Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

120 results about "Walling" patented technology

Walling is a method of torture used by the CIA in which a person's neck is encircled by a collar, and is then used to slam the person against a wall. According to information gathered by the International Committee of the Red Cross from six detainees, "walling" meant "beating by use of a collar", in at least one instance against a concrete wall.

Multi-use electric tile modules

A multiuse electric tile module for walling, flooring, or roofing applications having a photovoltaic cell, thermovoltaic cell, electroluminescent material, or a combination of these disposed over a rigid substrate, such as ceramic. Each tile is electrically connectable through a male-to-female connecter to at least one adjacent tile without external wiring. Preferably, a sealing layer is disposed over the electrical elements and rigid substrate to seal and protect each tile. Optionally, each tile may further include an inverter to convert direct current to alternating current or a battery to store electricity. The electroluminescent material provides light for architectural accents or nighttime visibility.
Owner:BANISTER MARK P

Walled gardens

The subject invention provides a unique system and method that facilitates a controlled communication environment which allows a user to participate in a plurality of privacy contexts with other people in a simultaneous manner in an online community. A user can assign or define varying levels of privacy to his / her information or content to control the visibility of such information by others. In particular, a first user can maintain one or more “gardens” or stores of content which may be accessible to at least a subset of the online community. Access to the contents of any one garden can be based on the privacy level of the garden and the privacy level (e.g., access parameters) granted to the person. The privacy levels and arrangement of content can be hierarchal and / or non-overlapping. Thus, a user can seamlessly communicate with multiple users at the same time regardless of their context or privacy level while maintaining the privacy boundaries of each garden.
Owner:MICROSOFT TECH LICENSING LLC

Temporary protective shrouds for protecting windows and fixtures during construction

Protective shrouds for temporarily protecting window assemblies, bathroom fixtures, and diverse prefabricated modules used in construction. The shrouds are fabricated from translucent plastic sheet material of polypropylene or polyethylene. A lower open port is selectively blocked by a foldable ventilation panel held in a deployed state by magnets. Rear mounted adhesive strips affix the shroud to the window. Top and side strips are bifurcated to enable rapid adjustments in height and length. When the tear away strips are removed, the exposed adhesive surface is pressed upon the target structure. Slight dimensional adjustments are made by pinching the sheet together, forming creases aligned with strip bifurcations, to gather material and shorten the shroud length or width. During subsequent dry-walling, shroud edges are captivated by wall board segments. Afterwards, the exposed junction between covered shroud and adjacent sheet rock portions is cut, and the shroud is torn away and discarded.
Owner:CAMPBELL PHILLIP R

Method for resource recovery of construction wastes

The invention provides a method for resource recovery of construction wastes, which comprises the following steps of: separating and removing impurities from the construction waste materials and preparing aggregates from the materials through the disposal processes of manual separation, crushing, magnetic separation, air separation, screen separation and the like, wherein the particle sizes of the aggregate meet the requirement of milling equipment, and then preparing regenerated powder from the regenerated fine aggregates with various particle sizes through the disposal processes of drying, grinding, air separation and the like. According to the method, the resource utilization value of the construction wastes is improved, and simultaneously, a resource utilization channel of the construction wastes is opened up; and the produced regenerated powder of the construction wastes can partially substitute fly ash to serve as a cement-base construction raw material such as a building mortar, a walling material, a low-end concrete and the like.
Owner:上海德滨环保科技有限公司

Continuous thermal insulation and fire protective composite placed on thermo-grid designed for wind load transfer

The present invention relates to construction materials and more specifically, to a continuous composite exterior insulation system and cladding used in the construction of building walls and structure, to control heat transfer, rain-water penetration, air and water vapor transmission while providing fire protection to a building enclosure. This invention relates to a thermal upgrade of existing and new buildings. The wall substrate is arranged for receipt of subsequent layers of cladding materials. Thermo-grid of insulated composite strapping is mounted on the surface of the said wall and a layer of continuous insulation e.g. polyurethane foam is applied between the thermo-grid strapping leaving a thin air gap between it and the next layer of the fire protective composite.
Owner:BOMBERG MARK +1

