Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

176results about How to "Realize dynamic management" patented technology

Time-sensitive network flow routing and scheduling method based on centralized control

ActiveCN119544805ARealize dynamic managementGuaranteed transmission reliabilityTransmissionPathPingGlobal topology
The invention belongs to the technical field of network transmission, and particularly relates to a time-sensitive network flow routing and scheduling method based on centralized control. Comprising the steps that CNC constructs network topology and generates global topology information; the CUC collects demand information of each to-be-transmitted traffic from each source node and divides traffic priorities according to the demand information; the CNC generates an optimal transmission path for each flow according to the global topological information; the CNC distributes a transmission time slot for each flow and dynamically adjusts the transmission time slot; carrying out synchronous distribution on the optimal transmission path and the transmission time slot, optimizing the transmission time slot and controlling the jitter of the transmission time slot; a scheduling table is generated according to the final distribution result of the paths and the time slots, and the CNC distributes the scheduling table to each network device; when the network state is changed, the scheduling table is dynamically adjusted to realize real-time routing and scheduling of the flow; according to the invention, the dynamic management of the flow priority is realized, the utilization rate of network resources is enhanced, and the service quality and high availability of transmission are ensured.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Sewage treatment intelligent control system based on feedforward algorithm and feedback control

The invention discloses a sewage treatment intelligent control system based on a feedforward algorithm and feedback control, and particularly relates to the technical field of sewage treatment intelligent control. Comprising a sewage treatment time division module, a sewage treatment data acquisition module, a sewage treatment feedforward algorithm establishment module, a sewage treatment feedback control execution module, a sewage treatment intelligent analysis module and a sewage treatment intelligent evaluation module. A sewage treatment response output index and a sewage treatment feedback output index are obtained based on a scientific data analysis decision, and a sewage control stability evaluation coefficient is obtained through further analysis and is used for evaluating whether an intelligent management control mode of sewage is abnormal or not. The method can achieve the automatic and intelligent dynamic management of the sewage treatment process through the prediction and analysis of the sewage treatment trend by means of an intelligent algorithm, and improves the treatment efficiency and quality.
Owner:SUZHOU SUSHEN WATER TECH CO LTD

Construction safety early warning method and system based on mixed reality

The invention belongs to the technical field of building construction safety management, and provides a construction safety early warning method and system based on mixed reality, and the method comprises the steps: converting the longitude and latitude of geographic coordinate system data into plane coordinates, and converting the plane coordinates into a local coordinate system of a spatial mapping grid formed by simultaneous positioning and a map construction technology; through coordinate transformation, geographic coordinate system data can be accurately mapped into a model space coordinate system of the mixed reality equipment, the limitation that external high-precision positioning data are difficult to integrate in a traditional mixed reality technology is broken through, and high-precision equipment positioning is realized; meanwhile, an initial weight value is distributed to each grid unit in the space mapping grid, the weight is dynamically adjusted to change the size of the grid, dynamic management of space mapping grid data is achieved, detailed real space mapping grid data can be reserved after initial alignment is carried out through the space mapping capacity of mixed reality equipment, and the space mapping capacity of the mixed reality equipment is improved. And a data basis is provided for subsequent dynamic collision detection.
Owner:SHANDONG ELECTRIC POWER ENG CONSULTING INST CORP

Land resource management method and system based on big data analysis

The invention relates to the technical field of land resource management, in particular to a land resource management method and system based on big data analysis. The method comprises the following steps: acquiring multi-source land resource acquisition data; carrying out asynchronous parallel data acquisition on the multi-source land resource acquisition data so as to generate multi-source land resource real-time acquisition data; performing request-response optimization on the multi-source land resource real-time acquisition data to generate a self-optimization transmission parameter set; performing precision error correction on the standard multi-source land resource real-time data by using the self-optimization transmission parameter set to generate land resource correction data; performing nonlinear feature enhancement processing on the land resource correction data to generate a nonlinear enhanced feature matrix; and performing dimension compression processing on the nonlinear enhanced feature matrix to generate a multi-dimensional spatial-temporal feature matrix. According to the invention, the comprehensiveness and accuracy of land resource management are improved by improving data acquisition, processing, prediction and planning methods.
Owner:JIANGSU TUOKUTE TECH DEV CO LTD

