BIM technology-based railway large-span continuous beam swivel construction management and control method

A large-span, construction management technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as complex construction, large uncertainties, and difficulties, and achieve the effect of facilitating scheme optimization

Active Publication Date: 2020-04-17
CHINA RAILWAY 19TH BUREAU GRP 1ST ENG +1
View PDF7 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, my country's railway BIM technology is in the initial stage. The progress of science and technology has promoted the continuous improvement and improvement of my country's transportation capacity. As an important part of transportation, bridges have made great progress in bridge swivel construction in recent years, and construction methods have also become di...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM technology-based railway large-span continuous beam swivel construction management and control method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] refer to figure 1 , this embodiment is based on the BIM technology management system for the construction of the Beijing-Xiong Intercity Railway across the Langzhuo Expressway (72+128+72) m swivel continuous beam construction. The system includes comprehensive management, technical management, progress management, cost management, Security management five modules.

[0042] The electronic sand table of the comprehensive management module uses the aviation oblique photography technology to integrate BIM and 3DGIS technology to form a three-dimensional electronic sand table. The scene of the sand table is basically the same as that of the construction site. Construction management personnel can check the environmental conditions of the construction site in front of the computer, which is convenient for program optimization and risk avoidance.

[0043] Technical management module 3D visualization technology clarification, using BIM technology to conduct 3D simulation const...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention, which belongs to the field of railway large-span continuous beam swivel informatization management, discloses a BIM-technology-based railway large-span continuous beam swivel construction management and control method, thereby solving a problem that fine management of bridge swivel site construction is difficult at present. And the comprehensive management comprises electronic sandtable on-site live-action viewing and comprehensive management three-dimensional visualization technology disclosure. Technical management comprises electronic sand table on-site live-action check, three-dimensional visualization technical disclosure and collision check. The progress management compares and analyzes the actual progress and the planned progress according to the compiled construction progress plan, and automatically calculates the lag construction period. And the cost management directly carries out statistics on the number of generated projects by using a built model. And the safety management is used for monitoring a swivel beam bracket and establishing association between a BIM model and equipment to form an information base of safety quality management. The method has advantages of assisting managers in effective decision making and fine management, and ensuring manageability and controllability of management factors such as construction plans, progress and quality.

Description

Technical field: [0001] The invention belongs to the field of information management of railway large-span continuous beam swivels, and in particular relates to a construction control method for large-span continuous beam swivels based on BIM technology. Background technique: [0002] In recent years, the application of information technology in the construction industry has developed rapidly, and BIM technology has been more and more popularized and applied in a large number of construction projects. [0003] At present, my country's railway BIM technology is in the initial stage. The progress of science and technology has promoted the continuous improvement and improvement of my country's transportation capacity. As an important part of transportation, bridges have made great progress in bridge swivel construction in recent years, and construction methods have also become diversified. The specific construction is very complicated and difficult. There is a certain degree of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D21/08G06F30/13
CPCE01D21/08
Inventor 卢孟凡王闪闪安明明姜旦杨玉林许爱军马俊段乾坤
Owner CHINA RAILWAY 19TH BUREAU GRP 1ST ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products