188 results about "Flexible scheduling" patented technology

Internet of things system

Flexible scheduling, self-healing, high-utilization strong stability for cellular network communications are discussed. Cellular network communication settings and strategies are developed with communication interval, transmit power data rate, channel delay, spectrum occupancy, source coding, receiving sensitivity, channel coding, signal-to-noise ratio, packet loss rate, channel occupancy rate, reception frequencies frequency band size of data package transmission frequencies, data package structure, modulation scheme, information coding scheme, antenna configuration.
Owner:CHINA ENTROPY CO LTD

Distributed computing resource dynamic scheduling method suitable for new energy scene

The invention belongs to the technical field of distributed computing, and relates to a distributed computing resource dynamic scheduling method and system suitable for a new energy scene. According to the method, the priorities of the calculation tasks are obtained by carrying out priority division on the calculation tasks according to the task characteristics. And a distributed computing node resource pool is established, so that centralized management and flexible scheduling of computing resources can be conveniently realized. Performance indexes of all nodes in the resource pool are collected and monitored, and reasonable allocation and efficient utilization of resources can be achieved. And scheduling the calculation tasks based on the priorities of the calculation tasks and the performance indexes of the nodes, generating a scheduling strategy, and ensuring that the tasks with high priorities preferentially obtain the calculation resources so as to meet the requirements on the task execution sequence in a new energy scene. And the scheduling strategy is adaptively optimized according to the performance index of each node, so that the utilization rate of resources and the stability of the system are improved. According to the method, the priority of the calculation task can be dynamically adjusted according to the characteristics of a new energy scene, and flexible scheduling of calculation resources is realized.
Owner:HUANENG NINGXIA ENERGY CO LTD LINGWULONGQIAO BRANCH +2

Tire vulcanization workshop intelligent flexible scheduling method and system oriented to dynamic disturbance

The invention belongs to the field of workshop dynamic scheduling, and provides a dynamic disturbance-oriented tire vulcanization workshop intelligent flexible scheduling method and system, and the method comprises the steps: building a production scheduling model with the minimization of the maximum completion time as an optimization target; obtaining an initial processing sequence and a selectable machine set of each workpiece process, and solving by taking the production scheduling model as a target function to obtain an optimal initial scheduling scheme; when a dynamic event occurs in the production process, detecting the type of the dynamic event and the occurrence time of the event, and extracting a completed process, a processing process and an unstarted process; and determining a to-be-scheduled process based on the influence of the dynamic event on the processing process and the unstarted process, retaining the process processing sequence of the optimal initial scheduling scheme, updating the optimal processing machine of the to-be-scheduled process, and generating a rescheduling scheme. The device only replaces a machine in an unprocessed process, is embedded into a cooling time buffer area between the same workpiece processes, solves the problem of insufficient cooling of the rubber material, and guarantees the quality and process stability.
Owner:QINGDAO UNIV OF SCI & TECH

Building integrated energy system optimization scheduling model and method giving consideration to comfort level of light storage soft environment

The invention discloses a building integrated energy system optimization scheduling method giving consideration to the comfort level of a light storage soft environment, and relates to the field of building energy system optimization scheduling, and the method comprises the steps: building a photovoltaic output uncertainty model based on Beta distribution according to typical daily solar radiation intensity data; secondly, constructing an energy storage model; thirdly, a comfort level quantitative model considering temperature regulation and control of the indoor air conditioner and the electric water heater is constructed, and the influence on the environmental comfort level is reflected laterally; and finally, according to the various formed models, constructing a building integrated energy system optimization scheduling model considering the light storage soft comfort degree, and performing solving based on a mixed integer linear programming method. The environment comfort level of the building integrated energy system can be quantified, the flexibility of the building integrated energy system is improved by introducing photovoltaic and energy storage equipment, flexible scheduling of load resources is facilitated, peak load shifting is better achieved, the operation cost of the building integrated energy system is reduced, and the operation efficiency of the building integrated energy system is improved.
Owner:STATE GRID CHONGQING ELECTRIC POWER CO ELECTRIC POWER RES INST +2

