Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

59 results about "Time function" patented technology

Equipment maintenance fault intelligent analysis method and system based on Internet of Things

The invention relates to the technical field of the Internet of Things and artificial intelligence, and discloses an equipment maintenance fault intelligent analysis method and system based on the Internet of Things, and the method comprises the steps: representing an entity and a relation as a time function, and constructing a time sequence knowledge graph; monitoring vector change in the knowledge embedding space, detecting a concept drift phenomenon and mining an equipment performance evolution mode; constructing an equipment state transition model by using a recurrent neural network, predicting the future state of the equipment and evaluating the fault risk; collecting feedback processing knowledge conflicts and updating the model; generating multi-time-scale fault risk early warning and maintenance suggestions; according to the method, the knowledge acquisition efficiency is improved, dynamic knowledge support of the full life cycle of the equipment is provided, early recognition of gradient faults is realized, the method has adaptive knowledge updating capability, multi-dimensional fault analysis is provided, maintenance resource configuration is optimized, and the equipment management efficiency is improved.
Owner:SHAANXI LINKEZHI MASCH EQUIP CO LTD

Asynchronous service deployment method and device for edge cloud network

The invention provides an asynchronous service deployment method and device for an edge cloud network, and the method comprises the steps: checking whether a current time slot meets a layer cache updating condition or not in response to a deployment request for a target micro service received in the current time slot; if not, for any deployable node, scheduling the scheduling information of any required mirror image layer and the data access rate between the nodes from any other node according to the mirror image layer required by the target micro-service, the memory space of the corresponding mirror image layer and the micro-service deployment information under the current time slot; and constructing a total layer loading time function that the target micro-service is deployed on the node and changes along with the time slot, so as to construct a service utility function that corresponds to the node and changes along with the time slot in combination with profit information and starting cost of the node, thereby determining a deployment strategy of the target micro-service, and starting the target micro-service based on a mirror image layer required by the target micro-service. The method effectively balances the service performance and the resource utilization rate.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Tracking control method for preset performance and specified time of mechanical arm

The invention relates to a preset performance specified time tracking control method for a mechanical arm, belongs to the technical field of intelligent robot control, and solves the technical problem of low control precision of the mechanical arm. Comprising the steps of establishing a dynamical model and a fault model, designing a preset performance specified time function, constructing a preset performance specified time tracking control law, and verifying the bounded stability of the preset performance specified time tracking control law. According to the control method, the specified time preset performance function is introduced into the control law design in an error transformation mode, synchronous adjustment of the convergence precision and the convergence speed is guaranteed, and the control method is used for the mechanical arm device and can also be used for locally spraying an end effector on the surface of an aircraft.
Owner:AIR FORCE UNIV PLA

NTN feeder line link time delay parameter determination method and device, base station and storage medium

The invention provides an NTN feeder line link time delay parameter determination method and device, a base station and a storage medium, and the method comprises the steps: solving satellite-ground distances corresponding to a plurality of sample moments of a detection time period according to ephemeris information and epoch time corresponding to the detection time period by the base station; according to the method, the fitting coefficient of the distance time function corresponding to the detection time period is determined by performing curve fitting on the satellite-ground distance, and the public time delay parameter is determined according to the fitting coefficient, so that the accuracy and the efficiency of determining the public time delay parameter are improved; therefore, the user terminal can accurately estimate the public time delay of the feeder line link according to the public time delay parameter and perform corresponding timing compensation, signal synchronization is ensured, and the technical problem that the base station cannot accurately determine the public time delay parameter in the prior art is solved. In addition, the variation trend of the satellite-to-ground distance in a long time period can be determined according to the calculation of fewer sample points, and the accuracy of time delay evaluation is ensured with lower operation overhead.
Owner:广东世炬网络科技股份有限公司

Dynamic prediction time function model for surface mining subsidence and parameter solving method thereof