Building foundation pit remote monitoring method and system

The invention relates to the technical field of remote monitoring, in particular to a building foundation pit remote monitoring method and system, and the method comprises the following steps: collecting geological, meteorological and construction activity data, regularly reading the surface rainfall and underground water level variation of a building foundation pit, calculating the indexes of water level change and rainfall, and generating an environment change data set. According to the invention, through regular collection and analysis of changes of surface precipitation and underground water level and calculation of influence indexes of the changes, monitoring data is no longer an isolated numerical value, but is converted into environmental data having substantial influence on stability of the building foundation pit, response speed and accuracy of the monitoring system are improved, and through real-time image and risk level calculation, the stability of the building foundation pit is improved. According to the technical scheme, potential dangerous areas are identified, the risk assessment process is optimized, dynamic management of risks and synchronous updating of a risk level table of priority ranking and sound-light alarm are achieved, an early warning strategy is more effective, and the initiative and preventability of safety monitoring are improved.
Owner:CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP HEBEI CO LTD +1

Intelligent lock management method and system

The invention discloses an intelligent lockset management method and system, and relates to the technical field of intelligent locksets, and the method comprises the steps: carrying out the data preprocessing and feature extraction of first data, and obtaining a first data feature vector; distributing different opening permissions to different keys, constructing a dynamic permission management model, training the dynamic permission management model by adopting the first data feature vector, and adjusting the opening permission of the user according to the trained dynamic permission management model; carrying out encryption on keys with different permissions under different conditions by adopting improved white-box block cipher information encryption; and establishing an anomaly detection mechanism by adopting the lock state data, detecting the real-time lock data according to an anomaly detection rule, triggering an alarm mechanism according to a detection result, and recording a processing process. According to the method, the dynamic authority management model is trained, and the opening authority of the user is adjusted according to the model output result, so that fine authority management of different users is realized, and the safety and the flexibility of the system are improved.
Owner:GUIZHOU POWER GRID CO LTD

Enterprise computing power resource allocation scheduling method and system

The invention discloses an enterprise computing power resource allocation scheduling method and system, and particularly relates to the technical field of resource allocation scheduling. A test task is generated by simulating a real scene, scheduling success rate fluctuation features and conflict resolution efficiency features are extracted, scheduling accuracy is evaluated through a machine learning model, and accuracy scheduling, incomplete accuracy scheduling and inaccuracy scheduling are classified according to results; for accurate scheduling, an existing strategy is kept, and continuous monitoring is carried out; for inaccurate scheduling, an algorithm is reconstructed; for incomplete accuracy scheduling, the proportion of the resource pool is dynamically adjusted by predicting the abnormal degree, and the low-priority task is switched to the standby resource pool when the abnormal degree is high, so that the rationality of resource allocation and the scheduling accuracy are remarkably improved, and the real-time performance and the resource utilization efficiency of the key task are guaranteed; and the system scheduling failure rate and the economic loss caused by resource conflicts are reduced.
Owner:JIANGSU HOPERUN SOFTWARE CO LTD

Regional carbon emission tracing method

The invention provides a traceability method for regional carbon emission. The traceability method comprises the following steps: step S1, dividing emission sources in a region; s2, collecting emission data of an emission source; s3, arranging monitoring nodes, and collecting meteorological, geographical and carbon emission data at the nodes; s4, establishing a carbon emission dynamic distribution model, and predicting dynamic distribution of carbon emission under different conditions; and S5, comparing the monitoring data of each emission source in the area with a prediction result of the carbon emission dynamic distribution model, if the monitoring data is within a prediction result range, indicating that the emission activity of each emission source in the area is within a normal range, and if a significant difference exists, indicating that the emission amount of the emission source exceeds a normal level. A wireless sensor network (WSN) system reversely identifies and tracks an abnormal emission source from a monitoring node by analyzing the track and change of the simulated pollutant puff. According to the invention, the monitoring comprehensiveness and accuracy are improved, and efficient environment management and carbon emission control can be realized.
Owner:JIANGSU UNIV