Subgrade vault with latching cover

A subgrade vault with a latching cover. The vault includes a peripheral wall with an open access port at the top. A peripheral ledge surrounds the access port. A cover to close the access port fits inside it, with a latch assembly inside it and a retractable latch pin disposed to fit in an aperture in the peripheral ledge. The latch pin is retractable by the stabbing motion of a tapered tool against a cam surface on the latch pin. The cover is locked in place merely by pressing down on it.
Owner:OLDCASTLE PRECAST

Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method

The invention discloses a snap-in self-ornamental composite insulated building module used by a high-rise building and a building construction method for the same. The building module mainly comprises an external walling module, an internal walling module and a clamping piece. The building construction method comprises the following steps that: a). reinforcing steel bars of a ground ring beam, a shear wall and a constructional column are bound; b). the external walling module and the internal walling module form hollow walling through the clamping piece and a draw-in gear by means of clamping, and the shear wall and the constructional column are positioned inside the hollow walling; c). wires are bound on the reinforcing steel bars to form outlines of the shear wall and the constructional column; d). concrete placement is respectively performed to form the shear wall and the constructional column; e). fire-retardant foam particles and foam concrete are used for mixed placement of the hollow walling to complete filling of the walling; f). the superface of a floor is fixed by a floor module bracket, and the steps are repeated until the building construction is completed. The building construction method can complete external decoration, internal plastering, simultaneous filling of a shear wall moulding board, a masonry and a beam moulding board at a time without arrangement of outdoor safe scaffolding, thereby the building construction method is energy-saving, high-efficiency, safe and environment-friendly.
Owner:雷现治

Wall climbing robot airflow adsorption technology and walk operation platform

The invention discloses an adsorption technology using air flow negative pressure and a wall climbing robot operation platform which realizes adsorption and walking on a wall surface by using the adsorption technology. In the platform, high-speed air flow is generated by using gaps between an adsorption disk and the wall surface by a fan, so negative pressure is generated due to flow rate difference of two sides of the adsorption disk and the adsorption and walking on the wall surface is finished under the friction action of walling wheels and the wall surface. The adsorption between the robot and the wall surface in a gap way is realized by fully using air flow negative pressure, so that the adsorption efficiency is high; self weight is light, and relatively large redundant load is achieved so as to meet the wide climbing operation requirements; the wall climbing robot operation platform is suitable for wall surfaces made of various materials, such as glass, metal, ceramic tiles, coating, cement and the like; the wall climbing robot operation platform can be applied to an arc wall surface with a small curved surface; and the wall climbing robot operation platform has a simple structure, and low manufacturing cost and is favorable for industrial production and popularization.
Owner:李远达

Construction method of walling and filling combined gob-side entry retaining wall body

The invention relates to a construction method of a walling and filling combined gob-side entry retaining wall body. The construction method comprises the following steps of: closely following forward propulsion of a stope face, erecting dense single supports at a gob retaining side at the rear part of a fully mechanized mining bracket, so that a space of a tunnel at the rear part of the stope face is retained; walling a square template wall with concrete pier blocks under the mask of the dense single props; meanwhile, installing counter-pulled anchor rods which penetrate through the template wall bodies, and carrying out lateral reinforcing on the template wall bodies; carrying out grouting filling on a hollow part defined by the template walls through injected holes reserved on the template walls till the internal spaces of the template walls are filled with grout; carrying out uniform whitewashing treatment on the wall at one side of a gob retaining tunnel to form a concrete spray layer; and sequentially circulating the steps along with propulsion of the stope face till construction of the whole gob-side entry retaining wall body is finished. According to the construction method disclosed by the invention, a brickwork wall and a filling support are combined together, so that the construction method is simple and convenient and simple to operate and ensures that the wall body has high strength and can yield pressure suitably; and length of each walling of the wall body is consistent with the everyday propulsion degree of the stope face, and the construction method is flexibly suitable for actual mining.
Owner:CHINA UNIV OF MINING & TECH

