Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Project management method, platform and device, computer equipment and storage medium

A technology for project management and engineering projects, applied in the field of devices, project management methods, computer equipment and storage media, and platforms, can solve problems such as information fragmentation, difficulty in combining actual project management systems, and difficulties in implementing refined engineering management

Active Publication Date: 2020-08-28
中铁建华南建设有限公司 +1
View PDF5 Cites 37 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the existing BIM-based project management systems generally lack systemicity and dynamic continuity. The data generated by software from different manufacturers is difficult to inherit, transfer and share, and it is difficult to integrate with the actual project management system, making it difficult to implement refined project management. Created new information fragments and information islands

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management method, platform and device, computer equipment and storage medium
  • Project management method, platform and device, computer equipment and storage medium
  • Project management method, platform and device, computer equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present application, and are not intended to limit the present application.

[0045] The project management method provided by this application can be applied to such as figure 1 shown in the application environment. Among them, the server 101, the terminal 102, the terminal 103 and the cloud computing center communicate through the network. Among them, the server 101 can be implemented by an independent server or a server cluster composed of multiple servers. The server 101 can be a project management platform or an Internet of Things server, which is dedicated to communications such as access control gates, camera equipment, and positioning cards...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a project management method, platform and device, computer equipment and a storage medium. The method comprises the following steps: enabling a server to obtain map information of the engineering project according to the obtained map information of the engineering project and a total construction period plan; obtaining a building information BIM model and a construction plan of the sub-project; generating a target construction organization corresponding to the engineering project including the personnel information, the material information and the equipment information; and according to the target construction organization, obtaining a corresponding dispatch list, sending the dispatch list to the corresponding construction party equipment, receiving feedback information of the dispatch list sent by the construction party equipment, and completing quality acceptance of the engineering project according to the feedback information of the dispatch list. Accordingto the method, the legality of engineering construction is restrained through the dispatch list, the risk of safety production is reduced, the control of the server on the whole construction period target is realized, a collaborative environment is provided for BIM application corresponding to a total engineering project through the 4D information model with a compatible data integration interface, and the problem of information isolated island is avoided.

Description

technical field [0001] The present application relates to the technical field of building construction, in particular to a project management method, platform, device, computer equipment and storage medium. Background technique [0002] In recent years, my country's urban rail transit construction has developed rapidly. For example, a large number of subway projects have increased investment, tighter construction schedules, and higher requirements for operation and maintenance management, which has brought new challenges to project management, especially General contracting project management. The general contracting mode of large-scale projects is more complicated than the project management of traditional small-tender projects. How to correctly fulfill the supervisory responsibility of safety production and reduce safety risks; High-quality projects and realizing the digital transfer of the whole process are all difficult problems facing the general contractor of the proj...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06F16/25
CPCG06Q10/06314G06Q10/0633G06Q10/06395G06Q10/103G06Q50/08G06F16/252
Inventor 陈前王玮梅志强魏章俊何敏邹永红刘博苏雪冬梁兴朴喻国军周智章邦超云强
Owner 中铁建华南建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products