Data management method and system for automobile transaction platform

The invention relates to the technical field of data storage management, in particular to a data management method and system for an automobile transaction platform. The method comprises the following steps: obtaining a to-be-stored data sequence corresponding to an automobile transaction platform, and carrying out index pair classification extraction and storage space limit quantification calculation to obtain a storage release memory space limit degree corresponding to each type of index field; performing sequence storage division on the corresponding to-be-stored data sequence to obtain a storage data sequence segment corresponding to each type of index field; obtaining a query access rate and a storage interval approach access degree of the corresponding sequence segment, and carrying out storage activity evaluation analysis and index storage priority measurement analysis to obtain an index storage priority measurement of each type of index fields for each sequence segment; and carrying out priority storage management on the corresponding storage data sequence segments. According to the invention, mass data in the automobile transaction platform can be managed efficiently and accurately, so that the storage process of the data is optimized.
Owner:SHENZHEN GLOBALBRANDS TECH CO LTD

Irrigation area measurement and control integrated gate intelligent scheduling system and method thereof

The invention relates to the technical field of intelligent agriculture, in particular to an irrigation area measurement and control integrated gate intelligent scheduling system and method, and the system comprises a data collection module, a gate control module, a data processing and analysis module, an intelligent scheduling module and a monitoring and early warning module. By integrating a water level sensor, a flow meter, a weather station data interface, a soil humidity sensor and an agricultural satellite data interface, various agricultural data and hydrological data in an irrigation area are collected in real time, and the crop growth condition, the water demand, the rainfall capacity, the evaporation capacity and the like are analyzed by utilizing historical data and models; therefore, an accurate irrigation scheduling strategy is formulated and executed in the intelligent scheduling module, water supply needed by crop growth is ensured, meanwhile, the system monitors agricultural data and hydrological data in an irrigation area in real time through the monitoring and early warning module, a reasonable threshold range is set, early warning can be triggered in time once an abnormal condition occurs, and the system is safe and reliable. And a reliable decision basis is provided for irrigation area management.
Owner:BEIJING HUITU INFORMATION TECH CO LTD

Flexible load control technical method of built-in electric energy meter based on large-current switch

The invention relates to the technical field of power system control, and discloses a flexible load control technical method based on a high-current switch built-in electric energy meter, which comprises the following steps: monitoring current and voltage in real time, and inputting data into a fuzzy logic control system; formulating a fuzzy rule, and judging a current state through fuzzy logic control; implementing a safe load removal and reset strategy for a super-capacitance power utilization scene, and executing an overcurrent opening operation; setting a maximum load threshold value according to different power utilization environment characteristics, and formulating a load control strategy; and a multi-stage power control scheme is implemented, and a load control security authentication mechanism is established. According to the method, electricity utilization characteristic research in typical application scenes is carried out, a load flexible control technology is researched in combination with a switch built-in scheme, a multi-scene and multi-cost control strategy is made through multi-stage power control, overcurrent opening and self-adaptive closing functions, flexible control over power consumers is achieved, and the electricity utilization management level is improved.
Owner:GUIZHOU POWER GRID CO LTD

New energy equipment high-frequency wire harness dynamic connection optimization method based on reinforcement learning

The invention aims to provide a reinforcement learning-based dynamic connection optimization method for high-frequency wire harnesses of new energy equipment, and relates to the technical field of new energy, and the method comprises the steps: 1, collecting the operation data of each battery module of the new energy equipment, and building a state vector in combination with the high-frequency wire harness characteristic data of each high-frequency wire harness in the new energy equipment; 2, calculating a predicted temperature distribution vector based on the state vector and the temperature distribution vector; based on the state vector, the high-frequency wire harness stress and the predicted temperature distribution vector, constructing a state space and an action space of a reinforcement learning model; 3, defining a reward function of the reinforcement learning model; and completing dynamic connection optimization of the high-frequency wire harness in an iterative optimization mode. According to the invention, the stability, the energy efficiency and the safety of the system are obviously improved, and the service life of the high-frequency wire harness and the connection point is effectively prolonged.
Owner:GUANGDONG DINGDUAN INTELLIGENT TECHNOLOGY CO LTD

Cross-platform identity authentication and authorization method, system, equipment and medium