The invention relates to a dynamic prediction time function model for surface mining subsidence and a parameter solving method thereof, which are characterized in that on the basis of a Sigmoid function, all expressions of dynamic subsidence rule characteristics of mining surface points can be realized by carrying out related optimization and improvement on the Sigmoid function and improving an interval estimation method based on a main influence radius of a probability integral prediction parameter. According to the method, the ground surface subsidence track feature, the total subsidence time feature, the subsidence speed feature and the acceleration feature can be accurately and dynamically predicted, a time function parameter solving method is simple, parameters used for parameter solving are all related prediction parameters of a common ground surface mining subsidence static prediction model-probability integral method, and therefore the method has the advantages that the method is easy to implement. In an actual operation level, parameters of the time function are easier to obtain.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Wiener accelerated degradation model construction method and system based on exponential time function

The present invention provides a method for constructing a Wiener accelerated degradation model based on an exponential time function, comprising the following steps: 1. Establishing a Wiener degradation model based on an exponential time function. 2. Randomly selecting a group of performance degradation data of a target product, substituting them into the degradation model to estimate parameter values. 3. Using a random acceleration coefficient to perform equivalent conversion on the performance degradation data, substituting them into the degradation model to estimate parameter values ​​again. 4. Comparing the estimated values ​​of each parameter obtained by the two estimates, and determining which parameters are related to accelerated stress. 5. Establishing an acceleration model for parameters related to accelerated stress. 6. Constructing a Wiener accelerated degradation model. 7. Applying the Wiener accelerated degradation model to fit the accelerated degradation data of the product. 8. Evaluating the reliability of the product under normal stress levels based on the Wiener accelerated degradation model. The present invention can accurately establish a product accelerated degradation model and reduce the error of reliability evaluation results.
Owner:HANGZHOU INTERNATIONAL INNOVATION INSTITUTE OF BEIHANG UNIVERSITY

Evaluation method and system for police martial arts fighting movements based on staggered time pulses

The present invention discloses a police martial arts combat action evaluation method and system based on staggered time pulses, belonging to the technical field of action behavior analysis. The method solves the problem that existing methods cannot timely capture subtle dynamic changes of joints when processing complex motion sequences. The method comprises extracting key skeleton points from a target action video, converting serialized motion data into a discrete pulse signal set through a pulse function, processing the pulse signal set based on the staggered time function, and performing police martial arts combat action recognition and training evaluation on the target action video based on the pulse feature set using a multidimensional time series evaluation model. The present invention introduces a staggered time function to analyze the temporal relationship of skeleton points, and uses a feature adaptive extraction algorithm based on a flexible trigger mechanism of a water tank to ensure the temporal sequence and integrity of feature extraction, thereby improving the accuracy and robustness of motion behavior evaluation, thereby providing a scientific and effective evaluation tool for action training and evaluation.
Owner:BEIJING SPORT UNIV

Intelligent equipment control method for heterogeneous computing environment

The invention discloses an intelligent device control method in a heterogeneous computing environment, an intelligent device comprises a host end and an MCU end, the control method comprises the following steps: S1, writing a function control code in the same set of high-level language, adding a specified mark to an entry function executed at the MCU end, and calling a corresponding basic service function at a place where MCU hardware IO needs to be accessed; s2, converting a function executed by the MCU end in the function control code into a lightweight byte code, and transmitting the lightweight byte code to the MCU end; and S3, only sending periodic real-time function control, sensor reading and actuator operation write-in tasks to the MCU end for execution. According to the invention, the logic of the host and the MCU end is compiled by using the high-level language in a unified manner, multi-language splitting is avoided, and meanwhile, the MCU end adopts lightweight byte code interpretation and periodic memory management, so that occupation during operation can be compressed, and the industrial-level real-time performance requirement can be met.
Owner:SHANGHAI LANGSHU INTELLIGENT TECH CO LTD

Machine and method for manufacturing a workpiece by a computer-controlled manufacturing machine with an optimal tool configuration

