Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

16 results about "Project type" patented technology

Project Type is one of the root characteristics of a project, which points its nature. Usually project type is a high-level definition of a project that helps to identify methodologies to be suitable, objects and resources to be involved into the project, and nature of products to be generated by this project.

Limit application processing method and device, equipment, storage medium and program product

PendingCN121544374AFinanceOffice automationProject typeCredit limit
The invention provides a quota application processing method and device, equipment, a storage medium and a program product, and can be applied to the technical field of artificial intelligence. The method comprises the steps of obtaining basic auditing information related to a target project under the condition that a target object is authorized; determining a matching degree between the project progress information, the project type information, the object type information and the limit information and a preset auditing rule; under the condition that the matching degree between at least one of the project progress information, the project type information, the object type information and the limit information and a preset auditing rule is inconsistent, determining a target reconnaissance end matched with the target object from a plurality of reconnaissance ends; obtaining first real-time investigation sub-information related to the target project; acquiring second real-time investigation sub-information, and taking the first real-time investigation sub-information and the second real-time investigation sub-information as real-time investigation information; and determining an application result of the quota application according to the real-time investigation information.
Owner:CHINA CONSTRUCTION BANK +1

Method, device and equipment for dynamically generating document based on template and medium

The invention discloses a method, a device, equipment and a medium for dynamically generating a document based on a template, and the method comprises the steps: receiving a document generation request which comprises a project identifier and a target document type, calling a template manager to obtain a corresponding dynamic document template according to the project identifier and the target document type, and storing the dynamic document template in a database; according to the method, the unified data providing interface is called to obtain the project data corresponding to the project identifier, the project data is dynamically assembled according to the label definition in the dynamic document template, the assembled data is utilized to render the document template, the target delivery document is generated, and the tagged dynamic document template is adopted, so that the template writing difficulty is reduced; and the requirements of different project types can be met.
Owner:SHENZHEN COMTOP INFORMATION TECH

Project code framework generation method and device and electronic equipment

The invention discloses a project code framework generation method and device and electronic equipment. The method relates to the field of computers, and comprises the following steps: receiving a project code framework generation instruction sent by a user side, and analyzing the project code framework generation instruction to obtain a target project and component information, the component information being used for indicating a function module added in the target project; identifying a project type of the target project, determining an initial code framework template according to the project type and the component information, and determining a component template according to the component information; and obtaining filling parameters, and generating a project code framework of the target project according to the filling parameters, the initial code framework template and the component template. Through the method and the device, the problem of low efficiency and accuracy of project code framework construction in related technologies is solved.
Owner:INDUSTRIAL AND COMMERCIAL BANK OF CHINA

Multi-agent collaborative intelligent review method and system

The invention discloses a multi-agent collaborative intelligent review method and system, and belongs to the technical field of building engineering construction. The method comprises the following steps: obtaining a standardized text Tn; inputting Tn into a large language model, calculating a classification probability pi result and a confidence coefficient rho, and determining a project type; according to the project type, matching a corresponding review rule subset from a rule base; calculating a score sij of each item, a score Si of each dimension and a total score Stotal; generating a question list and an improvement suggestion set; generating improved content; and outputting the review report. According to the method, natural language understanding, logical reasoning and text generation capabilities of a large language model are utilized to simulate an expert review process, and rapid classification, deep review, quantitative evaluation and content optimization of the construction scheme are realized, so that the intelligent level, review efficiency and risk identification accuracy of construction scheme review are improved.
Owner:SHANGHAI CONSTRUCTION GROUP CO LTD

Project process processing method and device, storage medium and computer equipment

PendingCN121961182ARealize intelligent matchingImplement automated initializationDigital data protectionOffice automationTamper resistanceProject type
The invention relates to the technical field of computers, in particular to a project process processing method and device, a storage medium and computer equipment. The method comprises the following steps: acquiring project original data; inputting the project original data into a preset project type identification model, and determining a target project type of the project original data; based on a preset project flow processing link corresponding to the target project type, determining a target processing link required for processing the project original data; creating a corresponding alliance chain node for the target processing link so as to construct an alliance chain according to the alliance chain node; and publishing the project original data to an alliance chain, so that alliance chain nodes process the project original data in sequence to obtain a project processing result. According to the method, automatic and intelligent operation of the project process is realized, and credibility, traceability and tampering resistance of data in the whole process can be ensured.
Owner:KUNMING POWER EXCHANGE CENT CO LTD