The invention discloses a cross-platform identity authentication and authorization method. The cross-platform identity authentication and authorization method comprises the following steps: S01, logging in an application program of a mobile terminal; s02, the user authorizes the PC client on the mobile device, and the PC client registers a temporary AK / SK to the identity authentication and authorization service through the mobile device; s03, the PC client uses AK / SK to generate JWS as a resource access token to initiate a service request to the service; s04, after the business service receives the business request, the JWS in the request is taken out to verify whether the token valid request and the association relationship are correct or not to the identity authentication and authorization service, and the JWS in the current request is recorded; and S05, after the verification is passed, the business service carries out business processing and records the resource access condition of the current AK. According to the method, the JWS token is dynamically generated and verified in real time, so that the token is effectively prevented from being stolen and reused, high-security cross-platform authorized access is ensured, and the transaction security is improved.
Owner:GUANGDONG ELECTRONIC CERTIFICATION AUTHORITY CO LTD

Tunnel construction progress dynamic management method and system

The invention provides a tunnel construction progress dynamic management method and system, and the method comprises the steps: obtaining a key construction path with the longest construction period in a plurality of project construction paths in a tunnel construction project; inputting the rate influence factor data of each sub-construction project into a pre-trained tunnel construction rate prediction model, outputting a construction rate prediction value of each sub-construction project, and dividing the workload of each sub-construction project by the corresponding construction rate prediction value to obtain a predicted construction period of each sub-construction project, adding to obtain a tunnel predicted construction period of the tunnel construction project and determining a construction plan date; dynamically setting a plurality of monitoring time points according to supervision requirements of a tunnel construction project, and calculating a current progress deviation rate and a dynamic target construction period deviation rate of each monitoring time point to obtain a construction period delay index; and judging the construction progress of the tunnel construction project at each monitoring time point according to the construction period delay index, and performing prompting and early warning so as to guide and adjust the subsequent construction progress of the tunnel construction project.
Owner:INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +2

Train safety protection distance adjusting method and device

The invention provides a train safety protection distance adjusting method and device. The train safety protection distance adjusting method comprises the steps that the current safety protection distance and a preset attribute distance set of a target train are obtained; identifying at least one current operation scene where the target train is located, and screening target attribute distance data and target protection weights corresponding to the current operation scenes in a preset attribute distance set according to the current operation scenes where the target train is located; determining a target expected safety protection distance corresponding to the target train according to the target attribute distance data; according to the target attribute distance data and the target expected safety protection distance, determining a to-be-determined safety protection distance corresponding to each current operation scene of the target train; and determining a target safety protection distance of the target train according to the to-be-determined safety protection distance corresponding to each current operation scene and the target protection weight corresponding to each current operation scene, and adjusting the current safety protection distance into the target safety protection distance.
Owner:BEIJING URBAN CONSTR INTELLIGENT CONTROL TECH CO LTD

Test method and computing device

The embodiment of the invention provides a test method and computing equipment. The method comprises the steps of obtaining a test task, wherein the test task comprises a plurality of test cases; obtaining a test environment requirement of each test case; determining a plurality of first test case sets according to the test environment demand information; determining a mutual exclusion array and at least one inclusion array according to the plurality of first test case sets; creating a corresponding test environment for each first test case set in the mutually exclusive array, and allocating each first test case set to the corresponding test environment; creating a corresponding test environment for each inclusion array, and distributing all the first test case sets in each inclusion array to the corresponding test environment; and executing the test task. According to the scheme, the number of test environments can be accurately provided under the condition that the test environments are diversified, so that waste of test environment resources is reduced, and the test efficiency is improved.
Owner:XFUSION DIGITAL TECH CO LTD

High arch dam construction progress management method and device and storage medium

The invention relates to the technical field of hydropower station dam construction progress management, in particular to a high arch dam construction progress management method, device and equipment and a computer storage medium. According to the method, the pouring progress appearance, the pouring strength and the pouring amount in the time period can be obtained according to the starting and ending time of any pouring, the pouring appearance, the pouring strength and the pouring amount in the starting and ending elevation can also be obtained according to any starting and ending elevation, and single-bin pouring information can be obtained according to the name of any target bin; by comparing and analyzing the construction features and data of the progress plan and the actual progress in real time, a manager can timely find progress deviation, take deviation correction measures and adjust the progress plan so as to guide subsequent construction and realize dynamic management of the construction progress, so that the cost is effectively reduced, and the efficiency and the accuracy are improved.
Owner:HUANENG LANCANG RIVER HYDROPOWER CO LTD

