resistance, and mould resistance, looks like ceramic but does not need sintering or glazing, has decorating property of an FC plate but does not have the defects of the FC plate and has more functions; and the ceramic imitation cement product can be taken as inner wall and outer wall decorating plates of buildings, floors, outer wall hung plates, wall plates of subway stations and tunnel wall plates. The preparation method has the advantages of simpleness, convenience, practicability, small investment, quick response and capability of preparing ceramic imitation cement plates, plain concrete plates, and terrazzo slabs and flexible cement plates of various colors.
Owner:SHANGHAI HENGFENG FLUOROCARBON MATERIAL

Tunnel heading-along earthquake advanced detection device taking heading machine as earthquake focus and method thereof

The invention discloses a tunnel heading-along earthquake advanced detection device taking a heading machine as an earthquake focus and a method thereof. The device comprises an earthquake detector, an earthquake focus signal receiving sensor and an earthquake wave receiving detector array, wherein the earthquake focus signal receiving sensor is arranged on the arm of the heading machine; and the earthquake wave receiving detector array is arranged on a tunnel wall. The method comprises the following steps of: continuously acquiring earthquake wave signals through a three-component sensor which is coupled on the arm of the heading machine and a three-component sensor array which is arranged on tunnel surrounding rock by taking vibration generated by cutting rock with a cutting head during working of the heading machine as a hypocenter; and recording the acquired signals for processing, and forecasting the position and structural detail of a geological anomalous body in front of a tunnel by analyzing received wave field imaging geometrical characteristics. Due to the adoption of the device and the method, the problem of oneness of an earthquake wave field of a pure explosive source in near flat ground layer tunnel advanced detection can be solved without influencing the tunnel heading work; the device has high working efficiency and high detection accuracy, and is free from safety risks; and accurate positioning of a geometrical anomalous body can be realized.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Tunnel convergence displacement and arch crown settlement measuring device and measuring method

The invention provides a tunnel convergence displacement and arch crown settlement measuring device and measuring method. The measuring device is mounted on a tunnel wall and comprises an alignment device fixedly mounted on the tunnel wall, a laser distance measuring sensor mounted on the alignment device and a reflector mounted on a measuring point on the tunnel wall. The alignment device comprises a base, a ball socket is arranged in the base and is in spherical fit with a ball head rotor; the ball head rotor is fixedly connected with the laser distance measuring sensor; a locking device is arranged between the ball socket and the ball head rotor. The base is fixedly mounted on the tunnel wall through an expansion screw; the thread at one end part of the expansion screw is shorter than a threaded hole in the base of the alignment device. The measuring device further comprises an external triggering line and an external triggering button which are connected with the laser distance measuring sensor. Only one measuring device is needed to finish the convergence displacement and arch crown settlement measurement of an entire tunnel; the measurement result is accurate; the requirements of multiple measuring lines, high frequency and big total quantity of tunnel convergence monitoring are met.
Owner:TONGJI UNIV +1

Intelligent unmanned aerial vehicle inspection system and method of tunnel

The invention discloses an intelligent unmanned aerial vehicle inspection system and method of a tunnel. On the basis of combination of the unmanned aerial vehicle technology and the image processing technology, the unmanned aerial vehicle is applied to tunnel inspection work. According to the invention, various sensors are added to an unmanned aerial vehicle platform; with data collected by a monocular black-and-white camera and an inertial measurement unit (IMU), precise positioning and navigation of the unmanned aerial vehicle in the tunnel are realized by means of multi-sensor data fusion according to a VINS-Mono positioning mapping algorithm; a 2D laser radar collects point cloud data to realize estimation of a tunnel wall direction and UAV obstacle avoidance; a high-resolution camera collects a tunnel image, a motion trajectory of the camera is restored based on an SfM algorithm, and a three-dimensional model of the tunnel is generated by combining a high-definition image, thereby realizing the detailed tunnel inspection task. Compared with the traditional tunnel inspection way relying on the personnel and vehicles, the intelligent unmanned aerial vehicle inspection system and method have advantages of high automation degree and high work efficiency and can be widely applied to tunnel inspection work.
Owner:WUHAN UNIV

Device and method for carrying TBM (tunnel boring machine) seismic wave advanced prediction instruments

The invention discloses a device and a method for carrying TBM (tunnel boring machine) seismic wave advanced prediction instruments. The device for carrying the TBM seismic wave advanced prediction instruments comprises a seismic wave excitation machine carrying device and a seismic wave detector carrying device. The seismic wave excitation machine carrying device comprises bases, and the bases are arranged on slide rails axially arranged along tunnels, are connected with first driving mechanisms and can move along the slide rails under the driving effects of the first driving mechanisms; the first driving mechanisms are connected with a controller; an excitation machine is mounted at the tail end of a mechanical arm, the other end of the mechanical arm is mounted on the bases, the bases can move along the slide rails under the driving effects of the first driving mechanisms, and accordingly excitation can be carried out on different cross sections by the excitation machine; the mechanical arm is connected with second driving mechanisms, and angles of the excitation machine and angles of tunnel walls can be adjusted by the mechanical arm under the effects of the second driving mechanisms, so that excitation effects can be guaranteed; the first driving mechanisms and the second driving mechanisms are connected with the controller.
Owner:SHANDONG UNIV +1