Foldable walling machine and walling method

ActiveCN104405138AEasy way to build wallsGood wall effectBuilding material handlingBrickControl system
The invention discloses a foldable walling machine. The foldable walling machine comprises a base, an X-axis track, a Y-axis track, a clamping jaw, a driving device, a brick feeding mechanism and a detection and control system. The invention also discloses a method adopting the foldable walling machine to build a wall. By adopting the foldable walling machine, the contradiction among the working range, size and application efficiency can be solved. The device is reasonable in structure, can be folded or retracted when in movement or not in use and is small in floor area, convenient to move on floor or a working plane, the track and walling arm structure can be flexibly used according to the real situation, the comprehensive efficiency is high, the foldable walling machine is flexibly applicable to different walls in different sizes and different types; moreover, the method for utilizing the walling machine to build the wall is simple, good in walling effect and suitable of being popularized.
Owner:张玉华

InstaLink: Instant Provisioning of Network Services

A system for nearly instantaneous service provisioning includes a customer premises pre-configured to receive one or more network services. The customer premises is coupled to a service edge device connecting the customer premises to a service provider network. The service edge device is configured to receive identifying credentials from the customer premises, and determine, via an authentication server, whether a walled garden flag has been set for the identifying credentials. In response to determining that a walled garden flag has been set, the service edge device configures a tunnel into a walled garden, and restricts access from the customer premises, wherein access is limited to the walled garden. In response to determining that a walled garden flag has not been set, the service edge device allows immediate access outside of the walled garden to receive the one or more network services.
Owner:CENTURYLINK INTPROP

Inspection well lid with LED (light emitting diode) caution light

The invention discloses an inspection well lid with an LED (light emitting diode) caution light. The inspection well lid with the LED caution light comprises a well lid, a walling crib, an LED light, infrared ray correlation devices, a battery module and a controller, wherein the LED light, the infrared ray correlation devices, the battery module and the controller are arranged on the walling crib; the infrared ray correlation devices are symmetrically arranged on the inner side of the walling crib; the LED light is arranged on the upper surface of the walling crib; the infrared ray correlation devices are connected with the controller; the controller is connected with the LED light; the battery module is respectively connected with the LED light, the infrared ray correlation devices and the controller; when the well lid does not cover the walling crib, the infrared ray correlation devices are switched on to send a trigger signal to the controller; and the controller generates a corresponding control signal; and the control signal is sent to the LED light. The inspection well lid with the LED caution light is free from additional equipment, such as a promotion device or a fence, and can automatically light to prompt as long as the inspection well lid is opened. The inspection well lid with the LED caution light is convenient and simple to use, and the personnel security is effectively guaranteed.
Owner:WUXI TONGMING TECH

Method for fixing mine vertical shaft device

ActiveCN103821520AHigh strengthReduce post-warpingShaft liningEngineeringWalling
The invention discloses a method for fixing a mine vertical shaft device. The method comprises the following steps in turn: processing and manufacturing a steel walling rib and blocking according to an inner diameter of a well wall; measuring and positioning the mounting position of the steel walling rib and underground assembling the steel walling rib; embedding the well wall of the steel walling rib and fixing a bunton and a well beam with the steel walling rib. A complete steel walling rib is embedded in a concrete well wall, so that the strength of the well wall is increased, the later deformation of the well wall is reduced, a beam nest or an anchor hole is prevented from being dug or constructed on the well wall when the shaft device is mounted, the completeness of the well wall is extremely ensured and the waterproof property is increased. Due to the excellent completeness of the well wall, the shaft surrounding rock still has the excellent waterproof property even under a complex geological condition. According to the method provided by the invention, the defect of the prior art that the completeness of the well wall is damaged when the shaft device is mounted is overcome, and the shaft device can adapt to the complex geological condition.
Owner:CINF ENG CO LTD

Prefabricated inspection well die and technology thereof for manufacturing inspection well

