Construction planning management system based on BIM+GIS

A management system and project planning technology, applied in the field of engineering management, can solve the problem of not solving the automatic association between BIM model and GIS model, not solving the problem of program optimization in the project planning stage, and not solving the problem of rapid generation of visual solutions, etc. Efficiency and refinement, improve modeling work efficiency, save modeling time

Pending Publication Date: 2020-02-11
CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF4 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Existing BIM technology does not establish a standardized BIM model library based on project planning in the project planning stage. Existing BIM+GIS technology does not solve the problem of quick call of models; The problem of rapid genera...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction planning management system based on BIM+GIS

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The using method of the present invention is as follows:

[0031]Enter the bidding documents in the system, and the system will extract relevant project construction scale, geographical location information, project cost, quality standards, safety construction standards, civilized construction standards, environmental protection requirements and other information according to the program settings, and extract the information in the bidding documents Construction organization information such as bill of quantities, large-scale mechanical equipment configuration table, temporary facility layout, site layout, temporary access road layout, office area and living area layout.

[0032] Click on the BIM family library module, the system will associate the above bidding information, enterprise database with the BIM family library, and output the BIM model of the same type of project by matching the enterprise's construction capacity, enterprise construction quota, enterprise con...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction planning management system based on BIM+GIS, and the system builds a new project bidding file which is automatically matched with an enterprise BIM family library, carries out the matching and screening of a BIM family library needing to be supplemented, and forms a new project-level BIM family library through the secondary expansion of the family library. And the new project bidding file is matched with an existing GIS platform, a region range where the newly-built project is located is screened and delimited, and project-level GIS bottom-layer three-dimensional information data is formed through existing GIS data with different precisions. The construction organization quickly creates a module block, and quickly extracts a BIM model and GIS three-dimensional terrain to complete site arrangement, temporary road arrangement, project department residence arrangement and large temporary facility arrangement on the basis of a project-level BIM familylibrary, a project-level GIS module and an optimized project resource configuration file. The construction organization simulation optimization module is fast, the progress plan and the cost are associated with the BIM+GIS model, the optimal construction scheme is automatically selected through data analysis, and the field construction condition is dynamically optimized.

Description

technical field [0001] The invention relates to the related technical field of engineering management, in particular to a construction planning management system based on BIM+GIS. Background technique [0002] With the increasing popularity and progress of BIM technology, the process of construction project management towards refined and digital management is gradually accelerating. For construction projects, the completeness of the planning stage plays a decisive role in the construction stage. The pre-planning of traditional projects mainly relies on site surveys and design documents, etc. The feedback information is limited, and the project environment, traffic conditions, resource allocation, etc. are not enough to reflect the actual situation. Construction site planning, project site selection, temporary access design and other issues in a complex environment can easily lead to problems such as management blind spots and inaccurate project quantity estimates, which will...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/0631G06Q10/103G06Q50/08
Inventor 袁帅常浩宇黄欣张瑞申
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products