Urban greening state monitoring method and system based on digital mirror image information

The invention relates to the technical field of greening management, in particular to an urban greening state monitoring method and system based on digital mirror image information, and the method comprises the steps: collecting the real-time live-action data of a designated city, combining the real-time operation rule of the city, and generating a virtual city update mirror image through a digital twinborn technology; extracting digital mirror image information in a specified time period from the virtual city updated mirror image to obtain greening state mirror image data, and generating a virtual city greening state by analyzing the mirror image data; further detecting the greening state of the virtual city, generating greening state early warning information, and feeding back the greening state early warning information to the real city to determine a monitoring area and a monitoring index; and performing live-action monitoring on the designated area of the real city, collecting and analyzing monitoring data to obtain an actual monitoring result of the alarm area, and synchronizing the actual monitoring result to the virtual city update mirror image. Dynamic monitoring and bidirectional feedback of the greening state are realized, and technical support is provided for fine management and scientific decision-making of urban greening.
Owner:ZHE JIANG QING SHUANG HUAN BAO KE JI YOU XIAN GONG SI

LTE and 5G network service load prediction and network planning method and system

The invention discloses an LTE and 5G network service load prediction and network planning method and system, and relates to the technical field of communication network management and optimization, and the method comprises the steps: collecting multi-source data through a network monitoring system and a sensor, carrying out the cleaning and normalization processing of the data, extracting the related characteristics of network load prediction, constructing a quantum inspiration machine model, and carrying out the network load prediction. Inputting the processed data into a model for learning and optimizing model parameters, creating a highly-simulated network digital twinborn, inputting service load data predicted by a quantum machine learning model, simulating network performance after implementation, evaluating network performance and a resource allocation effect, and dynamically adjusting network slice configuration according to an evaluation result. According to the method, through multi-source data acquisition, cleaning and feature engineering, a quantum inspiration machine learning model, network performance and resource management optimization, digital twinborn simulation and dynamic slice configuration, the service quality under high load is ensured, and network planning efficiency fusion is improved.
Owner:SICHUAN COMM RES PLANNING & DESIGNING CO LTD

Information maintenance method based on dynamic configuration item management and configuration management database system

The invention relates to an information maintenance method based on dynamic configuration item management and a configuration management database system. The method comprises the steps that metadata is adopted to construct a configuration item model comprising types, attributes and relation information; and based on the configuration item model, constructing a universal configuration item data storage structure, and performing dynamic management on the configuration item data. Compared with the prior art, the method has the advantages that physical decoupling of the configuration item model and the configuration item storage structure is realized through combination of metadata management of the configuration item model and general storage structure design of the configuration items, and more efficient and safer online dynamic configuration management can be realized on the premise of not influencing the data storage structure.
Owner:SHANGHAI PUDONG DEVELOPMENT BANK

Low redundancy rate image segmentation method and system based on FPGA

The invention relates to the technical field of remote sensing image on-orbit real-time processing, in particular to a low-redundancy-rate image segmentation method and system based on an FPGA, and the method comprises the steps: determining the maximum physical size of a target object; calculating a first maximum pixel value occupied by the target type object in the remote sensing image according to the maximum physical size of the target type object; performing correction calculation on the maximum physical size according to the side-sway angle during satellite imaging to obtain the maximum physical size of the target object after side-sway distortion is considered; calculating a second maximum pixel value occupied by the target type object in the remote sensing image according to the maximum physical size of the target type object after side-sway distortion is considered; taking the maximum value from the first maximum pixel value and the second maximum pixel value as an overlapping region setting value; setting an overlapping region setting value as a sliding window segmentation step length; and carrying out sliding window segmentation on the segmented sub-graphs according to the sliding window segmentation step length. According to the method and the device, the minimization of the overlapped region of the segmented sub-images is realized, the segmentation redundancy rate is reduced, and the data storage and transmission quantity is reduced.
Owner:JILIN UNIVERSITY

Laboratory hazard source identification system and method based on machine vision