Non-contact mine ground pressure observing and estimating method

The invention is a non-contact mine pressure observing and evaluating method, relating to a technique of monitoring and evaluating relative stress state of mine digging space or tunnel wall rock by non-contact monitoring the electromagnetic radiation information generated by loaded coal and rock, and the observing method: firstly selecting a region to be monitored, aligning the valid receiving direction of an oriented receiving electromagnetic antenna to an test point and obtaining Ei after test and testing until all test points are tested. And the evaluating method: index of mine pressure evaluation adopts average values Ei of electromagnetic radiation strengths of coal and rock, and calculating average value Eavg of all Ei; displaying the test results Ei in figure, and when the obtained electromagnetic radiation strength of a test point is higher than Eavg, the test point is evaluated as a high stress point; a region with two or more continuous test points whose electromagnetic radiation strengths are all higher than Eavg is evaluated as a high stress region; a region with two or more adjacent test points whose electromagnetic radiation strengths sharply increase by twice above or sharply decrease by above 50%, is evaluated as a high stress gradient region.
Owner:CHINA UNIV OF MINING & TECH

Four-period-five-purpose hole-drilling high-efficiency gas extracting process

InactiveCN102337919AEliminate disastersCover tunnelingGas removalHydraulic fracturingTunnel wall
The invention discloses a four-period-five-purpose hole-drilling high-efficiency gas extracting process, comprising the steps of: drilling a measure hole from a rock stratum tunnel wall of a coal seam top plate rock stratum tunnel to one side of the rock stratum tunnel and drilling a extracting hole from the rock stratum tunnel wall of the coal seam base plate rock stratum tunnel to a coal seam working face; performing shock blasting and/or hydrofracture to the measure hole for increasing the permeability of the coal seam, wherein the measure hole is a rock hole in the top plate or base plate rock stratum of the coal seam and positioned over or under the coal seam working face; sealing the measure hole and the extracting hole for extracting gas, and then tunneling the tunnel of the coal seam; continuously extracting the gas in the coal seam through the measure hole and/or the extracting hole when before and in stope. According to the four-period-five-purpose hole-drilling high-efficiency gas extracting process, the high-efficiency gas extraction in periods of tunneling the coal seam tunnel, and before, in and after stoping on the working face can be achieved. And simultaneously, the four-period-five-purpose hole-drilling high-efficiency gas extracting process can shield the tunneling of double coal seam tunnel of the working face.
Owner:HENAN POLYTECHNIC UNIV

Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole

InactiveCN102635402APrevent proliferationWater seepage disposal construction is quick and convenientDrainageSiphonWater storage tank
The invention discloses a siphon drainage method for tunnel wall water seepage disposal by using a dipping borehole. A dipping borehole is drilled in a water seepage point of a tunnel wall, and the relative altitude difference between the orifice and the hole bottom of the borehole is less than 8m; one end of a siphon drain pipe 3 is inserted in a hole-bottom standpipe, and the hole-bottom standpipe is inserted in the bottom of the borehole together with the siphon drain pipe; the other end of the siphon drain pipe is inserted in a water storage tank of a diversion pipe; underground water seeped from surrounding rock enters the dipping borehole to cause the water level to rise in the borehole and also cause a siphon process, the underground water in the borehole is drained to the diversion pipe in real time through the siphon drain pipe, and the water is guided to a drainage ditch of a tunnel through the diversion pipe and flows out of the tunnel. The method disclosed by the invention disposes the water seepage by dredging instead of blocking, thus avoiding the diffusion of an underground water seepage range. The construction of the tunnel side wall water seepage disposal is rapid and convenient, and a bad effect caused by a damaged lining impermeable layer due to the seepage-proofing disposal can be avoided.
Owner:ZHEJIANG UNIV

Tunnel detection method based on binocular vision

The invention belongs to the technical field of nondestructive testing, and discloses a tunnel detection method based on binocular vision. The method comprises the following steps: (1) inputting a high temperature alarm threshold temperature, and building infrared thermal image and visible light data models of a normal wall without water leakage; (2) shooting an infrared thermogram and a visible light thermogram of a tunnel wall; (3) determinining whether there is a high temperature region through temperature statistics of the infrared thermogram, and giving an alarm for high temperature; (4)reducing noise and extracting water leakage regions in the infrared thermogram and in the visible light thermogram; (5) synthesizing the water leakage region extraction maps of the infrared thermogramand the visible light thermogram as a final water leakage region extraction map; and (6) calculating the water leakage area according to the water leakage region extraction map. The method uses a binocular vision technology based on an infrared thermal imaging technology and a visible light imaging technology, and can combine the advantages of the infrared thermal imaging technology and the visible light imaging technology to achieve a better water leakage region extraction effect.
Owner:HUAZHONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products