Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

218 results about "Project type" patented technology

Project Type is one of the root characteristics of a project, which points its nature. Usually project type is a high-level definition of a project that helps to identify methodologies to be suitable, objects and resources to be involved into the project, and nature of products to be generated by this project.

System and method for automatically linking items with multiple attributes to multiple levels of folders within a content management system

A system, method, and computer program product are provided for automatically linking items with multiple attributes to multiple levels of folders within a content management system. The present system extends automatic linking to support multiple levels of folders and multiple attributes. One feature of the present system is to supplement the implementation of the automatic linking plan without user involvement so that the user is not required to know the rules for creating or nesting folders. A system defined attribute is used to indicate that the folder item was created by the present system. In addition, the present system automatically moves an item from one folder to another when the item is changed to a different type if the item was first added to the folder by the present system. When an item's attributes are changed or the item is redefined as a different type, the item is re-indexed. The present system then changes the item's link from the original folder to a new or different folder that matches the item's new attributes or definition. If no correspondence folder exists for this customer, the present system creates a new folder with the proper attributes. If the result of removing an item from a folder results in an empty folder and if the folder was originally created by automatic linking, the present system deletes the empty folder. When the present system creates a new folder, the “automatic linking” rules for that item type are checked by the present system. This process is executed recursively.
Owner:LINKEDIN

Project scheduling and tidal river network pollutant transport process coupled numerical value simulation method

The invention discloses a project scheduling and tidal river network pollutant transport process coupled numerical value simulation method. The method comprises the following steps of: establishing a tidal river network one-dimensional hydrodynamic force-water quality model; establishing a project application model to realize accurate and quantitative description of a project type and an application manner; solving the tidal river network one-dimensional hydrodynamic force-water quality model and the project application model by adoption of a finite difference format and a four-cascade solution; and establishing a gate pump group multi-target optimal scheduling model through aiming at targets of flood control, flood drainage and water quality improvement and project constraint conditions. According to the method disclosed by the invention, the accurate and quantitative description of interaction of a hydrodynamic process, a pollutant transport process and project scheduling is realized; and on the basis of simulating the project scheduling, the established gate pump group multi-target optimal scheduling model is utilized to obtain a gate pump group combined optimal scheduling scheme, so that the practical application value of the project scheduling simulation can be remarkably improved.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Intelligent management system and method thereof for rural migrant workers

The invention relates to an intelligent management system and a method for rural migrant workers. According to the technical scheme of the invention, a system function module is used for the role authorization management, the identity authentication, the short message notification, the instant message (IM) service, the event management, the data processing, the assembly service and the interface service. A wage management is used for the management of the wage payment information of rural migrant workers. A construction site management module is used for the access to a third-party site staff positioning system and the information sharing service. A project management module is used for the management of the project process, the project management, the construction part management and the project type management. A system management module is used for the authority management, the company management and the user management. A report management module is used for the extraction of required caliber data out of the project management module. A management module is used for the storage and the management of the scanning copies of original documents containing the signature and stamp information. A handset APP module is used for scanning two-dimensional codes on the information cards of rural migrant workers. An exit management module is used for the exit management of rural migrant workers. Based on the above system and the method thereof, the management of rural migrant workers is standardized and normalized.
Owner:苏州天地微易智能科技有限公司

Demand prediction system of construction materials of power distribution network

The invention discloses a demand prediction system of construction materials of a power distribution network. The system comprises a data acquisition module, a clustering module, a project type attribute determining module and a material demand prediction module; the data acquisition module obtains parameters of preset attributes of historical power grid projects as well as the material utilization amount of the different types of historical power grid projects; the clustering module carries out clustering analysis on the material utilization amount of the historical power grid projects in an improved k-means clustering method, and determines a clustering family; the project type attribute determining module uses a key word frequency analysis method in the clustering family to determine a project type attribute; and according to the material utilization amount of the historical power grid project, the parameter of the preset attribute of the historical project and the project type attribute, the material demand prediction module uses a neural network algorithm to construct a material demand prediction model, inputs the preset attribute parameter and project type attributes of a power-grid project to be predicted into the material demand prediction model, and outputs a predicted value of the material utilization amount of the corresponding power-grid project to be predicted. According to the invention, the cost of material prediction is reduced, and the prediction precision is higher.
Owner:吴本刚

Method and device for predicating demand of goods and materials for power distribution network construction

A method for predicating demand of goods and materials for power distribution network construction includes the steps: acquiring historical project preset attributive parameters and historical project goods and material usage amounts, using a clustering algorithm to cluster the historical project goods and material usage amounts to determine clusters, using a key word frequency analytical method to determine project type attributes of the clusters, and stabilizing the various historical project goods and material usage amounts within a preset range; according to the historical project preset attributive parameters, the historical project goods and material usage amounts, preset implied node numbers and the project type attributes, using a preset algorithm to set up a predication model, and determining an implied node weight parameter matrix according to the prediction model; and acquiring to-be-predicated project preset attributive parameters and a to-be-predicated project type attribute, and using the predication model to determine the corresponding to-be-predicated project goods and material usage amount according to the to-be-predicated project preset attributive parameters and the to-be-predicated project type attribute. A device corresponding to the method is further provided, the project type attributes are set up, and accuracy in determination of the goods and material usage amount is improved.
Owner:GUANGDONG POWER GRID CO LTD

A CF recommendation method fusing matrix decomposition and user project information mining

The invention provides a CF (collaborative filtering) recommendation method fusing matrix decomposition and user project information mining. The CF recommendation method comprises the following steps:reading historical score data and project type data information of a user on an article; based on the FunkSVD model, optimizing and decomposing the user score matrix, and adding a similarity factor to calculate and generate a user score prediction matrix; calculating optimal similarity by optimizing CF users and project information occupying different proportions, predicting user scores, and generating Top-N recommendation lists. The method has the advantages that (1) the user scoring matrix is optimized and decomposed based on the FunkSVD model, and the trust factor is added to predict the user scoring matrix, so that the problem of low prediction accuracy caused by data sparseness of a traditional matrix decomposition model is relieved; (2) similarity is calculated based on the user information and the project information, and the problem of cold start caused by excessive dependence on historical data in a traditional recommendation algorithm is solved; and (3) a trust degree relationship between users is introduced, so that the recommendation precision and interpretability of a traditional CF recommendation algorithm are improved.
Owner:BEIJING UNIV OF CHEM TECH +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products