Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

221 results about "Project site" patented technology

Project sites are used to capture tasks and assign them to people in your organization, store and manage project-related documentation, and track project team events on a common calendar. To create a new project site:

Device and method for detecting turn-to-turn insulation failure of rotor winding of generator

InactiveCN102721903ASolving the Challenges of Short-Circuit Fault DetectionAccurate detectionTesting dielectric strengthSignal generatorConductor Coil
The invention discloses a device and a method for detecting a turn-to-turn insulation failure of a rotor winding of a generator. The detection device comprises a signal generator and a digital oscilloscope which are connected to two ends of the rotor winding respectively. Excitation signals are applied to one end of the rotor winding by using the signal generator, and response signals are outputted at the other end of the rotor winding. The response signals are received and displayed by using the digital oscilloscope, and the excitation signals and the response signals are recorded and stored by using the digital oscilloscope at the same time. Determining whether a rotor winding insulation failure exists by comparing the response signals outputted from the two ends of the rotor winding which are recorded and stored by using the digital oscilloscope. According to the invention, generator rotor insulation failure detection can be performed at project site, problems in the rotor turn-to-turn short circuit failure detection in generator maintenance at the project site are solved, and the device and the method can also be applied to rotor winding insulation detection in motor manufacturing phase at the same time.
Owner:STATE GRID HEBEI ELECTRIC POWER RES INST +2

Transmission project site and line selecting method based on GIS space information

Disclosed is a transmission project site and line selecting method based on GIS space information. According to coordinates of an area to be selected of a transformer substation and a line design end point, integrated optimization is carried out on the transformer substation and the line. The method comprises the steps of (1) meshing the area to be selected of the site location of the transformer substation, (2) removing the infeasible area of the site location of the transformer substation, (3) automatically generating an initial path of the line of a site location plot, (4) automatically sorting preliminary schemes of the transformer substation line based on the GIS, (5) performing scene investigation, and verifying and optimizing the line path, (6) performing statistic on to-be-compared schemes of the transformer substation line, and (7) performing technical skill comparing and result outputting. According to the site location selection and line path integrated optimizing method based on the GIS space information, the difficulty of manually selecting the site location and the line path at present is avoided, and the functions of automatic selection and sorting of the site location of the transformer substation, automatic generating of the path, statistic of path length and the number of corners, judgment of line complex terrain, technical skill comparing and the like can be achieved.
Owner:STATE GRID CORP OF CHINA +1

BIM technology and simulation technology-based green building design method

The invention discloses a BIM technology and simulation technology-based green building design method. The method comprises the following steps of: analyzing a current-situation site by utilizing simulation software at the beginning of a building scheme, wherein the analysis comprises earthwork analysis and overland runoff analysis; preliminarily deciding a designed elevation of the site; establishing a project site in Revit according to the designed elevation; carrying out wind and light environment analysis by combining the simulation software; carrying out general drawing design on the basis of the wind and light environment analysis so as to propose a plurality of schemes; establishing a plurality of mass model in the Revit; carrying out wind and light environment analysis on different layouts by combining the simulation software, so as to help comparison and selection to optimize a general drawing layout; finally obtaining a most reasonable general drawing and furthermore deepening the schemes; and carrying out wind, light and heat environment analysis on indoor space by using above method, so as to carry out comparison and selection to optimize a final scheme. According to the method disclosed by the invention, the correctness of an analysis model is ensured, and the reliability of an analysis result is ensured; and a BIM technology is fused with simulation and analysis, so that a design and analysis optimized feedback mechanism is formed and then the correctness and efficiency of green building design and simulation are improved.
Owner:TIANJIN ARCHITECTURE DESIGN INST

Chromium-contaminated soil different-position leaching repairing technology and device

