Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power transmission and transformation project construction field management system

A technology for engineering construction and on-site management, applied in data processing applications, instruments, resources, etc., can solve problems such as the inability to effectively determine the arrival, work, and slack of project employees, the inability to effectively supervise the driving status of vehicles, and the lack of real-time supervision and management.

Inactive Publication Date: 2016-10-05
SICHUAN SHUNENG ELECTRIC POWER CO LTD
View PDF4 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this method cannot effectively determine whether the project employees arrive at work, work, whether they are slow to work, and whether the employees are off duty; in addition, it cannot effectively monitor the driving status of vehicles
Moreover, the collection and management of the above-mentioned information has a certain lag, and it is not real-time supervision and management. Even if the method of reading the work report is adopted, it is difficult to grasp the progress of the project and make effective decisions based on the report alone.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power transmission and transformation project construction field management system
  • Power transmission and transformation project construction field management system
  • Power transmission and transformation project construction field management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] In order to make the technical means and implementation objectives of the present invention more understandable, the present invention will be further described below in conjunction with specific embodiments.

[0021] The requirements of the hardware system applied in the present invention are as follows: smart phone: camera, GPS chip, and more than 1G memory. Server: CPU dual-core above 2.5GHz, memory above 2GB, hard disk above 10G. Mobile terminal: support Android 4.0 and above systems. Server side: Windows2003 or above. PC side: Support browser access such as IE8+, Chrome, Firefox, Opera, etc.

[0022] First, the present invention receives message notifications through the Internet, and uploads engineering information such as on-site photos, work logs, and on-site videos from each operation site terminal on the construction site to the server for storage. After receiving the above information, the server quickly locates, filters and saves the contents of the ma...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a power transmission and transformation project construction field management system. The process for implementing the system includes the following steps that: a construction party logins the system through a client end, authentication verification is performed on the construction party, if the construction party passes the authentication verification, the construction party is allowed to login the system; after the construction party logins the system successfully, the construction party checks messages, notices, upload field photos, work logs and field videos and scan a two-dimensional code to carry out attendance check; after a driver logins a client end, a vehicle positioning function is automatically enabled; a project administrator logins the project management system so as to query and manage construction progress; and after receiving information, construction personnel execute feedback operation in the system and accept the supervision of the project administrator. With the power transmission and transformation project construction field management system of the invention adopted, problems in supervision on the working conditions of the construction personnel and the use of vehicles in a construction field can be reasonably solved, so that the project administrator can have a good understanding of a whole construction process and the construction progress, and the improvement of the progress and quality of a project can be benefitted, and the scheduling of project personnel is more reasonable.

Description

technical field [0001] The invention belongs to the technical field of computer software, and relates to a method for managing project progress quality and personnel and vehicles based on BS architecture, that is, a construction site management system for power transmission and transformation projects. Background technique [0002] In the past, the work site of power transmission and transformation project construction required project information such as work logs, project photos, diagrams, etc. In order to grasp the progress of each construction operation, the method of browsing the progress of the project at each work site was generally used. However, this method cannot effectively determine whether the project employees arrive at work, work, whether they are slow to work, and whether the employees leave their posts; in addition, it cannot effectively monitor the driving conditions of the vehicles. Moreover, the collection and management of the above-mentioned information...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 王晓刚
Owner SICHUAN SHUNENG ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products