Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

228 results about "Multi cluster" patented technology

Protocol and structure for self-organizing network

A cluster tree network formed by self-organization of a number of nodes. The method of self-organization includes processes for cluster formation, cluster network maintenance, intra-cluster communication. In the cluster formation process, each node discovers if any neighboring node is a cluster head or if any node is already a member of a cluster (thus making it a networked node), and if a cluster head or a networked node is discovered, each node establishes a communication link with the cluster head or the networked node. If no cluster head or networked node is discovered, the node itself becomes a cluster head. The network is maintained by each node periodically broadcasting a HELLO message to neighboring nodes, receiving responses to the HELLO message and updating a neighbor list in accordance with responses to the HELLO message. Multi-cluster networks are also provided using the processes of inter-cluster network formation, inter-cluster network maintenance, and inter-cluster communication. The resulting network has one or more clusters of nodes, each with a cluster head and a number of member nodes, each assigned a node identifier by the cluster head. In a multi-cluster network, a designated device assigns identifies to each cluster head in the network. Border nodes, which are members of at least two clusters, act as routers connecting the clusters and relaying information packets between the clusters.
Owner:ARRIS ENTERPRISES LLC

Hydraulic fracturing technology for horizontal well with fractures

ActiveCN103953323APromote formationReduced breakage conditionsFluid removalHorizontal stressMulti cluster
The invention discloses a hydraulic fracturing technology for a horizontal well with fractures. The hydraulic fracturing technology comprises the following steps in sequence: (1), according to on-site information, calculating the stress difference values caused by major fractures and adjacent fractures; (2), according to the stress difference values caused by the major fractures and the adjacent fractures, calculating the pressure required when the fracture turns; (3), according to the pressure required when the fracture turns, determining the intensity of temporary plugging agents, and calculating the corresponding construction displacement; (4), according to the design parameters, conducting the segmental multi-cluster fracturing and impulse-type temporary plugging pressurizing technology on a reservoir stratum simultaneously. The hydraulic fracturing technology is mainly based on the horizontal stress difference drop-out values caused by the major fractures and the adjacent fractures, and simultaneously adopts the segmental multi-cluster fracturing and impulse-type temporary plugging pressurizing technology to force the fracture to turn, breaks through the technical bottleneck that the fractures are difficult to form in the stratum with a high stress difference and rudimentary natural fractures, and fills in the blank in the prior art.
Owner:SOUTHWEST PETROLEUM UNIV

Volume transformation process of low permeability reservoir

The invention discloses a volume transformation process of a low permeability reservoir, and the volume transformation process sequentially comprises the following steps of (1) selecting a coal bed, shale, tight sand or other low-permeability reservoir; and (2) adopting a pitching current-limiting hydraulic fracturing way after perforating a plumb shaft; adopting a segmental multi-cluster perforation hydraulic fracturing way after perforating a horizontal well; and varying displacement, propping agent, fracturing fluid and sand ratio in the pumping process in both fracturing ways. Due to adopting the measures for varying the displacement, the sand ratio, the propping agent and the fracturing fluid in the hydraulic fracturing process, pitching current limitation can be adopted when the plumb shaft is fractured or the segmental multi-cluster perforation fracturing process is adopted for the horizontal well, and a netted crack system is formed in the reservoir. Due to adopting the volume transformation process, the volume transformation effect is realized, the weakness of the traditional hydraulic fracturing process that a single crank cannot conform to the commercial production capacity or the later yield is reduced too fast can be avoided, and technical support can be provided for the oil-gas resource development of the low-permeability reservoir.
Owner:HENAN POLYTECHNIC UNIV