Method for manufacturing a workpiece with a predefined sequence of machine tools by a computer-controlled manufacturing machine with an optimal tool configuration, wherein the initial locations of the tools are allocated, first and second time transfer time functions are calculated for all tools, possible tool location sequences are generated, for possible tool location sequences a respective first cost factor is calculated, obtained tool location sequences are ranked in accordance with the respective first cost factor, the tools are transferred from their initial locations to the optimal locations in accordance with an optimal tool configuration, and the workpiece is manufactured with the optimal tool configuration by the manufacturing machine.
Owner:SIEMENS AG

Path query method

The invention discloses a path query method, which comprises the following steps: acquiring graph data of a time-varying road network, the graph data comprising a vertex set, an edge set, a time-varying transit time function set and a current time window; constructing a time-varying H2H index based on the vertex set, the edge set and the time-varying passing time function set; setting a sliding time window taking the current time window as a reference; sliding the sliding time window along the positive direction of the time axis at a preset time interval, and obtaining corresponding updated traffic prediction data; according to the updated traffic prediction data, performing incremental expansion and updating on the time-varying H2H index to obtain an updated time-varying H2H index; obtaining a query request of a user; and according to the query request, outputting the path with the shortest required passing time corresponding to the query request and the corresponding passing time by using the updated time-varying H2H index.
Owner:HONG KONG UNIV OF SCI & TECH (GUANGZHOU) +1

Flexible rope system preset time control method based on disturbance observer

The present application relates to the technical field of flexible rope control, in particular to a preset time control method for a flexible rope system based on an interference observer, comprising the following steps: establishing a partial differential equation dynamics model of the flexible rope system; establishing a preset time function; constructing a distributed preset time interference observer according to the partial differential equation dynamics model and the preset time function; establishing a dynamics model of interference estimation error according to the distributed preset time interference observer; determining a preset time controller for controlling the flexible rope system based on the dynamics equation of the interference estimation error, and obtaining a distributed control input of the flexible rope system. The preset time controller is used for control input of the flexible rope system, so that the elastic deformation speed of the system converges to the origin within a specified time, and the convergence time is independent of any initial state.
Owner:QUFU NORMAL UNIV

MINIMAL-SNAP Based Passive Motion Trajectory Generation Method

The present invention discloses a passive motion trajectory generation method based on MINIMAL-SNAP. Initial conditions are set, and a sparse trajectory point sequence is allocated; the maximum allowable number of segments is set, the sparse trajectory point sequence is segmented, and a time allocation function is configured; a target constraint matrix is determined; a process constraint matrix is determined, including configuring derivative constraints and configuring continuity constraints; the trajectory parameter matrix within the segment is solved by callback, and the end-point state values are saved; all segments between two points are processed through traversal and loop, and then all points of the trajectory sequence are processed. The generated sequence is sent to the trajectory execution mechanism for execution to generate the trajectory. By giving a sparse and rough trajectory point sequence, the present invention autonomously completes trajectory smoothing and dynamic smoothing, and efficiently outputs trajectory points while taking into account the execution speed, making up for the defect that low-cost motion controllers cannot generate complex trajectories, and can provide a good passive motion rehabilitation experience for patients.
Owner:JILI INNOVATION (SHANGHAI) INTELLIGENT TECHNOLOGY CO LTD