Digital twin system construction method and system based on flexible job shop scheduling

The invention discloses a digital twinning system construction method and system based on flexible job shop scheduling, and relates to the technical field of digital twinning, and the method specifically comprises the steps: constructing a twinning model of a physical workshop according to the production data of the physical workshop; building a workshop scheduling discrete event simulation model based on the twinborn model of the physical workshop; based on an internal and external virtual-real interaction mechanism, virtual-real mapping interaction between the twin model of the physical workshop and the physical workshop and virtual-real mapping interaction between the twin model of the physical workshop and the workshop scheduling discrete event simulation model are realized, and a virtual workshop is generated; data generated in the interaction process is stored in a twin data pool in real time; a workshop service system is constructed based on a three-dimensional visual integration technology, so that a physical workshop and a virtual workshop carry out interactive feedback, and construction of a scheduling digital twin system is completed. According to the method, the self-adaptive capability of the system in the face of complex production tasks is enhanced, and flexible scheduling according to actual conditions is supported.
Owner:XINJIANG UNIVERSITY

Method for establishing energy storage scheduling model of multi-node optical storage direct-flexible system

The invention relates to the technical field of optical storage direct-flexible scheduling, and discloses a method for establishing an energy storage scheduling model of a multi-node optical storage direct-flexible system. The method comprises the following steps: acquiring real-time operation data of each node of a system, including a photovoltaic output fluctuation curve, an energy storage charge state, a load demand time sequence, a power grid interaction power limit value and an environmental irradiance change characteristic, and performing multi-dimensional alignment processing on the real-time operation data to form a multi-dimensional operation data set; performing operation state mapping topology construction processing on the data set, and separating out target operation data and state indication data; based on the target operation data, in combination with scheduling priority configuration information of each node, generating a multi-node collaborative energy storage scheduling initial model containing an energy storage charging and discharging time sequence strategy and a power distribution scheme; and identifying node operation abnormal characteristics based on the state indication data, dynamically reconstructing the initial model according to the node operation abnormal characteristics, and outputting the updated energy storage scheduling model to guarantee stable and efficient operation of the system.
Owner:CCCC FOURTH HIGHWAY ENG CO LTD +1

Dynamic scheduling method for new energy station load

The invention provides a dynamic scheduling method for new energy station loads, which relates to the technical field of new energy power generation, and comprises the steps of collecting power generation data and equipment operation state data, calling power grid load demand data and power grid operation parameters, building a comprehensive prediction model according to station historical data in combination with a neural network algorithm, and carrying out dynamic scheduling on the new energy station loads. The comprehensive prediction model comprises a power generation power prediction model and a load demand prediction model, inputting the power generation data, the equipment operation state data, the power grid load demand data and the power grid operation parameters into the comprehensive prediction model, performing power generation capacity prediction and load demand prediction, and performing dynamic scheduling based on a power generation capacity prediction result and a load demand prediction result. The technical problems of power grid power imbalance and resource waste caused by the fact that load scheduling is difficult to adapt to the power generation characteristics of the new energy station in the prior art are solved. The technical effects of realizing flexible scheduling of the load of the new energy station and effectively balancing the generated power of the new energy station and the load demand of the power grid are achieved.
Owner:CHINA DATANG GRP TECH INNOVATION CO LTD

Virtual power plant system integrating multiple resources and flexible scheduling method thereof