The invention provides a laboratory hazard source identification system and method based on machine vision. The laboratory hazard source identification system based on machine vision comprises a BIM modeling module, an algorithm training module, a rule engine module and an early warning module. The laboratory hazard source identification method based on machine vision comprises the following steps: S1, establishing a laboratory hazard source model; s2, obtaining a training set and a test set; s3, training and evaluating the target detection algorithm model; s4, using the trained target detection algorithm model to identify a hazard source; according to the method provided by the invention, the problem that in the prior art, a new dangerous source in the laboratory cannot be input and identified in time is solved, corresponding control measures can be taken in time, and the safety management of the laboratory and the risk assessment accuracy of the dangerous source of the laboratory are improved.
Owner:NANJING NUOFER INFORMATION TECH CO LTD

Database access method and device for preventing user data leakage in container

The invention discloses a database access method and device for preventing user data leakage in a container, and the method comprises the steps: a business service sends a connection establishment request to a database service; a database side vehicle service hijack connection establishment request which has the same POD with the business service and is different from the business service in a container contai ner; the database side vehicle service analyzes a database protocol, modifies a user name and a password in the connection establishment request, and forwards the modified connection establishment request to the database service; the database service performs user name and password verification based on the modified connection establishment request, and returns a response after the verification is passed; and the database side vehicle service receives the response of the database service and forwards the response back to the business service, and the business service establishes database connection with the database service. According to the invention, the database side vehicle service is introduced between the business service and the database service, all database connection requests are intercepted, and the business service does not need to know the user name and password of the database when connecting the database, so that the leakage of certificates is avoided.
Owner:BEIJING BAIGEFEICHI TECH LLC

Multi-agent collaborative task state management and abnormal backtracking method and system

The application provides a multi-agent cooperative task state management and abnormal backtracking method and system, relates to the technical field of artificial intelligence, and comprises the following steps: obtaining interaction data, state data and execution logs, constructing an initial task knowledge graph based on an ontology model, establishing a bidirectional causal chain by using a Bayesian network to form a dynamic knowledge graph, analyzing state migration rules when an abnormality is detected, identifying a propagation node, constructing an abnormal propagation subgraph, generating an influence chain, determining a recovery priority and triggering state rollback. The method can quickly trace the abnormal source, effectively control abnormal diffusion, and improve system robustness and task recovery efficiency.
Owner:BEIJING YIZHUANG INTELLIGENT CITY RES INST GRP CO LTD

Method and system for controlling night light equipment based on digital travel

The invention discloses a control method and system for night light equipment based on digital travel, and relates to the technical field of light control. Comprising the following steps: deploying various sensors to collect data in real time; performing preliminary analysis on the collected data to obtain environment characteristic information of the current night market; according to the feature information, determining a target atmosphere of a target night city light device, and performing light effect planning on the target night city light device based on the target atmosphere to obtain a target light effect; according to the target light effect, determining to-be-used instructions, and based on each to-be-used instruction, controlling the target night market light equipment to realize a preset night market atmosphere according to the target light effect; the influence of the light effect on the tourist experience is monitored in real time, and the light control strategy is dynamically adjusted according to the monitoring result. According to the invention, the intelligent, personalized and dynamic management of the light environment of the night market is realized, the visual attraction and cultural atmosphere of the night market are improved, and the energy use efficiency is optimized.
Owner:ZHEJIANG YOKELIGHT PROJECT CO LTD

Data security detection method and device

The invention relates to the technical field of data security, in particular to a data security detection method and device, and the method comprises the following steps: based on the operation state of data equipment, collecting the information of a network environment where the data equipment is located, detecting the type and number of access equipment, obtaining the number of abnormal software installed in the data equipment, and evaluating the risk level of the data equipment; and obtaining an equipment risk assessment result. According to the invention, by using the operation state of the data equipment, evaluating the risk level of the equipment, evaluating the type and file size of the data, calculating the importance score of the data, combining the risk level of the equipment, and adjusting the anomaly detection threshold, the safety early warning capability and the response speed are improved, so that the safety protection is more active and accurate; according to the method, the equipment risk and the data exception level are integrated, so that the overall data security level assessment is more comprehensive, a more scientific basis is provided for a subsequent security policy, and the quality and efficiency of data protection are improved.
Owner:BEIJING RONGHENG TECHNOLOGY DEVELOPMENT CO LTD