Method for establishing database cluster by utilizing virtualization

The invention provides a method for establishing a database cluster by utilizing virtualization, which utilizes the technical advantages of virtualization, ensures that all processing units in the database cluster obtain optimal resources, simultaneously improves the resource utilization rate of a physical hardware, and realizes the rapid deployment, expansion of the database cluster, the dynamic migration, the resource isolation of a multi-cluster system and the dynamic management of system resources, wherein the all processing units in the database cluster obtain optimal resources, i.e. a CPU, a memory and IO resources are customized and allocated in advance for a virtual machine according to the requirements of the processing unit in the database cluster for the resources in an underlying server system of the virtual machine; the improvement of the utilization rate of system resources means that a plurality of virtual machines are deployed and operated on the underlying server system of the virtual machine so as to improve the resource utilization rate of the underlying server of the virtual machine; the rapid deployment and expansion of the database cluster mean that the rapid expansion of the database cluster is realized through the mirroring replication function of a virtualized software; and the dynamic migration means that the dynamic migration of the virtual machine is realized by utilizing the virtualized software, and the service of the database cluster is not interrupted.
Owner:LANGCHAO ELECTRONIC INFORMATION IND CO LTD

container Cloud-platform multi-cluster building method, media and device based on Kubernetes and OpenStack

A container Cloud-platform multi-cluster building method based on Kubernets and OpenStackcomprises that step of establishing a control cluster in the container cloud platform, defining a cluster API through the control cluster CRD, and creating a cluster controller and a node resource pool in the controller cluster; controlling the cluster to receive the cluster operation request and modify the cluster CR record sent by the user, The cluster controller using list- Watch mechanism to check cluster CR records and resource changes, delete and add user clusters according to resource changes, delete and add nodes, and the cluster controller updating cluster status, controllingthe cluster to receive the cross-cluster operation request sent by the user, the cluster controller judging whether thecross-cluster operation request corresponds to the cluster API or not, if yes, forwarding the cross-cluster operation request to the corresponding cluster for processing, otherwise, processing the cross-cluster operation request. The invention also relates to a storage medium and an electronic device. The invention realizes the construction of multiple clusters and multiple tenants of the container cloud platform, uniformly manages multiple clusters, and can share the same cluster among tenants.
Owner:杭州才云科技有限公司

New fracturing process suitable for encrypted development of shale gas well

ActiveCN109977612AIncrease the complexity of the transformationImprove the efficiency of transformationData processing applicationsFluid removalMulti clusterTransformation efficiency
The invention relates to the technical field of horizontal well fracturing, and discloses a new fracturing process suitable for the encrypted development of a shale gas well, which comprises the following steps of (1) collecting the data; (2) analyzing the stress and compressibility; (3) designing the interval of the segment clusters; (4) designing the number of clusters; (5) carrying out the temporary plugging design in the midway; (6) designing the construction displacement; (7) designing a fracturing scale; and (8) designing a sand adding mode. According to the essence of the method, the small-section multi-cluster segmented design of reducing the section cluster spacing is carried out on the target horizontal well by analyzing the single well ground stress characteristics and the compressibility of the shale gas well of encrypted development; meanwhile, the pumping design of the variable-density perforation, midway ball throwing temporary plugging and continuous sand adding is combined, and finally, the effect of improving the single well transformation complexity and the reservoir transformation efficiency is achieved, the volume transformation of the whole horizontal well isachieved, the crack complexity is improved, the transformation strength is improved to a larger extent through improvement of a sand adding mode and a pumping program, and meanwhile the single well construction cost is reduced.
Owner:CHINA PETROLEUM & CHEM CORP +1

Data center operating system

The present invention provides a data center operating system. The system comprises: a host resource, which comprises a hardware computing resource, an application container engine Docker and a distributed resource management framework Mesos used for managing computing resource information, and which is used for providing a hardware resource and an application container; a core system, which comprises a UI, a RESTful API, a scheduler Swan, a monitoring alarm module Prometheus, a log monitoring module that comprises a LogProxy and an ELK log analysis system, a publishing system Backer and a mirror image repository, and is used for connecting a customization UI system and the host resource and allowing a user to implement management of the host resource by using the customization UI system, including scheduling of the host resource, monitoring and alarming, log recording and analysis, application publishing and management of the mirror image repository; and the customization UI system, which comprises CLI, SSO, an auditing interface and a multi-cluster management interface, and is used for providing a customization operating interface of the data center operating system. The system provided by the present invention can efficiently utilize a server, quickly deploy and migrate an application, and conveniently extend a service and manage the system.
Owner:王璞