The invention discloses a virtual power plant system integrating multiple resources and a flexible scheduling method of the virtual power plant system, and relates to the technical field of virtual power plant management. Analyzing photovoltaic fluctuation characteristics, energy storage response capability indexes and stability indexes of the load power data corresponding to various types of data, and performing normalization processing; establishing a resource interaction tensor based on the collected data, fusing the power grid frequency deviation and the line load, and constructing a collaborative optimization model containing time delay compensation; updating the power grid frequency and the line load rate with a fixed time window, dynamically solving the collaborative optimization model, and outputting a load regulation quantity and an energy storage target scheduling instruction; and obtaining the power grid impedance characteristics and load distribution parameters of the area to be loaded with the control instruction, analyzing the scene deviation degree of the area, and correcting the scheduling value based on the scene deviation degree. The scheduling precision is improved, and the complex power grid compatibility is improved.
Owner:JIANGSU HOPERUN ZHIRONG TECH CO LTD

Marine oil spill emergency resource scheduling method and system based on improved ant colony algorithm

The invention provides a marine oil spill emergency resource scheduling method and system based on an improved ant colony algorithm, and relates to the technical field of data processing.The method comprises the steps that on the basis of a modified path transition probability function, multi-target ant colony collaborative optimization is executed on a dynamic resource scheduling architecture, a population is initialized to construct a scheduling path solution, and the scheduling path solution is optimized; calculating a time consumption target and an ecological loss target, iteratively updating pheromone distribution until convergence, and generating a multi-agent non-dominated scheduling strategy; according to a multi-agent non-dominated scheduling strategy, calculating a resource scheduling failure condition probability and an ecological sensitive area damage expected value; and if the scheduling failure conditional probability exceeds a risk tolerance threshold value, an ecological damage expected value is taken as a nonlinear penalty weight, and an anti-disturbance rescheduling mechanism is triggered to generate a flexible scheduling strategy. According to the method, the timeliness and accuracy of emergency resource transportation are improved, and collaborative optimization of'emergency efficiency-ecological protection 'is realized.
Owner:MINJIANG UNIVERSITY

Beam report reporting method and related device

The embodiment of the invention provides a beam report reporting method and a related device. The reporting method comprises the following steps: sending a first message comprising a beam report, first information and second information; and if the timing duration after the first message is sent is greater than or equal to the first duration or greater than or equal to the second duration, releasing the QCL. The first information in the first message is used for indicating the QCL of the reference signal in the beam report stored by the terminal, and the network equipment can determine the beam to which the QCL stored by the terminal belongs based on the first information so as to carry out adaptive scheduling, so that the adaptive beam scheduling capability is enhanced. The second information in the first message can indicate the effective duration of the QCL, and the network device further determines the effective storage duration of the QCL, thereby facilitating flexible scheduling. The terminal releases the QCL, so that invalid occupation of memory resources caused by the fact that the QCL does not work and is not released can be avoided.
Owner:HONOR DEVICE CO LTD

Cloud resource elastic scheduling optimization method based on reinforcement learning

The invention relates to the technical field of cloud computing, and discloses a cloud resource flexible scheduling optimization method based on reinforcement learning, and the method comprises the steps: obtaining the dynamic demand data of tasks in a cloud computing platform, including but not limited to the type, priority, historical resource consumption, current system load and other information of the tasks; carrying out modeling on the obtained task; carrying out cloud resource scheduling by adopting a reinforcement learning algorithm; and a scheduling strategy is optimized through a feedback mechanism, and multi-objective optimization scheduling is realized by updating a state-action value function. According to the method, the dynamic demand data of the tasks in the cloud computing platform are acquired, the state space and the action space of the tasks are defined, the cloud resource scheduling strategy is optimized through the reinforcement learning algorithm, and the task scheduling is dynamically adjusted through the multi-dimensional reward function, so that the task allocation can be intelligently optimized under the real-time task load and resource constraint, and the task scheduling efficiency is improved. The resource utilization efficiency is improved, the task response time is shortened, and the system energy consumption is reduced.
Owner:CHINA UNIV OF GEOSCIENCES (BEIJING)

Space-time price-based computing power and power space-time collaborative flexible scheduling method and device