System for monitoring a switchgear

The present invention relates to an apparatus for determining a time of contact of contacts of a circuit breaker, the apparatus comprising: an input unit (30);a processing unit (40); and an output unit (50); wherein the input unit is configured to receive displacement data as a function of time of a moveable contact of a circuit breaker (10) with respect to a fixed contact of the circuit breaker during a closing operation of the circuit breaker; wherein the input unit is configured to provide the displacement data as a function of time to the processing unit; wherein the processing unit is configured to determine a displacement curve as a function of time, wherein the displacement curve as a function of time is determined by a curve fit to the displacement data as a function of time; wherein the processing unit is configured to determine a time of contact of the moveable contact with the fixed contact, wherein the determination comprises a determination of a region of the displacement curve as a function of time, wherein the determination of the region comprises a determination that a gradient of the region of the displacement curve as a function of time is less than a gradient of the displacement curve as a function of time at a time earlier than a time associated with the region of the displacement curve as a function of time, wherein the determination of the region comprises a determination that the gradient of the region of the displacement curve as a function of time is less than a gradient of the displacement curve as a function of time at a time later than the time associated with the region of the displacement curve as a function of time, and wherein the time associated with the region of the displacement curve as a function of time is determined as the time of contact of the moveable contact with the fixed contact; and wherein the output unit is configured to output the time of contact of the moveable contact with the fixed contact.
Owner:ABB (SCHWEIZ) AG

Time-mode intelligent cooling control method for high-speed rolling area

A high-speed rolling area time mode intelligent controlled cooling method comprises the steps that a time mode variable point is set on a human-computer interface, and an operator selects to start an intelligent controlled cooling mode; a torque signal of a pre-finishing mill unit is used as a triggering condition, set delay time is combined, and a through-water controlled cooling time starting function is set through a time function block FC20; an automatic cold control starting command interlocked with the water valve opening pulse signal is generated, and self-locking is formed; calculating the actual length of the non-cold section of the head of the rolled piece in the PLC according to the physical layout of each through water cooling water tank; according to the length and the finish rolling outlet linear speed, accurate controlled cooling starting delay time is obtained through calculation and conversion; and parameter setting and monitoring are carried out through an integrated WINCC operation picture. Full-process and self-adaptive time mode intelligent controlled cooling under the high-speed rolling environment is achieved, frequent manual operation is effectively avoided, controlled cooling uniformity and product quality are improved, and meanwhile equipment loss is reduced.
Owner:YANGCHUN NEW STEEL CO LTD

A platform architecture design method for the operating mode of a multi-core CPU

A platform architecture design method for the operating mode of a multi-core CPU. The platform architecture design method includes the following steps: The homogeneous multi-core CPU first starts the main core, and the main core is core0 of the homogeneous multi-core CPU; The main core wakes up the slave cores during the initialization phase; After the slave cores are started, the slave cores operate in a combined manner of AMP / SMP; The main core runs the general underlying software of the platform. Here, CPU is the central processing unit, AMP is asymmetric multi-processing, and SMP is symmetric multi-processing. The EHMP operating mode proposed by the present invention combines the advantages of the traditional AMP and SMP modes, follows the principle of realizing high-reliability and high-real-time functions in the bare-running mode and realizing non-strong real-time functions in the operating system mode, takes into account the reliability, real-time performance and CPU processing power of the product, and ensures the security of multi-core operation and system reliability.
Owner:BEIJING SIFANG JIBAO ENG TECH +1

Radio frequency computing method and system based on time encoding metasurface

The application discloses a radio frequency computing method and system based on a time coding metasurface. The metasurface is composed of a metal patch layer, an F4B dielectric layer and a metal backplate layer. By applying a specific periodic control signal, the metasurface can modulate the electromagnetic information of the incident wave. The baseband signal of the incident electromagnetic wave represents a time function that needs to be operated, and the control signal of the metasurface corresponds to the coding sequence of the required operation. After the electromagnetic wave interacts with the metasurface, the reflected wave will carry the information of the operation result, and the Fourier transform and convolution operation in the radio frequency domain can be realized. The application eliminates the conversion of the radio frequency signal, and directly completes the calculation in the radio frequency domain, which can effectively reduce the calculation delay and energy consumption. At the same time, since the traditional radio frequency link is omitted, the radio frequency calculator constructed by the metasurface has low hardware complexity and cost, a simple structure and is suitable for application fields of communication, radar, sensing and the like under the premise of ensuring the calculation accuracy.
Owner:SOUTHEAST UNIV

