The invention mainly relates to the technical field of quick
satellite earth observation, in particular to a method for realizing
hybrid and active scheduling on quick satellites. The method comprises the following steps: S1, generating an initial
flexible scheduling plan: alternately performing
heuristic search and constraint propagation until
processing on all tasks is completed, wherein the
resource allocation problem is solved by the
heuristic search, and the activity
start time range is reduced by the constraint propagation; S2, performing
hybrid and active adjustment on the scheduling plan: performing scheduler underlayer
processing by utilizing the minimum disturbance updating method of the constraint propagation when the task observation
start time, the activity duration and the activity observation posture are adjusted; performing adjustment on a task
observation time window and
insertion of tasks, which are not arranged, by utilizing the
heuristic search method for inserted tasks. The method for realizing the
hybrid and active scheduling on the quick satellites, disclosed by the invention, is simple in operation, high in flexibility and easy to realize, and can be applied under the complicated background that the multiple quick satellites are scheduled.