Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11 results about "Design management" patented technology

Design management is a field of inquiry that uses project management, design, strategy, and supply chain techniques to control a creative process, support a culture of creativity, and build a structure and organization for design. The objective of design management is to develop and maintain an efficient business environment in which an organization can achieve its strategic and mission goals through design. Design management is a comprehensive activity at all levels of business (operational to strategic), from the discovery phase to the execution phase. "Simply put, design management is the business side of design. Design management encompasses the ongoing processes, business decisions, and strategies that enable innovation and create effectively-designed products, services, communications, environments, and brands that enhance our quality of life and provide organizational success." The discipline of design management overlaps with marketing management, operations management, and strategic management.

BIM-based interior decoration design management method

The application discloses a BIM-based indoor decoration design management method and belongs to the technical field of building information modeling and engineering project management. The method builds a unified BIM collaborative platform, adopts three-dimensional laser scanning to collect on-site point cloud data, and establishes a high-precision original structure BIM model. Based on the model, function flow analysis and illumination and other physical environment simulation verification are carried out, a parameterized family library is constructed, and decoration, mechanical and electrical multi-specialty model integrated collaboration is realized. The integrated model is subjected to conflict detection and collision optimization, net height analysis and improvement are completed according to the pipeline comprehensive principle. Net quantities are extracted from the non-collision model, and material layout and cost dynamic control are realized in combination with the loss rate. 4D construction simulation and three-dimensional visualization are carried out in association with the progress plan. The as-built model is updated according to the site change, asset information is inputted to form a digital twin model for operation and maintenance management, and precise, efficient and digital management of the whole life cycle of indoor decoration is realized.
Owner:JIANGSU SHANGRUIHONGTAO CONSTR ENG CO LTD

Water conservancy design decision support system based on knowledge graph

The application relates to the technical field of engineering design management, in particular to a water conservancy design decision support system based on a knowledge graph, which comprises a parameter constraint construction module, a design standard fusion module, a task semantic attribution module, a path screening and closing module and a structure combination response module.In the application, the logical linkage organization among structure parameters is realized by constructing a parameter control path and combining multiple relationship recognitions among structure nodes, the constraint recognition capability for the structure control path is enhanced by using a cross relationship judgment mechanism among standard clauses, the structure path screening is provided with a semantic guiding feature by combining the index relationship of the task semantic label, the structure matching precision of the path screening is optimized by using a continuity judgment method of the closed path, the collaborative adaptability among multiple structures is improved by using a response construction logic of the structure combination relationship, the linkage path with the continuity and the logical attachment features is established, and the logical integrity and the response coordination of the water conservancy design are improved.
Owner:SICHUAN PENGYAO ENVIRONMENTAL PROTECTION EQUIP CO LTD

Water conservancy design decision support system based on knowledge graph

The invention relates to the technical field of engineering design management, in particular to a water conservancy design decision support system based on a knowledge graph, which comprises a parameter constraint construction module, a design standard fusion module, a task semantic affiliation module, a path screening closing module and a structure combination response module. According to the method, logic linkage organization among structure parameters is realized by constructing a parameter control path and combining with multi-relationship identification among structure nodes, a cross relationship judgment mechanism among standard terms is utilized, the constraint identification capability on the structure control path is enhanced, and the structure control path is identified by combining with an index relationship of task semantic tags. Structural path screening has semantic guiding characteristics, a continuity judgment method of a closed path is adopted, structural matching precision of path screening is optimized, logic is constructed by using response of a structural combination relation, collaborative adaptability among multiple structures is improved, a linkage path with continuity and logical attachment characteristics is established, and the structural path screening efficiency is improved. And the logic integrity and response coordination of water conservancy design are improved.
Owner:SICHUAN PENGYAO ENVIRONMENTAL PROTECTION EQUIP CO LTD

Multi-platform design management and deployment

A design management and distribution system can include a design system configured to generate an update to a UI design comprising components, variables, and variants. A design pipeline can be configured to tokenize the components, variables, and variants of the UI design to generate tokenized code stored in a structured data format in a design repository. The system can include an application pipeline configured to translate the tokenized code into a first platform-specific package compatible with a first client device and into a second platform-specific package compatible with a second client device. The first platform-specific package and the second platform-specific package implement the UI design. A first application repository may receive the first platform-specific package from the application pipeline for distribution to the first client device, and a second application repository may receive the second platform-specific package from the application pipeline for distribution to the second client device.
Owner:DISH NETWORK LLC

BIM-based cleanroom modular design management system

The application provides a clean room modular design management system based on BIM, comprising: a modeling module for visualizing and assembling and laying out standardized functional components in a BIM platform based on a parameterized family library to generate an initial clean room model; a collaborative detection module for integrating the initial clean room model with a previously established BIM model and performing collision detection to obtain a detection result; a model updating module for generating a conflict correction instruction based on the detection result and updating the initial clean room model according to the conflict correction instruction; a simulation optimization module for simulating and analyzing environmental performance parameters of the updated initial clean room model and generating an optimization suggestion; obtaining a final clean room model and generating engineering data based on the final clean room model, effectively avoiding design conflicts and construction rework and significantly improving design efficiency.
Owner:KAIDE ELECTRONIC ENG DESIGN CO LTD

Engineering project construction stage cost management and control system and method based on BIM technology