Hinge wear depth dynamic simulation method based on random event

The invention discloses a hinge wear depth dynamic simulation method based on a random event, and the method comprises the steps: S1, constructing a random event time function matrix, and generating a periodic collision event occurrence moment according to the design life of an aircraft hinge and a predefined time unit; s2, determining the collision influence duration, and calculating the continuous influence duration of the collision events on the wear process based on the minimum value or the maximum value of the time difference of the adjacent collision events in the random event time function matrix; s3, two-way wear factors are set and represent the multiplication or halving effect of collision events with the consistent stress direction and the opposite stress direction on the wear depth; and S4, establishing a wear process function, and dynamically adjusting a mean value function of an IG process to reflect the nonlinear influence of a collision event according to whether the current time point belongs to the collision event occurrence moment in the random event time function matrix or not and the continuous influence time period of the collision event.
Owner:XIAN TECH UNIV

Resource scheduling method and device, storage medium and computer program product

PendingCN122086570AMinimize task completion timeMaximize utilization of heterogeneous resourcesProgram initiation/switchingResource allocationTime functionResource information
The invention provides a resource scheduling method and device, a storage medium and a computer program product, and the method comprises the steps: obtaining training data which at least comprises task list information, heterogeneous resource information of various task processing nodes, and clock information; determining a resource scheduling strategy corresponding to one or more tasks based on task list information included in the training data, heterogeneous resource information of various task processing nodes, clock information and a first model; based on a preset reward function and a resource scheduling strategy, the first model is trained, the trained first model is obtained, resource scheduling is conducted on one or more target tasks in the to-be-scheduled task list through the trained first model, and the preset reward function comprises a resource usage amount function and a task processing time function.
Owner:CHINA MOBILE (SUZHOU) SOFTWARE TECH CO LTD +1

A method for constructing a multi-process simulation test system

The application provides a kind of multi-process simulation test system construction method, the method includes: by real-time principle, model and interface separation strategy and interface function division strategy to each functional module of simulation test system is divided, according to the non-real-time function process, model simulation function process, periodic interface communication process and instruction trigger type interface communication process of division complete the construction of multi-process simulation test system, or according to the non-real-time function process, model simulation function process, bus type interface communication process and non-bus type interface communication process of division complete the construction of multi-process simulation test system.The application can solve the technical problems of higher cost and lower efficiency in the development and secondary development of the multi-thread simulation test system in the prior art.
Owner:HIWING TECH ACAD OF CASIC

A control method, device, electronic device and storage medium for controlling control time

The present invention relates to the field of automation technology and provides a control time control method, apparatus, electronic device, and storage medium. The control time control method comprises the following steps: obtaining control information, the control information including a target control object; injecting a first operation event and a second operation event into the target control object, pre-simulating the first operation event, and controlling the simulation time of the first operation event using a time function; and simulating the second operation event after the simulation of the first operation event ends. Embodiments of the present invention are advantageous for improving the accuracy of control long press time.
Owner:SHENZHEN INTELLIFUSION TECHNOLOGIES CO LTD

Shallow heavy oil sampling probe selection method and system based on dynamic flow window

PendingCN122447084AThermodynamicsTime function
The shallow heavy oil sampling probe selection method and system based on a dynamic mobility window selects data in the process of adjacent well sampling, fits a differential pressure-time function, and then calculates the upper limit and lower limit of the mobility window of each probe to form a probe sliding mobility window, compares each probe sliding mobility window with the best sampling mobility range of the sampling target layer one by one, and selects the optimal probe type. Meanwhile, when the sampling operation cannot meet the success standard, the measured formation pressure and pipeline pressure of the target well are fitted into a new differential pressure-time function to cover the original function, and dynamic adjustment is realized. The beneficial effects of the present application are: improving the sampling success rate, accurately matching the formation conditions and probe parameters through the dynamic mobility window. Shortening the operation time, optimizing the sampling probe type, and effectively improving the operation timeliness. Enhancing system automation, and adapting to changes in complex formations.
Owner:CNOOC ENERGY TECHNOLOGY & SERVICES LTD

