Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

69 results about "Site planning" patented technology

Site planning in landscape architecture and architecture refers to the organizational stage of the landscape design process. It involves the organization of land use zoning, access, circulation, privacy, security, shelter, land drainage, and other factors. This is done by arranging the compositional elements of landform, planting, water, buildings and paving in site plans. Site planning is the design and process of planning for a new development project. Within Community Development, this stage of site planning is the organizing phase where city planners create a tactical/detailed plan of new developments. These site plans are the exact details city planners need to give their proposal to the community. This is the proposal to the community to get development plans approved of. Through site analysis and precise dimensions taken by development engineers, community members are given an exact image of what developers want to do.

Target aggregation site planning method and target aggregation site planning device based on positioning technology

The invention discloses a target aggregation site planning method and a target aggregation site planning device based on a positioning technology. The target aggregation site planning method based on the positioning technology comprises the following steps: acquiring location information of a requests party and location information of a receiving party on the basis of the aggregation request of the request party received by the receiving party; determining an appointed point list on the basis of a first predetermination condition, wherein the appointed point list comprises at least one candidate appointed point; generating a first candidate route from the request party to the candidate appointed point as well as a second candidate route from the receiving party to the candidate appointed point; determining a target aggregation site from the candidate appointed point on the basis of a second predetermination condition, determining a first route from the first candidate route, and determining a second route from the second candidate route, wherein the first route is a route from the request party to the target aggregation site, and the second route is the route from the receiving party to the target aggregation site. According to the scheme, the target aggregation site to which the request party and the receiving party can reach and the optimum route can be obtained.
Owner:BAIDU ONLINE NETWORK TECH (BEIJIBG) CO LTD

Planning simulation method and system for modular reconfigurable robot based on augmented reality

ActiveCN111300416ARealize real-time planning simulation processQuick conversionProgramme-controlled manipulatorSite planningSimulation
The invention discloses a planning simulation method for a modular reconfigurable robot based on augmented reality. The method comprises the following steps of: collecting actual factory scene information; generating an augmented reality factory scene; overlaying a built modular reconfigurable robot model and the augmented reality factory scene; identifying and reconstructing the three-dimensionalmodel of an object in the scene, giving a collision bounding box and physical attributes, recording the operation process and interference of a virtual robot in real time; and adjusting the configuration or parameters of the modular robot until meeting the corresponding working needs. Based on the actual factory unit scene, the planning simulation method and system can configure and plan the required robot configuration, motion and path quickly and accurately through the augmented reality planning simulation method, so that users can experience the realistic effect of the overlaying fusion ofvirtual and reality without going to the site, the waste caused by manufacturing errors of physical robots and the dangers caused by site planning are avoided, and meanwhile, the speed and accuracy of applying the modular reconfigurable robot are improved.
Owner:NANJING INST OF TECH

Power station small pipeline secondary design construction method based on BIM technology

The invention discloses a power station small pipeline secondary design construction method based on the BIM technology. The method is used for solving the technical problem of small pipeline secondary design in an electric power construction project and the problem of cloud replacement between redundant pipelines and insufficient pipelines after pipeline construction is completed. The method comprises the following steps: S1, establishing a three-dimensional model of a power plant building structure and related pipeline equipment according to a building, a structure, a pipeline construction drawing and a site planning drawing, and importing respective basic data, position data and supply data of the related pipeline and equipment models; S2, establishing a pipeline BIM three-dimensional model; S3, establishing a color identifier for the surface of the pipeline in the pipeline BIM three-dimensional model; S4, displaying the identified small pipeline model through a 720 cloud panoramictechnology and checking the model through VR equipment. Through establishing the three-dimensional solid model, reasonably planning the trend of the pipeline and accurately positioning the position ofthe pipeline, the pipeline model can be viewed from different directions, so that the arrangement of the pipeline is visualized.
Owner:中能建建筑集团有限公司

Magnetic shielding protection body construction method for magnetic navigation system operating room

InactiveCN102777029AMeet safety requirementsAdvanced engineering technologyBuilding material handlingSite planningHealth risk
The invention discloses a magnetic shielding protection body construction method for a magnetic navigation system operating room, which comprises the following steps of: site planning and examination; carrying out alignment to an operating room building, performing building positioning and setting and alignment on a magnetic shielding operating room according to a plane figure, a floor, a top surface, a wall magnetic shielding arrangement diagram and a detailed structure map in the magnetic navigation system operating room; and arranging inner and outer position lines of building retaining walls, X and Y centering axes, a control room, an operating room, equipment room wall position lines, regional axes, induction doors, a hand push door position line, electric slots and pipe laying channel lines of the magnetic navigation system operating room on the floor, wherein the requirements of the precision control are that the length-width error is controlled within 2mm, and the diagonal error is controlled within 4mm; mounting a ground component; mounting the magnetic navigation system; carrying out inspection and acceptance of the magnetic shielding; and the like. According to the operating room magnetic shielding protection body construction method, the health risk generated in the process of working around a magnet is reduced to the greatest degree, accidents are avoided, magnetic leakage is completely eliminated, and preventative measures are taken before the accidents occur.
Owner:JIANGSU PANASIA MEDICAL TECH GRP CO LTD