Project management system development method based on low code configuration

The invention discloses a project management system development method based on low code configuration, relates to the technical field of computer software, and remarkably improves the prediction adaptability and practicability of a project management system in a new project type through a low code configuration and meta-learning fused architecture. A low-code interface allows non-technical users to intuitively configure project parameters, such as a construction period or a risk index, so that a system customization threshold is reduced, and enterprises can quickly respond to innovative project requirements without depending on professional development teams; the meta-learning module uses general knowledge of a pre-training model to complete model adjustment only with a small amount of new data, and overcomes the defect of weak generalization ability of a traditional model in a data sparse scene; the few-sample adaptive mechanism is optimized through internal and external loops, so that the model is ensured to be fast converged while keeping stability, and the training time and resource consumption are reduced; the verification process in the deployment stage enhances the reliability of the system, and the dynamic consistency verification can detect the output deviation of the model in time.
Owner:GUANGZHOU SINOTECH INFORMATION SERVICE CO LTD

Power utilization project reserve demand management method for power distribution operation and inspection center

The invention relates to the technical field of project management of a power distribution operation and inspection center, and discloses a power utilization project reserve demand management method for the power distribution operation and inspection center, and the method comprises the steps: building an examination and approval process according to different project applications, inputting work order information, and storing the input work order information into a project acceptance system; a user processes an applied item through an account number, processing is carried out according to different item type distribution and corresponding users, finally a completed item application is stored in an item storage system, and a user operation process and execution and a calling record are recorded, so that the user operation record and the applied item are convenient to call and maintain, and the user experience is improved. Project reserve lean management level is improved, and digital transformation of distribution network construction is promoted.
Owner:NANJING ZHONGHENG SOFTWARE TECHNOLOGY CO LTD

Project approval scheme determination method and device, program product and electronic equipment

The invention discloses a project approval scheme determination method and device, a program product and electronic equipment, and the method comprises the steps: carrying out the branch activation / pruning operation of a preset approval process template based on a target business rule of a target project, and obtaining a reconstruction process topological graph corresponding to the target project; based on the construction mode attribute of the target project, determining a node configuration sequence corresponding to each examination and approval link in the reconstruction process topological graph, and adding the node configuration sequence corresponding to each examination and approval link to the reconstruction process topological graph to obtain a customized process topological graph corresponding to the target project; based on the project type attribute of the target project, determining a handler candidate set corresponding to each approval node in the customized process topological graph; and based on the customized process topological graph and the handler candidate set corresponding to each approval node, determining a target approval scheme corresponding to the target project. The technical problems of low generation efficiency and low accuracy of the project approval scheme in the prior art are solved.
Owner:CHINA TOWER CO LTD

Issue tracking platform with a generative service for creating new issues

PendingUS20260187594A1Project typeUser input
Embodiments described herein relate to systems and methods for generating a set of issues for an issue tracking platform. The system can generate a user account at the issue tracking platform, and cause display of an intake interface on a client device. The system can analyze the user input received at the intake interface to determine a project type classifier and execute a search at the issue tracking platform to identify issues managed by the issue tracking platform. The system can cause generation of a prompt that includes predetermined prompt language selected based on the project classifier, and data extracted from the set of issues. The system can analyze a generative response to identify a project definition and one or more issues and cause generation of a project comprising the one or more issues hierarchically related to the project.
Owner:ATLASSIAN PTY LTD

A code generation method and device, electronic equipment, storage medium and product

The embodiment of the application provides a code generation method and device, electronic equipment, storage medium and product, relates to the technical field of software development, and the method comprises the following steps: obtaining to-be-utilized information and a requirement description text describing a to-be-updated function of a specified project; the to-be-utilized information comprises project information comprising a project type of the specified project and a component library identifier referenced by the specified project, and attribute information of a generated component in the specified project; the project information is obtained by analyzing the structure of the specified project by using the latest project file of the specified project and a large language model; the attribute information is obtained by performing component function analysis by using the component code file of the generated component in the project file and the large language model; and the large language model is used to generate code of the to-be-updated function matched with the project type and meeting the requirement description text in combination with the attribute information and a component library represented by the component library identifier. The code generation cost can be reduced, and the code generation efficiency can be improved.
Owner:BEIJING QIYI CENTURY SCI & TECH CO LTD

Project collaborative management method

The invention discloses a project collaborative management method, and relates to the technical field of project management data processing. The method comprises the steps of determining a preset standard template library corresponding to a target project type in response to a management instruction of a target project; based on a preset standard template library, establishing an association relationship between the cost item of the target project and the progress task item of the target project; according to the association relationship and the actual execution data of the target project, constructing a collaborative analysis model reflecting the execution state of the target project; generating a cash flow table of the target project based on the collaborative analysis model, and predicting a future cash flow trend of the target project by using a time sequence analysis model; and identifying the execution risk of the target project through a preset collaborative judgment logic and triggering a corresponding risk early warning signal. According to the scheme, combined management of cost, funds and progress can be carried out on the project, and help is provided for improving project management efficiency and finding risk items in time.
Owner:SHANGHAI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING CO LTD