Method and apparatus for predicting failure of a component

A method is provided for finding events that predict failure of an electronic component of a data processing system. The method includes extracting EDSs from a data stream including an output of the electronic component as a function of time, each EDS satisfying an extraction protocol and being characterized by a time stamp indicating a time at which the EDS was present; transforming the EDSs to corresponding CSVs; clustering the CSVs into clusters, each cluster being characterized by a number of CSVs in the cluster and a range of time stamps for the CSVs in the cluster, where the clustering is determined by a similarity protocol; and identifying a predictor cluster from the clusters having CSVs with time stamps during a period that is nearer a point of failure of the electronic component than other clusters having CSVs, where the predictor cluster has more than a predetermined number of CSVs.
Owner:KEYSIGHT TECHNOLOGIES INC

Systems and methods for continuous mode force testing

Described herein is a method and system for testing a force or strain sensor in a continuous fashion. The method employs a sensor, a test fixture, a load cell, a mechanical actuator and tester hardware and software to simultaneously record signal outputs from the sensor and load cell as functions of time. The method provides time synchronization events for recording data streams between, for example, a linear ramp of the force on, or displacement of, the sensor and for extracting performance characteristics from the data in post-test processing.
Owner:NEXTINPUT INC

Method, device and equipment for monitoring main bearing of heading machine and medium

The application provides a kind of based on the monitoring processing method, device and equipment and medium of main bearing of heading machine, the method comprises: monitoring obtains the running data of main bearing in first preset time, and obtains first characteristic value according to the running data in first preset time, to construct the first time function corresponding to running data according to first characteristic value;Monitoring obtains the running data of main bearing at first time after constructing first time function, and obtains the first predicted value corresponding to first time according to first time function;When determining the difference between the running data of first time and first predicted value is greater than the first difference value of preset, determine that main bearing is in degradation stage, and execute the alarm processing of main bearing in degradation stage.Can timely alarm when main bearing enters degradation stage to adjust the load working condition and lubrication condition of main bearing, ensure project on time completion.
Owner:CHINA RAILWAY CONSTR HEAVY IND

A non-real-time function block execution boundary evaluation method and system

The present invention discloses a method and system for evaluating the execution boundary of a non-real-time function block. The method comprises: converting the non-real-time function block into an intermediate program and constructing a control flow graph according to the intermediate program; deriving an execution boundary parameterized evaluation formula; bringing the value of the non-real-time function block input pin into the evaluation formula to obtain an evaluation result. The system comprises an import module, an analysis module, an export module, a download module, an evaluation module and an execution module, and each module is responsible for importing various types of non-real-time function blocks; analyzing the internal control flow and operation platform of the imported non-real-time function block and providing an execution boundary evaluation formula; simplifying the evaluation formula and generating an evaluation program segment; and packaging the non-real-time function block and its evaluation program segment and downloading them to the operation platform; synchronously running the evaluation program segment to obtain the execution boundary of the function block, and finally responding according to the evaluation result. The non-real-time function block is executed only when it does not exceed a given scan cycle.
Owner:HANGZHOU DIANZI UNIV

Man-machine interactive method and apparatus for long-endurance operation based on dynamic time pressure

The present disclosure provides a man-machine interactive method and apparatus for a long-endurance operation based on a dynamic time pressure, belonging to the technical field of man-machine ergonomics. The method specifically includes: constructing a maximum performance-time pressure-time function curve based on a performance-time pressure function curve corresponding to a long-endurance operation; calculating a response time of a next long-endurance operation based on a historical response time of man-machine interaction after the current long-endurance operation is completed; calculating a maximum performance value corresponding to an initial time of the next long-endurance operation and a time pressure corresponding to the maximum performance value based on the maximum performance-time pressure-time function curve; and calculating an optimal reserved time corresponding to the maximum performance value based on the response time of the next long-endurance operation and the time pressure. The method and the apparatus can improve the performance level of the man-machine interaction during the long-endurance operation, and reduce human errors caused by cumulative fatigue and too short reserved time of the operation, thereby improving the flight safety.
Owner:ZHEJIANG LAB