PendingCN121563026AGeometric CADPayment architectureChange managementModel management
An engineering project construction stage cost management and control system and method based on a BIM technology belongs to the field of constructional engineering, and comprises a model management module, a cost data association module, a construction progress linkage module, a quality evaluation module, a progress payment management module, a change management module and a deepened design management module. Through deep fusion of the BIM model and the cost data, multi-module collaborative management and full-process automatic processing, the problems of data splitting, response lag, insufficient visualization, low integration level and the like in traditional cost management and control are effectively solved, and the system has the remarkable advantages of high efficiency, accuracy, dynamic performance, traceability and the like; the method is suitable for digital and refined cost management requirements of modern building engineering projects.
Owner:CHINA CONSTR FOURTH ENG DIV CORP LTD +2

Contact lens development database management system and method

The invention relates to a contact lens development database management system and method, and the system comprises a design management module which is used for receiving and processing a CAD optical design file and a parameter list uploaded by a design engineer terminal, guaranteeing the integrity of design input, and generating a unique code; the proofing cooperation module is used for sending a synchronization signal to a proofing engineer terminal based on the target design product code and the proofing requirement set, and supporting integrity verification and compliance judgment of proofing data; a difference identification module; a data archiving module; and a client interaction module. The proofing collaboration module comprises a proofing collaboration module; the task assignment unit is used for automatically assigning coded design tasks according to the state of the resource pool and generating a proofing work order containing product codes, process requirements and delivery time limit; and the state synchronization unit is used for executing a three-level redundant task synchronization protocol to ensure the strong consistency of the states of the system server, the proofing engineer terminal and the design engineer terminal.
Owner:LIJING PRECISION TECHNOLOGY (ZHEJIANG) CO LTD

A method for information-based association of design files and design disclosure based on a BIM model

The application provides a kind of based on BIM model design file and design disclosure informationization association method, comprising the following steps: S1, based on Bentley platform, the tree structure directory of management model is established in collaborative design;S2, design file is managed according to the tree structure directory mapped by model, and child node has root node information;S3, design disclosure information is managed according to professional division, and is associated with the design file that has been managed by the tree structure directory mapped by model;S4, through steps S1-S3, the design BIM data asset of automatically associated design file, design disclosure information is formed.The method provided by the application is suitable for three-dimensional BIM forward design management in engineering design, and can standardize the management of three-dimensional design model, design file management after three-dimensional drawing and design disclosure information management, form the BIM forward design achievement of light-weight release with design file and design disclosure information, and can be applied to industries including water conservancy and hydropower engineering, new energy engineering, municipal transportation engineering and building engineering.
Owner:POWERCHINA HUADONG ENG CORP LTD

Online drilling geological design platform and design method

The invention discloses an online drilling geological design platform and design method, and belongs to the field of drilling engineering in the petroleum and natural gas industry. The design management module is used for establishing a main template and a sub-template of a drilling geological design report and setting a designer personalized environment and a data inspection rule; the geological design module is used for importing and checking design well data, automatically generating a drilling geological design report according to the checked design well data, and realizing examination and approval of drilling geological design work; the document management module is used for performing unified classification management on laws and regulations; the data processing and imaging module is used for performing unified processing on the format of the text content, the subscript and the data of the table content; and the design tracking evaluation module is used for tracking and evaluating drilling geological design work. According to the invention, storage and sharing of special data of geological design are realized, the efficiency and quality of geological design work are improved, and the automation degree is high.
Owner:CNPC GREATWALL DRILLING COMPANY +1

Preliminary design review consultation whole process management and control method and system

PendingCN121639156AOffice automationDesign reviewSoftware engineering
The invention provides a method and system for managing and controlling the whole process of preliminary design review consultation, and the method comprises the following steps: forming a system specification system file of design review consultation according to a system file of preliminary design review; according to requirements and principles of design management, a working scheme and a design review consultation work standard manual are formed; establishing an evaluation model according to an evaluation principle, and evaluating the design review process; according to the characteristics of business work in different stages and existing work achievements, forming a preliminary design review consultation achievement template file; and sorting problems in the preliminary design review, forming design management work scheme optimization measures and suggestion reports, and completing management and control of the whole preliminary design review consultation process. According to the technical scheme, programming, standardization and refinement of the whole process of preliminary design examination and consultation of the oil and gas pipeline project are achieved.
Owner:CHINA PETROLEUM LONGWAY ENG PROJECT MANAGEMENT CO LTD +1

An industrial design intelligent drawing data management system

PendingCN122433145AChecksumData management
The application discloses an industrial design intelligent drawing data management system and belongs to the technical field of industrial design management. Through symbolic logic constraint and supervisory signal injection, the initial design data generated by the model can effectively meet ISO geometric constraints, avoiding the geometric tomography problem of the traditional AI generation model. The introduced constraint loss term forces the model to learn engineering rules, which can effectively improve the constraint compliance rate of the generated data. Through the implementation of constraint compliance multidimensional checking and multidimensional error compensation, the automatic constraint checking can ensure that the drawing meets the ISO geometric tolerance standard, avoiding production rework caused by design violations. Without secondary conversion, the drawing precision and reliability can be effectively improved, and the geometric and topological inaccuracy problem existing in the prior art is effectively solved.
Owner:CHANGSHA YUNZHAN NETWORK TECHNOLOGY CO LTD