The invention discloses a space-time price-based computing power and electric power space-time collaborative flexible scheduling method and device, and relates to the technical field of electric power systems, and the method comprises the steps: obtaining the architecture and operation characteristics of a data center, pre-establishing an energy consumption model and a load scheduling model of the data center, and pre-establishing a computing power-electric power collaborative regulation double-layer optimization model, the calculation power-electric power coordinated regulation double-layer optimization model is based on an energy consumption model and a load scheduling model of the data center, takes the initiative of the data center as an independent operator and the influence of the load of the data center on the electricity price of the system into consideration, and is constructed by taking the data center as a decision-making main body; a lower-layer power grid direct current optimal power flow problem is converted into a KKT condition to serve as a constraint to be substituted into an upper-layer problem, a strong dual theorem and a Big-M method are utilized to linearize and solve the double-layer optimization model of computing power-power coordinated regulation, and a computing power-power space-time coordinated flexible scheduling result is obtained.
Owner:SOUTHEAST UNIV +2

Multi-data center flexible scheduling method

The invention relates to a multi-data center elastic scheduling method, which comprises the following steps of: establishing a data center polymer (DCA) to integrate the space-time regulation potential of a dispersed data center, establishing a comprehensive model covering dynamic migration of a working load, power consumption regulation and control of a DVFS (Distributed Valve File System) and collaboration of an optical storage system, and adopting a double-layer elastic scheduling architecture, energy storage charging and discharging, photovoltaic output and other hyperopia actions are optimized to improve long-term decision robustness; and the lower layer solves short view actions such as server scheduling and load distribution in real time based on mixed integer linear programming to realize instant cost optimization, so that power-computing power collaborative scheduling optimization of the data center is realized. According to the method, flexible scheduling of time delay sensitive type and time delay tolerant type workloads is combined, the cooperative effect of an energy storage system and photovoltaic power generation is utilized, the power use efficiency and economical efficiency of the data center are optimized, and dynamic participation of multiple data centers in the power market is achieved.
Owner:SHANGHAI JIAOTONG UNIV

Glass factory load low-carbon regulation and control method considering capacity compensation and carbon quota

The invention discloses a glass factory load low-carbon regulation and control method considering capacity compensation and carbon quota, and aims to realize refined carbon emission control and flexible scheduling in the production process of a glass factory. By fusing multi-dimensional input of historical load power, load change rate, environment temperature, humidity, wind speed, electricity price, time and the like and utilizing an STFormer architecture to model a complex time dependency relationship, a kilowatt-hour electricity carbon emission factor in a future time period is predicted, and prior information is provided for low-carbon scheduling; with minimization of carbon emission and electric charge cost and maximization of capacity income as targets, a future load scheduling strategy is optimized under constraints of carbon quota, an electric power regulation range and equipment operation; and globally searching an optimal load control scheme through a quantum particle swarm algorithm, and generating a multi-scene-oriented dynamic regulation and control strategy under the constraints of a multi-target fitness function and a penalty mechanism. The method not only improves the precision and robustness of carbon factor prediction, but also realizes flexible scheduling of the glass factory load driven by carbon economy.
Owner:LIYANG RES INST OF SOUTHEAST UNIV +1

Flexible scheduling conveying line process control method and device and terminal equipment

The invention relates to a flexible scheduling conveying line process control method and device and terminal equipment. The method comprises the steps that process machining data of a machining process where a tray in a machining production conveying line is located is obtained, and process line body configuration parameters of the machining process corresponding to a machined product are obtained from a warehouse management system; the procedure processing data and the procedure line body configuration parameters are matched and screened to obtain a plurality of line body paths, corresponding line body configuration data are obtained from each line body path, and the line body configuration data comprise priorities, cache bits and current remaining caches; sorting all the line body configuration data by adopting a cache priority principle to obtain a line body path with the minimum cache bit and the closest distance, and extracting target point data from the line body path; according to the target point data, the processing production conveying line is controlled to convey the tray to the next destination, and accurate control and distribution of products are achieved; the problem that trays of an existing workshop cannot be distributed in real time according to product information in the conveying line circulation process is solved.
Owner:GUANGDONG LYRIC ROBOT INTELLIGENT AUTOMATION CO LTD +1