Enterprise project cost management method and system based on dual matching mechanism

PendingCN121920958Aimprove accuracyImprove data accuracyFinanceOffice automationData ingestionProject type
The invention belongs to the technical field of enterprise cost management, and provides an enterprise project cost management method and system based on a dual matching mechanism. Comprising the steps of collecting project data of an enterprise multi-source business system in real time; performing standardized governance on the project data, and extracting project features based on the project data after standardized governance; processing the item features based on a Llambda 3 model, and automatically identifying the item types to obtain an identification result; based on the identification result of the item type, cost collection and distribution are carried out by adopting a differentiation rule; inputting the item features into a Llambda 3 model to obtain a preliminary recognition result, and matching the item features with a preset rule base to obtain a verification result; when the preliminary identification result is consistent with the verification result, the item type is confirmed; and if not, triggering an artificial rechecking process. The problems that in the prior art, project types are divided manually, the cost data quality is poor, the collection rule is rigid, and deep analysis is lacked are solved.
Owner:SHANDONG SHANDONG UNIV ELECTRIC POWER TECH

Work summary generation method and device, electronic equipment and storage medium

The invention relates to the technical field of data processing, and provides a work summary generation method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining a work knowledge graph, and constructing nodes and edges in the work knowledge graph based on work data; determining a first work sub-graph in a first time range from the work knowledge graph, and dividing the first work sub-graph into project type units based on project identifiers and work types of nodes in the first work sub-graph; generating a work task chain of a project corresponding to the project type unit based on the work timestamps of the nodes in the project type unit and edges between the nodes, and generating summary information of the project type unit based on the work timestamps of the nodes in the project type unit, the work content description information and the related personnel information; and generating a work summary corresponding to the first time range based on the work task chain and the summary information. According to the invention, the logicality and traceability of the automatically generated work summary are ensured.
Owner:IFLYTEK CO LTD

Power grid project digital design system and method based on image engine basic function

The invention relates to a power grid project digital design system and method based on an image engine basic function, and the system comprises a project management module which is used for defining the basic information of a project, carrying out the level-to-level management of component types, carrying out the management of a standard set, a project sample and a line style, and setting a line type, a character style, a filling style and a material style; the user-defined family library classification management module is used for performing classification management on the power grid engineering according to project types and professions; the professional modeling module is used for creating components and setting linkage of a two-dimensional drawing and a three-dimensional model; the import and export module is used for importing and exporting external data; the collaborative management module is used for linking local files for data coordination and mutual reference; and the digital drawing output module is used for outputting final power grid engineering drawing information. Compared with the prior art, the method has the advantages that the whole process of power grid project setting is covered, and the design efficiency and the standardization level are improved.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Real estate project data processing methods, systems, electronic devices, and storage media

PendingCN122367222AProject typeManagement system
This application relates to the field of engineering acceptance monitoring technology, and discloses a method, system, electronic device, and storage medium for real estate project data processing. The method includes: acquiring a project inspection request from a user terminal, wherein the project inspection request carries project region information and project type information; based on the project region information, loading corresponding project standard parameters from a regional adjustment database to obtain a default project configuration, wherein the regional adjustment database dynamically stores project standard parameters for multiple regions; based on the project type information, adapting the default project configuration to the project type to obtain a project standard configuration conforming to the project type; and processing the project data based on the project standard configuration to obtain the project data processing result. This method can provide a standardized management system for real estate project acceptance monitoring.
Owner:BEIJING QDING INTERCONNECTION TECHNOLOGY CO LTD

Full-process progress management and control method for communication engineering construction project and storage medium

PendingCN121961185ARealize full-process progress controlRealize monitoringOffice automationCompletion timeStart time
The invention relates to a full-process progress management and control method for a communication engineering construction project and a storage medium, and the method comprises the steps: obtaining process template information of the communication engineering construction project through JSON template definition, the process template information comprising a project type, a project name, a project version, a process node set and a process auditing record; the flow node set comprises node information of flow nodes; according to the process template information, establishing a monitoring process through a Flowable process engine; progress data of the current process node are obtained, the monitoring progress bar is updated according to the progress data, and the progress data comprise node starting time, node completion time, document submission state and approval time consumption. According to the method, each node of a communication construction project is monitored, manual progress coordination, manual summarization and step-by-step reporting are not needed, the process progress can be updated in time, and real-time information sharing and efficient collaboration are realized.
Owner:FUJIAN POST&TELECOM PLANNING & DESIGNING INST CO LTD