Cluster interval optimizing method for segmental multi-cluster fracturing of horizontal well of low-permeability oil and gas reservoir

The invention discloses a cluster interval optimizing method for segmental multi-cluster fracturing of a horizontal well of a low-permeability oil and gas reservoir. The cluster interval optimizing method for segmental multi-cluster fracturing of the horizontal well of the low-permeability oil and gas reservoir sequentially comprises the following steps that (1) the induced stress generated by hydraulic fractures in a stratum is calculated; (2) the formation pore pressure after fracturing liquid is leaked off is calculated; (3) formation pore elastic stress after the fracturing liquid is leaked off is calculated; (4) the three induced stress fields and the original ground stress field are superposed, so that a new ground stress field is obtained; (5) facture network waves and the region area are calculated; and (6) a relation curve chart of the fracture cluster interval, the fracture network waves and the region area is drawn with the cluster interval being used as x-coordinates and the fracture network waves and region areas being used as y-coordinates, and the optimal cluster interval is determined. According to the cluster interval optimizing method for segmental multi-cluster fracturing of the horizontal well of the low-permeability oil and gas reservoir, the interference effect of the hydraulic fractures on the original ground stress field is considered, the expanding and shear fracturing behaviors of natural fractures under a complex ground stress field condition are also considered, and the novel cluster interval optimizing method is formed with the optimization goal of obtaining the maximum fracture network wave and the maximum region area; and the novel cluster interval optimizing method is more objective, accurate and practical.
Owner:SOUTHWEST PETROLEUM UNIV

Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof

ActiveCN102979495AIncrease the number of staged fracturing stagesFacilitate fine segmentation reconstructionFluid removalCurrent limitingMulti cluster
The invention discloses a multi-cluster current limiting fracturing string of an open hole horizontal well and a fracturing method thereof; the mainly adopted equipment is as follows: a hydraulic anchor, a hanger, an open hole packer, a multi-cluster sliding sleeve, a ball throwing open type sliding sleeve, a pressure open type sliding sleeve, a base sealing ball base and the like. A shaft is sealed through the packer; the multi-cluster sliding sleeve, the ball throwing open type sliding sleeve and the pressure open type sliding sleeve are mounted in packing sections; a first packing section of a horizontal well section is modified through measures by applying the pressure open type sliding sleeve, and then, a sliding sleeve set is controlled through well opening ball throwing to sequentially modify the sections, and finally, spray discharge liquid is emptied, and balls are reclaimed for starting operation. Under the precondition of not increasing ball throwing times of the original fracturing technique, the technology improves the number of staged fracturing sections of the horizontal well exponentially, and facilitates fine staged modification of a longer horizontal well.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Horizontal well sectioning multi-cluster perforating and fracturing optimizing method and device

The embodiment of the invention provides a horizontal well sectioning multi-cluster perforating and fracturing optimizing method and device and relates to the field of oil and gas field capacity expansion revamping. The method comprises the steps that an inter-cluster flow dynamic distribution model is built, and fluid pressure in cracks is calculated; a stress interference model is built; in terms of the stress interference model and the inter-cluster flow dynamic distribution model, a multi-cluster fracturing crack dynamic extension model is built; and a multi-crack simultaneous expanding step length model is built, and construction parameters meeting the multi-cluster fracturing crack dynamic extension model are substituted into the multi-crack simultaneous expanding step length model to obtain optimal construction parameters. By utilizing the multi-cluster fracturing crack dynamic extension model, the construction parameters according with conditions can be selected, then by utilizing the multi-crack simultaneous expanding step length model, the expanding step length and the angle are calculated, and the optimal construction parameters are selected. The defect that in the prior art, during constructing, it is considered that all clusters of cracks can extend effectively is overcome, and the parameters such as the cluster spacing and the perforating mode can further be selected optimally.
Owner:CHINA PETROLEUM & CHEM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products