The embodiment of the invention discloses a multi-stage collaborative supporting method and structure for an ultra-deep well large-span chamber, and the method comprises the following steps: firstly identifying an overlying key rock stratum and calculating a pressure relief range, carrying out'
skylight opening 'excavation on the overlying key rock stratum of the large-span chamber to realize
high stress transfer and pressure relief, and releasing pressure for the large-span chamber to be excavated. The cavern is in a low-stress state, and dynamic disasters such as
rock burst and the like caused by cavern
stress concentration or high-stress cavern large-deformation disasters are reduced; precise excavation is carried out to form a chamber, first-time supporting is carried out, high-pretightening-force yielding anchor cables are applied to a top plate and side parts, and a deep and shallow part cooperative bearing layer is formed through long anchor cables and short anchor cables; and then secondary supporting is carried out, loosening blasting pressure relief is carried out on the base angles, a high-strength concrete-filled
steel tube support is erected, and the space between the high-strength concrete-filled
steel tube support and the surrounding rock is filled with a yielding back plate. And then grouting anchor cables are constructed at the bottom corners to block stress transfer, and pressure relief
drill holes are constructed in the top slope part to regulate and control the surrounding rock stress. And finally, an anti-slide
pile is vertically arranged in the center of the bottom plate.