Federal learning-driven computing power elasticity scheduling method

The invention relates to the technical field of public transportation systems, and particularly discloses a federated learning-driven computing power flexible scheduling method, which comprises the following steps: S1, dynamic computing power perception: monitoring a computing power index of federated learning participation equipment in real time, and generating a dynamic resource vector; s2, elastic fragment generation: according to the dynamic resource vector, splitting a global federal model into differentiated sub-model fragments; s3, adaptive scheduling: dynamically allocating sub-model fragments to matched equipment based on equipment computing power fluctuation and fragment calculation complexity; s4, federal training is executed, wherein the device carries out local training on the distributed sub-model fragments, and local gradient updating is generated; and S5, incremental aggregation updating. According to the method, through full-process optimization of dynamic perception, elastic fragmentation, intelligent scheduling and safe aggregation, efficient utilization of computing power resources, adaptive allocation of tasks and enhanced protection of data privacy in a federated learning scene are realized, and the performance and robustness of a distributed machine learning system are remarkably improved.
Owner:BEIJING SHUDAO INTELLIGENT COMPUTING TECHNOLOGY CO LTD +2

A service scheduling and deployment method for resources of an internet of things edge computing node

The application relates to a service scheduling and deployment method for Internet of Things edge computing node resources, which is realized based on an Internet of Things edge computing system. The system comprises a cloud data center, a convergence layer core network and a plurality of access layer switch networks connected in sequence. Each access layer switch network is in communication connection with a plurality of edge computing nodes, and each edge computing node is in communication connection with a plurality of data acquisition terminals. The application comprehensively considers the current running state of the edge computing system, network delay problems and running results after deployment, and performs service scheduling and deployment of Internet of Things edge computing node resources on each real-time data stream computing application. The application is suitable for the decision environment of the real-time computing task load and bandwidth dynamic change of the Internet of Things edge computing node, realizes global optimization from the system level, takes into account the single node load capacity, and realizes the optimal scheme and application planning and deployment decision suggestion of the long-period stable operation and real-time task flexible scheduling strategy.
Owner:SHENZHEN POWER SUPPLY BUREAU

Power grid flexible control and optimal scheduling system for distributed energy access

The invention relates to the technical field of intelligent scheduling, in particular to a distributed energy access-oriented power grid flexible control and optimal scheduling system, which comprises a dynamic sensing module, a prediction correction module, a flexible scheduling module, a self-adaptive control module and a collaborative traceability module. In the scheme, the dynamic sensing module of the system can capture fine fluctuation of distributed energy at high frequency, and second-level acquisition is started once the output change rate exceeds a certain range, which is far higher than the response speed of a traditional system. By means of the real-time and accurate sensing capacity, the system can rapidly capture energy at the initial stage of energy change, precious time is won for follow-up prediction and scheduling, it is ensured that the system closely follows the energy dynamic state all the time, the control force on distributed energy is greatly improved, the system can respond to various sudden changes in time, and the continuity of energy supply is effectively guaranteed.
Owner:吴景龙

Computing power task scheduling method and device based on new energy consumption and storage medium

The invention relates to a computing power task scheduling method and device based on new energy consumption and a storage medium. The method comprises the steps that a residual power output prediction curve is established according to historical output power data of at least one new energy power generation node and other load data taking power from the new energy power generation node, and the residual power output prediction curve is used for indicating residual output power data, which can be used for scheduling, of each new energy power generation node in a future preset time period; obtaining a task scheduling strategy of at least one computing power task based on the residual power output prediction curve; and based on the task scheduling strategy, controlling the computing power resource to execute at least one computing power task. According to the embodiment of the invention, the structural limitation of the load rigidity of the computing power center can be broken through, the computing power center side is taken as a leading view angle, the flexible scheduling of the computing power task facing the distributed new energy local consumption scene is realized, the light abandoning rate and the peak regulation pressure of the power grid are reduced, and the energy efficiency level and the green computing power of the operation of the computing power center are remarkably improved.
Owner:TSINGHUA UNIVERSITY