The invention belongs to the technical field of contaminated soil repairing treatment, and particularly relates to a heavy metal (chromium VI)-contaminated soil different-position chemical leaching repairing technology and device. The chromium-contaminated soil different-position leaching repairing device comprises a one-level scrubbing unit, a two-level scrubbing unit, a waste liquid treatment unit and a medicament adding unit. The one-level scrubbing unit comprises a pulper, an even mixing and homogenizing device, a one-level vibration screen and a one-level cyclone. The two-level scrubbing unit comprises a strong stirrer, a two-level cyclone and a two-level vibration screen. The waste liquid treatment unit comprises a thickener, a to-be-pressed mud tank and a plate-and-frame filter press. The medicament adding unit comprises a medicament tank. The chromium contaminated soil different-position leaching repairing technology comprises one-level leaching, two-level leaching and waste liquid treatment. The different-position leaching repairing technology can be flexibly adjusted according to the situation of soil or bottom mud containing various pollutants. The different-position leaching repairing technology device can be moved to a next project site to be used again after the project is over, and therefore the equipment utilization rate can be increased, and cost can be reduced.
Owner:SAFECLEEN TECH

Wind measurement data wind speed correction method based on probability distribution transfer

The invention discloses a wind measurement data wind speed correction method based on probability distribution transfer. The method comprises the steps that firstly, statistical description is carried out on wind speed through a Weibull distribution function; then, the wind speed probability distribution estimated values of an actual measurement year long-time meteorological station, an actual measurement year wind field observation station, a representative year long-time meteorological station and a representative year wind field observation station corresponding to the ith sequence number are respectively calculated; finally, the wind speed is actually measured by the actual measurement year wind field observation station corresponding to the ith sequence number according to hourly wind speed data and the probability distribution estimated values, and the correction wind speed of the representative year wind field observation station corresponding to the ith sequence number is calculated through a probability distribution identical difference value transfer method or a probability distribution identical multiple proportion transfer method. According to the probability distribution transfer method for wind speed correction, the defect that common correlation coefficients in an existing correlation analysis class method are too low and have to be used for correction is overcome, and the method can be suitable for wind speed correction under the conditions that the distance of project sites of an inshore or offshore wind plant and the like and a long-time meteorological bench-mark station is too far or the correlation of the existing method is poor.
Owner:CEEC JIANGSU ELECTRIC POWER DESIGN INST

Method and device for measuring flow speed of dense paste based on electromagnetic signal cross correlation

The invention relates to a method and device for measuring the flow speed of a dense paste based on electromagnetic signal cross correlation. The device comprises a test tube section, a primary instrument and a secondary instrument. When the dense paste flows through a field coil 1 or 2 during pipeline conveyance, a current carrier of the dense paste performs movements of cutting magnetic induction lines in an applied magnetic field, and an electromotive force vertical to the flowing direction of the dense paste is formed; electromotive force signals in the two field coils are guided out by an electrode to be acquired, processed and analyzed; and the delay time of the two field coils is calculated by a cross correlation analysis method of two measuring points, and the quotient of the separation distance and the delay time of the two field coils is the flow speed of the dense paste. The method and the device solve the difficult problem that a special measuring device and a special measuring method for measuring the flow speed of the dense paste on a project site are not provided, and a condition for monitoring the condition of the project site and accurately controlling the flow of the dense paste is provided.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Project hidden pipeline measurement and spatial position automatic matching method based on BIM+AR

The invention discloses a project hidden pipeline measurement and spatial position automatic matching method based on BIM+AR. The method comprises the steps that firstly combinative application is carried out on BIM technology and AR, calibration of two-dimensional code models in a BIM model provides data support for taking the BIM model, two-dimensional code pasting and information extraction technology corresponding to project site provide conditions for AR technology display visualization models being applied, and model distance measuring results, model and live-action measurement and hidden pipeline spatial position matching technology provide the basis for hidden pipeline spatial position positioning. According to the project hidden pipeline measurement and spatial position automaticmatching method based on the BIM+AR, the changing from the three-dimensional virtual world to the three-dimensional augmented reality world is realized applied by the AR technology, visual presentation is carried out on components hidden in wall bodies, the perceptibility is higher so that building information can be presented more comprehensively, more intelligently and more intuitively, the advantages of building information models and the AR technology can be brought into full play, and accuracy and efficiency of the spatial positioning of the project site hidden pipeline can be significantly improved.
Owner:ARMY ENG UNIV OF PLA