The invention discloses a prefabricated inspection well die and a technology thereof for manufacturing an inspection well, and belongs to the technical field of production of inspection wells. The prefabricated inspection well die comprises an outer die body, an inner die body, a bottom tray, an inner die cover and a walling crib die body; the inner die body comprises a large arc pillar and a small arc pillar which are capable of being spliced into a cylinder, two lines of steel bars are vertically arranged on the outer wall of the small arc pillar, and clamping devices are arranged at the upper end and the lower end of the inner wall of the small arc pillar; four foot holes are formed in the bottom tray and correspond to outer die feet and inner die feet, the inner die cover is conical, and the walling crib die body is annular. The technology for manufacturing the inspection well comprises six steps. The prefabricated inspection well die and the technology thereof have the advantagesthat the production efficiency is high, the quality of finished products is high, the finished product rate is increased by 1.5 times under the same condition, the feeding amount of concrete is lowered, the energy is saved, and the economic benefit is obvious.
Owner:HUBEI XINGBAO TECH CO LTD

Brick wall auxiliary walling device

Disclosed is a brick wall auxiliary walling device which is used for walling a brick wall efficiently, fast and conveniently. The brick wall auxiliary walling device comprises a base, a scissor-type lifting mechanism, a worktable, vertical plates, a guiding rail, a seat and a cement box. The worktable and the base are arranged up and down. The scissor-type lifting mechanism is arranged between theworktable and the base. A lifting driving part is arranged between the base and the scissor-type lifting mechanism. The bottom of the base is provided with travelling wheels. The pair of vertical plates is fixedly arranged on the worktable. The guiding rail is fixedly arranged between the two vertical plates. The guiding rail is slidably provided with the seat. The seat is provided with a safetybelt. The front side of the worktable is provided with a pedal table. A transverse rod located between the two vertical plates is arranged above the seat. A sliding rail is further arranged between the two vertical plates. The sliding rail is slidably provided with the cement box. The lower portion of the cement box is provided with a conveying pipe. The conveying pipe is connected with a cement brush. The cement brush is of a rectangular hollow structure. The side wall of the cement brush is movably provided with an inserting plate. The brick wall auxiliary walling can efficiently realize walling of bricks.
Owner:SHANDONG JIANZHU UNIV

Multicannular fluid delivery system with pressure sensitive alarm

The instant invention consists of an inner cannula of hosing amenable to transport of a liquid coupled with an outer cannula of hosing amenable to transport of a gas. As respects one embodiment, affixed to outer walling of the inner cannula and to inner walling of the outer cannula are rigid struts, typically three or four, at 120 DEG or right angles with respect to one another at various points along the respective lengths of the cannulae that serve to maintain separation of the cannulae from one another at times when the inner cannula is filled with a liquid and the outer cannula is filled with a gas under pressure. A second embodiment is strut free. Each cannula has an ingress end whereat a liquid is introduced into the inner cannula and whereat a gas is introduced into the outer cannula. Each cannula likewise has an egress end whereat the liquid is expelled typically from a nozzle thereat located and the gas is amenable to discharge via the opening of a valve component of the instant invention likewise thereat located. Moreover, the instant invention is characterized by the presence of alarm modalities serving to alert a user thereof to the fact of an unanticipated rise or drop in intercannular gas pressure.
Owner:FREED JOHN F

Modular walling systems

InactiveUS20120073233A1Adaptable and quick methodArmourWallsModularityEngineering
A system for the modular construction of partitions, the system comprising a plurality of modules, each module comprising a security panel and a frame, the security panel being attached to one or more surface of the frame, the frame comprising at least one box shaped profile, each profile being adapted for connection to an adjacent profile of an adjacent module or to a structural building member.
Owner:PRINCIPLE HLDG

Walling method and walling device

The invention discloses a walling method and a walling device. The walling method includes the steps of respectively arranging formworks on the two sides of a wall to be poured, and installing supports outside the formworks, wherein the heights of the formworks are smaller than the height of the wall to be poured, and the widths of the formworks are equal to the width of the wall to be poured; pouring the position between the formworks on the two sides with a certain number of grout-type wall materials, then stopping pouring, after a certain period of time, lifting the formworks on the two sides to be at certain heights, pouring the position between the formworks on the two sides with a certain number of grout-type wall materials again, then stopping pouring, and repeating lifting and pouring till the whole wall is completely built; or pouring the position between the formworks on the two sides with the grout-type wall materials, and after a certain period of time, starting to continuously lift the formworks and synchronously and continuously pour the position between the formworks with the grout-type wall materials till the whole wall is completely built; after the whole wall is solidified, disassembling the formworks and the supports. The walling device comprises a formwork unit and a pouring unit. The walling method and the walling device are high in walling efficiency, good in quality and free of formwork-moving grout-leakage phenomena.
Owner:赵路航

