Project progress supervision system based on BIM

A monitoring system and construction progress technology, applied in the field of BIM-based engineering progress monitoring system, can solve the problems of strong theory and not fully utilizing the application value of BIM, and achieve the effect of ensuring the construction progress

Pending Publication Date: 2020-07-03
陕西工业职业技术学院
View PDF14 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The research and application of BIM technology in my country is still in the transitional stage of the preliminary exploration stage. There are few BI

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project progress supervision system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] In order to make the objects and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0030] Such as figure 1 As shown, the embodiment of the present invention provides a BIM-based project progress monitoring system, including:

[0031] The construction plan management module is used to formulate the project construction schedule according to the approved construction route coordinates;

[0032] BIM model building module, with CATIA as the core modeling software, imports the approved construction line coordinates into CATIA, generates space curves and encrypts control points, draws a two-dimensional building diagram corresponding to each construction node based on the space curve according to the construction drawings, and Crea...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project progress supervision system based on BIM. The system comprises a construction plan management module, a BIM model construction module, a construction plan and actualprogress comparison module and a construction progress supervision module. The construction progress supervision module is used for actively identifying deviation data of the construction plan and theactual progress, carrying out deviation data analysis, finding out a specific reason for deviation and related responsible personnel information, and outputting a corresponding construction progressadjustment measure according to the specific reason for deviation analysis. The building construction progress can be visually reflected, meanwhile, the system has the function of comparing the actualconstruction progress with the construction plan, the cause of construction deviation can be found in time, and therefore efficient supervision of the building construction progress is achieved.

Description

technical field [0001] The invention relates to the field of project progress management, in particular to a BIM-based project progress monitoring system. Background technique [0002] With the development of my country's construction industry, the proportion of the output value of the construction industry in the GDP has increased year by year, and due to the continuous improvement of the construction science and technology level, the scale and structure of the project itself have increased, and the owner has put forward higher requirements for the construction progress. requirements. Construction schedule management is an important content in the field of engineering project management, which directly affects the normal operation of the engineering project and is related to the economic and social benefits of the project. [0003] Judging from the current software development, many problems in the field of schedule risk early warning cannot be solved only by relying on t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06F30/13G06T11/20
CPCG06Q10/103G06T11/206
Inventor 宋祥张喆
Owner 陕西工业职业技术学院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products