Method, system and device for flexibly scheduling network resources and medium

The invention relates to a network resource flexible scheduling method, system and device and a medium. The method is applied to a backbone transmission network and data network intelligent management and control system. The method comprises the following steps: disassembling network resources into a plurality of atomic power units in a virtualization layer, marking dynamic attribute tags for the atomic power units to obtain an atomic power library, and generating a trigger event when a real-time performance index exceeds a preset threshold value; according to the trigger event, the atomic power library and the alarm knowledge graph, carrying out combination optimization on the atomic power units to generate a resource combination scheme, and calling a three-dimensional topology model to carry out pre-verification on the resource combination scheme; and according to the execution scheme, carrying out capacity expansion and shrinkage operation on the atomic power unit through the virtualization layer, adjusting a load balancing weight based on real-time flow distribution, and generating a resource allocation result. According to the method, dynamic cooperative scheduling of network resources is realized, and the service quality and the operation efficiency of a backbone transmission network and a data network are improved.
Owner:STATE GRID HEBEI ELECTRIC POWER CO LTD +3

User side energy flexible scheduling management method and system

The invention belongs to the technical field of power dispatching. The invention provides a user side energy flexible scheduling management method and system. The method comprises the following steps: acquiring first electricity demand historical data and second electricity demand historical data of each user in a target area; performing prediction processing on the first electricity demand historical data by using a first prediction model to obtain a first predicted electricity demand; using a second prediction model to perform prediction processing on the second power consumption demand historical data to obtain a first power consumption demand fluctuation coefficient; and calculating a second predicted power consumption demand based on the first predicted power consumption demand and the first power consumption demand fluctuation coefficient, and determining an energy flexible scheduling management scheme according to the second predicted power consumption demand. According to the method, the historical electricity utilization rule of the user and the influence on fluctuation of the electricity price and the electricity supply and demand condition are considered at the same time, and the accuracy and rationality of the determined energy flexible scheduling management scheme can be remarkably improved.
Owner:JIAXING HENGCHUANG ELECTRIC EQUIP

APP micro-service intelligent arrangement and scheduling method and device based on fast application, and medium

The invention belongs to the technical field of micro-service scheduling, and discloses an APP micro-service intelligent arrangement and scheduling method and device based on a fast application, and a medium. The method comprises the following steps: firstly, performing feature extraction on equipment data to obtain feature data with high representativeness, secondly, creating an atomization service component and a service dependency relationship graph by splitting service instances, and then, on the basis of considering the dependency relationship among services, resource requirements, network bandwidth and service performance by adopting a multi-objective optimization algorithm, establishing an atomization service component and a service dependency relationship graph. And optimizing a scheduling decision, designing an alternative path and a service degradation scheme, establishing a service scheduling strategy, and finally realizing flexible scheduling of service instances based on the set service scheduling strategy. According to the method, the technical problems of insufficient resources, delay, service interruption and the like in a high-concurrency environment are effectively solved, and the performance and the reliability of the industrial APP in a complex environment are improved.
Owner:CHINA SOUTHERN POWER GRID COMPANY

Storm task scheduling method based on multi-agent deep reinforcement learning model

The invention belongs to the field of big data stream processing, and particularly relates to a Storm task scheduling method based on a multi-agent deep reinforcement learning model, which comprises the following steps of: simulating a Storm task scheduling environment, and reflecting dynamic changes of factors such as resource allocation, task scheduling and cluster load in an actual Storm cluster; according to the method, a near-end strategy optimization (PPO) algorithm based on an anti-fact strategy gradient (COMA) is adopted as a reinforcement learning model for training; a training stage centralization and execution stage decentralization method is adopted to ensure the real-time performance of Storm in actual operation. According to the method, maximization of the resource utilization rate and minimization of the resource use cost are taken as optimization objectives, and multi-agent deep reinforcement learning and task scheduling characteristics are combined, so that the Storm can obtain a more intelligent and flexible scheduling strategy when facing dynamic resources and workloads.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Scene-based random optimization method for micro-grid energy and flexibility scheduling