Large-scale project on-site planning method

The invention discloses a large-scale project on-site planning method. The method comprises the following steps: building a preliminary terrain model through employing B M + G S, and building a plurality of site arrangement schemes on the basis of the combination of the preliminary terrain model + a high-definition satellite mixed graph and site survey; an unmanned aerial vehicle oblique photography technology is utilized, a live-action model serves as basic data of project planning, an accurate digital terrain is provided for three-dimensional design, temporary construction scheme design is carried out, and project overall temporary construction function partitioning is planned; three-dimensional visualization is taken as a means, cost control is taken as a main line, selection ratios are carried out from the aspects of technology, organization and traffic demands, and a final planning scheme is determined. The problems that in the background art, large projects, especially mountain projects, are large in temporary building number, large in site construction area, short in temporary construction period, high in environmental protection requirement and the like are solved, and the problems that the advantages and disadvantages of schemes are difficult to distinguish and arrangement schemes are more difficult to find in the earlier stage in a traditional mode of combining on-site exploration with plane layout drawings are solved.
Owner:CHINA RAILWAY 18TH BUREAU GRP CO LTD +1

Planning method for site selection and service range division of urban electric taxi charging station

The invention discloses a planning method for site selection and service range division of an urban electric taxi charging station. The planning method comprises the following steps of S1, analyzing driving and charging behavior characteristics of an electric taxi; S2, generating charging station construction annual maintenance cost based on the number of the charging piles and user annual charging cost based on the queuing theory; S3, weighting the annual maintenance cost of the charging station construction and the annual charging cost of the user to obtain the whole society comprehensive cost of the charging station, and constructing an electric taxi charging station site planning model by taking the safe operation of the power grid as a constraint; and S4, solving the model establishedin the step S3 by combining a hybrid discrete binary particle swarm algorithm and a Voronoi diagram method to realize optimal planning of a charging station site and automatic optimization of a charging station service range. The planning method is high in practicability, the local searching capacity of charging station site selection planning is enhanced, and a new thought is provided for urbanelectric taxi charging station site selection planning.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Station planning method and device based on clustering, electronic equipment and storage medium

The embodiment of the invention provides a station planning method and device based on clustering, electronic equipment and a storage medium, and relates to the field of equipment management of mobilecommunication. The station planning method comprises the steps of obtaining raster data after rasterization processing is performed on to-be-planned data; wherein the to-be-planned data are samplingpoints for arranging stations, and the raster data are a raster comprising a plurality of sampling points; clustering the raster data according to a preset clustering parameter to obtain a to-be-determined planning station; wherein the to-be-determined planning station is a clustering center obtained by clustering a plurality of sampling points in the grid; and taking the to-be-determined planningsite matched with the planning demand of the user as a target station. Compared with the traditional manual station planning, the site planning method provided by the invention can reduce the labor,greatly improve the working efficiency of network analysis and site planning, save the expenditure of a notebook computer, data analysis software and the like, and reduce the limitation on the personnel ability.
Owner:HENAN INFORMATION CONSULTATION DESIGN & RES

Method for improving constructional engineering project management

The invention provides a method for improving constructional engineering project management. The method comprises a design management BIM application technology, a BIM auxiliary temporary constructioncounter, site planning, drawing review management, scheme compilation and disclosure, a BIM virtual template technology, deepening design management, BIM progress management, BIM safety management, BIM material management and BIM operation and maintenance management. Compared with an existing project management technology, the BIM technology is applied to the whole process of engineering projectmanagement by fully utilizing the characteristics of visualization and the like of the BIM technology, a traditional project management mode is changed, and considerable economic benefits and social benefits can be brought. Through the application of the BIM technology, the management efficiency and quality of project management in the stages of design, purchase, construction and later operation and maintenance are improved, and a large amount of referenceable experience is provided for future project management. Therefore, the method has a wide application prospect, and has positive guiding significance for high-speed, high-efficiency and high-quality development of engineering project management in China.
Owner:CHINA CONSTR EIGHTH ENG DIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products