Guide vane wear prediction method and system based on deep learning

The invention discloses a guide vane wear prediction method and system based on deep learning, and belongs to the technical field of mechanical fault prediction and maintenance, and the method comprises the steps: collecting real-time sensor data of guide vanes, and integrating historical wear data of similar guide vanes; identifying similar features of similar guide vanes, extracting key wear modes through the similar features, and establishing corresponding prediction models for different guide vanes; and based on the extracted features and the prediction model, analyzing the wear condition of the guide vane, and providing a wear prediction result. Through comprehensive monitoring and data analysis, the accuracy of guide vane wear prediction is improved, and the reliability of equipment operation is ensured. Through a real-time alarm system, dynamic management of different wear degrees is realized, maintenance work is effectively guided, fault risks are reduced, the service life of equipment is prolonged, and the operation and maintenance efficiency is improved. According to the invention, the abrasion problem can be prevented in advance, and the normal operation and safety of the water turbine are guaranteed.
Owner:SICHUAN HUANENG TAIPING YI HYDROPOWER CO LTD

Nutrition and health management system and method based on endocrine patients

ActiveCN119007939ARealize dynamic managementRealize intelligent nutrition and health managementNutrition controlPatient-specific dataNutritionData acquisition module
The invention provides a nutrition and health management system and method based on an endocrine patient, and the system comprises a data collection module which is used for collecting information data of a target patient, and analyzing the information data of the target patient to determine nutritional demand elements; the scheme making module is used for making a nutrition health management scheme according to the nutrition demand elements; the monitoring module is used for monitoring endocrine index transformation characteristics of the target patient in a preset time period based on the nutrition health management scheme; and the dynamic optimization module is used for dynamically optimizing the nutrition health management scheme according to the index transformation characteristics and generating a self-adaptive health dynamic management library based on the target patient according to an optimization result. Intelligent nutrition and health management of the target patient is effectively realized, and convenience is provided for health management.
Owner:BEIJING SIHAI HUIZHI TECH CO LTD

Elevator control method and device based on multiple scenes and computer equipment

The invention relates to an elevator control method and device based on multiple scenes and computer equipment, and relates to the technical field of intelligent linkage. The method comprises the steps that body characteristics, a target floor and passenger flow information of an elevator waiting object in an elevator waiting hall are obtained, elevator use requirements are analyzed, and a scheduling scheme is determined. And after the elevator waiting hall outputs the guide information, the resident and external elevator waiting objects are identified by using the elevator climbing video data, resident building linkage data are generated based on historical behaviors of the resident objects, and customized behavior guide is provided. And for an external object, external building linkage data is generated according to the elevator waiting behavior of the external object and is analyzed and managed by the monitoring center. By the adoption of the method, dynamic elevator control and elevator linkage can be achieved, and elevator dispatching accuracy and dynamic management of building passenger flow are further achieved.
Owner:XIAN HANGXING INTERNET OF THINGS INFORMATION TECH SERVICE CO LTD

Network asset risk monitoring management system and method

The invention discloses a network asset risk monitoring management system and method, and relates to the technical field of network asset management, and the method comprises the steps: collecting the data of network assets in real time according to preset network asset parameters; constructing asset risk analysis characteristics according to the network asset parameters, preprocessing the data of the network assets, and calculating values of the asset risk analysis characteristics according to the preprocessed data of the network assets; asset risk analysis features are combined to form feature vectors, and a comprehensive risk coefficient is calculated through multi-dimensional nonlinear combination and weight adjustment; and setting a threat level threshold according to the comprehensive risk coefficient, judging the risk level of the current asset, and executing a monitoring management strategy according to the risk level. Through real-time dynamic monitoring, multi-dimensional risk feature analysis, a flexible risk level adjustment mechanism and accurate threat identification and response, an efficient, accurate and flexible security risk management method is provided for network assets, and the accuracy of risk assessment and the response capability of management are effectively improved.
Owner:ZHONGAN NETSHIELD (GUANGZHOU) INFORMATION TECHNOLOGY CO LTD