The invention provides a scene-based random optimization method for micro-grid energy and flexibility scheduling, and belongs to the technical field of micro-grid optimization scheduling. The method comprises the following specific steps: minimizing the expected cost of the micro-grid as a target; setting a power balance constraint in the micro-grid according to a relation among photovoltaic power generation capacity, power load power consumption, battery energy storage charging and discharging power and power loss in the micro-grid internal transmission and conversion process in the micro-grid; determining a flexible service constraint of the micro-grid according to the flexible service model and the battery energy storage model; predicting and updating by using a rolling time domain method, modeling uncertainty of the micro-grid by combining scene generation and scene reduction technologies, determining a day-ahead prediction error of the micro-grid, and constructing a random optimization model of energy and flexibility of the micro-grid; based on a flexible intra-day framework, solving a random optimization model of micro-grid energy and flexibility according to a scene at different time stages, and obtaining a flexible scheduling strategy; meanwhile, the stability and efficiency of the micro-grid are considered.
Owner:SHENYANG UNIVERSITY OF TECHNOLOGY

Heater assembly line flexible scheduling method based on production data

The invention relates to the field of intelligent manufacturing and production scheduling, and discloses a heater assembly line flexible scheduling method based on production data, and the method comprises the steps: S1, obtaining the production data of a heater assembly line and corresponding environment parameters; initializing an assembly line scheduling constraint condition; wherein the assembly line scheduling constraint condition is used for defining a processing time range, an equipment load threshold value and a material supply period reference value allowed by each process in the heater assembly process; s2, if the environmental parameters exceed a preset safety threshold, dynamically correcting the real-time production data according to the environmental parameters to obtain corrected real-time production data; wherein the environment parameters comprise temperature, humidity and air cleanliness, the scheduling effect evaluation model and the association rule mining algorithm are introduced, the production efficiency improvement rate, the equipment failure rate reduction degree, the material waste reduction amount and the like can be quantitatively evaluated, and the influence relation of the key equipment operation parameters on the scheduling effect is mined.
Owner:YUYAO XINYU HVAC EQUIPMENT CO LTD

Task scheduling method and device, electronic equipment and storage medium

Embodiments of the present application relate to a task scheduling method and apparatus, an electronic device and a storage medium, applied to a resource pool having multiple tenants, where a task queue corresponding to each tenant is configured with a minimum resource limit and a maximum resource limit, a difference between the maximum resource limit and the minimum resource limit is an elastic resource limit of the task queue, and the maximum resource limit is an elastic resource limit of the task queue. Comprising the steps that priority information of a next to-be-executed task in a target task queue and current available resource information of the target task queue are obtained, the priority information comprises a high priority or a low priority, and the current available resource information comprises available resources in a minimum resource limit and available resources in an elastic resource limit; or no available resource exists in the maximum resource limit; and based on the priority information of the next to-be-executed task and the current available resource information of the target task queue, performing resource elastic scheduling on the next to-be-executed task. The task throughput and the resource utilization rate of the scheduling system can be improved in an elastic scheduling mode.
Owner:MOMENTA (SUZHOU) TECHNOLOGY CO LTD

Multi-time-scale low-carbon flexible scheduling method based on integrated energy system

