Transverse tunnel cover method for shallow-buried underground excavation large underground space construction

A technology for underground space and shallow buried underground excavation, which is applied to underground chambers, shaft equipment, wellbore lining, etc., and can solve the problems of pipe curtain construction accuracy, joint joint process and high joint strength requirements, and it is impossible to open up the construction work surface. High precision requirements and other issues, to achieve the effect of clear force transmission, low construction precision requirements, and low construction risk

Active Publication Date: 2015-08-26
BEIJING GENERAL MUNICIPAL ENG DESIGN & RES INST +1
View PDF9 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Its disadvantages are that, firstly, compared with CN103485790A, although the number of pipe curtains is effectively reduced, because the length of pipe curtains is still relatively large, the construction precision is high, and more construction work surfaces cannot be opened up, and the construction efficiency is low; Second, the load-carrying capacity of the pipe curtain is controlled by the occlusal joints between the pipe curtains, which has extremely high requirements on the construction accuracy of the pipe curtains, the articulation of the joints, and the strength of the joints; third, it is controlled by the strength of the joints between the pipe curtains. In this method, the underground space Structures can only be implemented in reverse

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transverse tunnel cover method for shallow-buried underground excavation large underground space construction
  • Transverse tunnel cover method for shallow-buried underground excavation large underground space construction
  • Transverse tunnel cover method for shallow-buried underground excavation large underground space construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] According to the present invention, a kind of horizontal hole cover method for the construction of large-scale underground space under shallow buried excavation, the construction steps are as follows:

[0059] On the top of the side wall of the proposed underground space, the foundation pit or pilot hole is arranged longitudinally along the underground space, and a rigid layer above the roof of the proposed underground space is formed at one time through non-excavation techniques (such as pipe jacking method, horizontal drilling rig, etc.) Controllable temporary lateral force structure, and connected with the piles in the foundation pit or pilot tunnel to form a temporary lateral roof-pile bearing system, under the protection of the lateral roof-pile bearing system, it can be operated in a forward or reverse direction Span or multi-span, single-layer or multi-layer underground space structure.

[0060] The first construction steps of the present invention are as follows...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a transverse tunnel cover method for shallow-buried underground excavation large underground space construction. Foundation pits or pilot tunnels are formed, in the longitudinal direction of underground space, of the tops of side walls of the underground space to be constructed, temporary transverse stress structures are formed inside the foundation pits or the pilot tunnels at a time and located above a top plate of the underground space to be constructed and are controllable in rigidity, the temporary transverse stress structures are connected with piles inside the foundation pits or the pilot tunnels to form a temporary transverse top cover-pile bearing system, and under protection of the transverse top cover-pile bearing system, a single-span or multi-span and a single-layer or multi-layer underground space structure can be constructed in a sequential construction mode or in an inverse construction mode. In shallow-buried underground excavation large underground space structure construction, ground settlement is effectively controlled, constructed building deformation is reduced, the construction risks are reduced, the construction period is shortened, and the construction cost is lowered.

Description

technical field [0001] The invention relates to the technical field of underground construction engineering, in particular to a construction method suitable for shallow burial and underground excavation of large-scale underground spaces-the horizontal hole cover method. Background technique [0002] At present, the main idea of ​​the construction method widely used in the construction of shallow buried and underground excavation large-scale underground space is to divide the proposed underground space into several small sections or pilot tunnels horizontally. Excavate the longitudinal cavern, construct the temporary horizontal support structure or the top horizontal load-bearing structure in time, and then repeat the above steps until the individual horizontal temporary support structures or the top horizontal load-bearing structure can be connected as a whole to form a temporary horizontal cross-section of the underground space. The support system or the top lateral load-be...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/10E21D11/38
Inventor 张晋毅赵子寅惠丽萍高辛才陈鹤易建伟李名淦闫朝涛
Owner BEIJING GENERAL MUNICIPAL ENG DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products