Electric power engineering project site quality acceptance management method and system

The invention discloses a method and a system for site quality acceptance management of an electric power engineering project. The method comprises the following steps: a site acceptance personnel collects site quality data of items to be accepted by using a mobile terminal preset with a unified quality acceptance and evaluation standard, and performs acceptance evaluation on the items to be accepted; Transfer the collected site quality data and the corresponding evaluation results to the background server for the project quality inspection person in charge to check the implementation of acceptance work and feedback the acceptance work problems and the corresponding project rectification opinions; The on-site acceptance personnel shall, according to the received feedback acceptance work problems and the corresponding project rectification opinions, request the items to be accepted to make corresponding rectification, and feedback the rectification situation of the items to be acceptedby the mobile terminal. The invention realizes the on-site operation truly through the on-site operation of the mobile terminal, eliminates the phenomenon of 'two skins', makes the on-site operation control of the capital construction in place, executes each link according to the standard, and ensures the safe and high-quality construction of the engineering project.
Owner:FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID

Engineering project visual progress control system based on three-dimensional real scene

The invention relates to an engineering project visual progress control system based on a three-dimensional real scene. The image information data of the construction site is obtained by the unmannedaerial vehicle with the depth camera, the image information data processing is integrated and real-time three-dimensional modeling is carried out by the image synthesis processing system, the data ofthe completed actual engineering quantity and the planned engineering quantity on the project site through the data transmission system, the real-time data collected at the construction site is displayed by the 3D display system of an engineering design model through the 3D real-time model, and the user can obtain the latest progress information of the project through the WeChat application software through the data query system, find out the project earned value of the key line, generate the earned value curve, and realize the progress control of the project. On the basis of the three-dimensional real scene, the invention displays the latest progress of the project site and provides a comparison with the predicted completion situation of the project, thereby providing assistance for the progress control of the project.
Owner:CHINA THREE GORGES UNIV

Construction site virtual construction restoration method based on BIM + GIS

The invention provides a construction site virtual construction restoration method based on BIM + GIS, and the method comprises the steps of collecting the topographic data of a project site, and forming a database; processing the data in the database to generate a GIS model; extracting coordinates and elevation information of the three-dimensional oblique photography data and the three-dimensional forward photography data through a Global Mapper, so a forward photography map is synthesized; combining the construction site three-dimensional model and the forward photography model, and positioning coordinates, sizes and forms of objects needing to be protected on the construction site or needing to be restored after a project is completed to serve as model data backup; positioning coordinates, sizes and forms of objects needing to be protected on a construction site or needing to be restored after a project is completed, and providing data help for follow-up reinforcement, protection and restoration scheme making and work. By utilizing the characteristics of high precision, visualization, high efficiency and the like of the BIM + GIS technology, a construction total plane arrangement diagram is deeply designed, and a project construction site is assisted to realize green construction.
Owner:福建建工集团有限责任公司 +1

Grid infrastructural project digital photo management method and device

The invention discloses a grid infrastructural project digital photo management method and device. The method comprises the steps that a photographer input by a lawful user through a mobile terminal and a shooting project site selected by the user are received, current position information of the mobile terminal is obtained, whether the position difference between the current position information and the shooting project site selected by the user exceeds a first threshold value or not is judged, and if yes, a mistake of the user shooting position is hinted, and the mobile terminal exits from the shooting state; if not, the user is allowed to carry out shooting, and the feature information of a shot photo is recorded, wherein the feature information comprises photo shooting time and the current position information of the mobile terminal; finally, the shot photo and the corresponding feature information are uploaded to a server. When it is determined that the user is not located at the project site for on-site shooting, the user is forbidden to take photos. Meanwhile, when the photo is uploaded, the shooting time and the shooting position information of the photo are uploaded to the server together, and managers can conveniently determine authenticity of the photo by comparing the shooting site and time.
Owner:STATE GRID CORP OF CHINA +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products