A multi-time-scale low-carbon flexible scheduling method based on an integrated energy system comprises the following steps: constructing a day-ahead scheduling robust optimization model, and based on a worst scene set of renewable energy output and flexible adjustment requirements, solving to obtain an optimal operation interval of equipment and power interacting with a superior energy network; simulating and generating the worst scene of the output and flexible adjustment requirements of the wind and light generator set by taking the optimal operation interval of the equipment and the interaction power of the superior energy network as constraint conditions; the minimum operation cost of the integrated energy system is taken as an optimization target, and the actual scheduling value and the upward / downward flexible adjustment capacity of each device in the park are determined according to the optimal operation interval of the device and the interaction power of the device and the superior energy network as constraint conditions and the worst scene of the output and flexible adjustment demand of the wind and light generator set. And constructing an intra-day scheduling model, and performing single-period optimization in each scheduling period according to the optimization solution result of the day-ahead scheduling robust optimization model and the actual observation value of the uncertainty factor. According to the method, the flexible resources of the integrated energy system can be reasonably distributed between energy and flexible adjustment services, and meanwhile, an efficient scheduling strategy which reasonably balances operation economy, low-carbon performance and flexibility is formulated by considering the carbon transaction cost on the carbon transaction market.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Cluster computing resource allocation method

The invention discloses a cluster computing resource allocation method. The method supports three resource service forms of a virtual machine, a container cloud and a bare computer. Wherein the virtual machine resources are used for deploying system software with a UI (User Interface) and a C / S (Client / Server) architecture; the container cloud resource is used for deployment of system software of a B / S architecture and operation of a large test sample; the bare computer resources are used for specific function system software, Kafka middleware and / or database deployment; and service computing resource elastic scheduling and control are deployed to realize cluster computing resource allocation. According to the method, multiple resource service forms are flexibly adopted, and virtual cluster management and high-availability design are applied, so that test resource automatic deployment strategy generation and computing resource flexible scheduling and control can be realized, and high-performance, high-reliability, servitization and easy-to-use cluster computing resource allocation and deployment services are provided for users.
Owner:NAT INNOVATION INST OF DEFENSE TECH PLA ACAD OF MILITARY SCI

Green electricity hydrogen ammonia flexible scheduling method and system considering wind and light output correction

The invention discloses a green electricity hydrogen ammonia flexible scheduling method and system considering wind and light output correction, and relates to the technical field of energy power, and the method comprises the steps: setting the uncertainty of wind and light output prediction, and correcting the wind and light output prediction; determining a wind and light output prediction value participating in a scheduling algorithm; equally dividing a time period in which a scheduling instruction and a predictive variable need to be given into M small sections; determining a decision variable and an optimization interval; performing iterative optimization on the target function; calculating the power of the electrolytic cell at all time points in the corresponding iteration period; for each iteration period, calculating constraint variables of all time points in the scheduling period; judging whether the constraint variable meets a constraint condition or not, and obtaining an alternative set; and taking a decision variable corresponding to the minimum target function from the alternative set as an optimization result. According to the method, segmented optimization is carried out on the time period in which the scheduling instruction needs to be given, the optimization speed of the algorithm is improved, green hydrogen production is safe and stable, and economical and reliable operation is achieved.
Owner:CHINA ENERGY CONSTR HYDROGEN ENERGY CO LTD +1

Mining equipment intelligent manufacturing production scheduling optimization system and method

The invention relates to the technical field of data reasoning, and discloses a mining equipment intelligent manufacturing production scheduling optimization system and method.The system comprises a topological graph generation module, an initial scheduling Gantt chart generation module, a demand strength coefficient acquisition module, a flexible scheduling Gantt chart acquisition module and a final scheduling instruction set generation module; constructing a topological graph based on the process relation of the mining equipment; generating an initial scheduling Gantt chart by taking the part task set as a longitudinal axis and the corresponding general assembly line task sequence as a transverse axis; when a disturbance event occurs, an affected process dependence tree is extracted, task delay cost is evaluated, and a requirement strength coefficient for rescheduling in the manufacturing process is output; generating a flexible scheduling Gantt chart based on the process beat deviation and the equipment utilization rate in the synchronous adjustment manufacturing process; determining a final scheduling instruction set through process path dynamic correction and process optimization results; the efficiency of the mining equipment manufacturing and production process scheduling scheme can be improved.