Timing method and device

The present application provides a timing method and device that can meet the needs of higher precision time. The method includes: a time function network element receives a clock configuration request message from a mobility management network element, determines the timing mode for one or more access network devices among the at least two access network devices to perform timing on one or more terminal devices based on the clock capability information corresponding to the at least two access network devices, and sends a corresponding timing indication message to at least one access network device among the at least two access network devices. The clock configuration request message is used to request timing for one or more terminal devices, and the clock configuration request message includes: the identification of one or more terminal devices, and the identification of the access network device that provides services for the one or more terminal devices. The timing indication message is used to indicate the timing mode, and the clock capability information corresponding to the at least two access network devices includes the identification of one or more satellite signals that the access network device can receive.
Owner:HUAWEI TECH CO LTD

A communication method and device based on a time-sensitive network

The present invention provides a communication method and device based on a time-sensitive network, which at least includes: a first data stream is scheduled for transmission based on time triggering, and a second data stream is scheduled for transmission based on a time function; wherein the time-triggered scheduled transmission is used to set a time interval within the data transmission cycle of each port for the exclusive transmission of the first data stream; if the output value of the time function corresponding to the second data or third data is greater than or equal to 0, and the current time is not within the time interval for the transmission of the first data stream, the data of the second data stream or the third data stream is allowed to be transmitted on the transmission port. In the technical solution provided by the present invention, different transmission schemes are adopted for different types of data streams, and the first data stream with high real-time requirements can interrupt the second data stream with general real-time requirements. By interrupting the second data stream, the real-time performance of the first data stream can be guaranteed.
Owner:SHANGHAI HEQIAN ELECTRONICS TECH CO LTD

Task operation method, electronic equipment, medium and product

The invention discloses a task operation method, an electronic device, a medium and a product, and relates to the technical field of artificial intelligence, and the method comprises the steps: determining a corresponding maximum cut problem according to an actual to-be-processed task, and constructing a plurality of sub undirected graphs corresponding to the to-be-solved maximum cut problem, and determining a loss function predicted value corresponding to the maximum cut problem according to the plurality of sub undirected graphs, so as to determine a time function value of an initial moment when the simulation bifurcation machine starts to operate according to the loss function predicted value, so that the simulation operation machine starts to operate according to the time function value. Therefore, the problem of long-time redundancy from the initial moment to the critical moment during operation of the simulated bifurcation machine due to the fact that the time function value of the initial moment is set to be 0 in the prior art is solved, and the operation efficiency of the simulated bifurcation machine is improved.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Train loading method and device for calculating dynamic response of train passing over bridge

The application discloses a train loading method and device for calculating train bridge dynamic response, and relates to the technical field of bridge dynamic analysis. The method comprises the following steps: based on an established bridge finite element analysis model, setting a train load loading node interval, and forming a dynamic loading node sequence; a virtual beam unit is established between the dynamic loading node sequence, and the length of the virtual beam unit before and after each dynamic loading node is calculated; the time when the train head reaches each dynamic loading node is calculated; the equivalent node force of the train uniform load and the concentrated force is calculated, and the equivalent node force of the dynamic loading node is obtained; the equivalent node concentrated force loading time function is obtained; the input file of the finite element software is generated according to the equivalent node concentrated force loading time function corresponding to each dynamic loading node and the train head arrival time, and is led to the finite element software, so that the train dynamic load moving loading is realized. The application reduces the node loading data, and greatly shortens the calculation time.
Owner:CHINA RAILWAY MAJOR BRIDGE RECONNAISSANCE & DESIGN INSTITUTE CO LTD