Method for on-site casting molding of gypsum internal partition wall

The invention relates to a method for on-site casting molding of a gypsum internal partition wall, which comprises the following steps: (1) modifying building gypsum powder, controlling the initial setting time of the gypsum powder to between 20 and 25 minutes and controlling the final setting time of the gypsum powder to between 25 minutes and 30 minutes, and before construction, testing two working parameters of the water consumption for normal consistency and the setting time of the modified building gypsum powder; (2) splicing templates at a position needing walling in a building according to the size and thickness of a wall; (3) calculating water consumption for pulping according to the water consumption for the normal consistency; (4) orderly conveying the water consumption and the modified building gypsum powder into a pulping system for manually-controlled pulping to obtain a pulp; (5) pumping and casting the pulp into a template cavity which is well arranged until the template cavity is filled with the pulp; and (6) from the time when casting is stopped on 25 to 30 minutes, de-molding to obtain the product. The wall cast-molded by the method has the characteristics of good smoothness, no defects such as joint and gap and the like, simple process and low production cost.
Owner:马兆林 +1

Environmental protection treatment terminal for rainwater and waste water recycling in building construction

ActiveCN110115893AEffectively deal with dust problemsEasy to handleUsing liquid separation agentSeparation devicesWastewaterWalling
The invention discloses an environmental protection treatment terminal for rainwater and waste water recycling in building construction. The terminal comprises an enclosing wall which is internally provided with a water delivery mechanism which rotates to spray water or mist to the air at any time, the sprayed water adsorbs dust in the air, and then removal of flying dust is achieved, the enclosing wall is internally provided with a lifting mechanism which can separate out and reuse muddy water and comprises a motor, a compression chamber with an opening facing downwards is formed in the enclosing wall, and a truncation mechanism capable of closing the compression chamber is arranged in the left end wall of the compression chamber. According to the device, a certain amount of water can beused for dealing with dust floating out of a construction site in a large range, not only is a considerable amount of water saved, but also the flying dust problem in the construction site is effectively solved; when a gravel truck enters and leaves the construction site, dust raised by the moving truck can be quickly and efficiently dealt with, so that passers-by are not affected.
Owner:建丰建筑科技有限公司

Alternate capstand equipped with affixation means

InactiveUS20080093325A1CapsWrappersWallingBottle
The instant invention is an alternate capstand being cylindrically shaped in the form of a hollow ring with the bottom side thereof being contoured so as to fit snugly as against the exterior walling of, for example, a typical soda-pop bottle together with threading configured about the external walling of the capstand and further with the bottom side of the capstand being equipped with adhesive affixation means serving to ensure sturdy, dependable affixation of the invention to such exterior walling.
Owner:COSTELLO GERARD M

Biological environment-friendly walling material and preparation method thereof

The invention relates to a biological environment-friendly walling material and a preparation method thereof. The walling material comprises the following raw materials in parts by weight: 80-120 parts of main material, 16-24 parts of adhesive and 24-36 parts of water, wherein the main material comprises cement, fine sand, straws and / or couch grass in a mass ratio of (16-24):(8-12):(56-84).The preparation method comprises the following steps: crushing couch grass and / or straws, cutting, and baking to obtain a fiber material; proportionally mixing and blending cement, fine sand, adhesive and water to obtain slurry; uniformly stirring the fiber material and the slurry, and then performing compression molding to obtain a wall blank; and performing natural curing or steam curing on the wall blank until the wall blank is finally set, and cutting to obtain the finished product. The biological environment-friendly walling material provided by the invention is light in weight, has favorable warm keeping / heat insulation / sound insulation properties, achieves a flame retardant effect, and can reduce the weight of a building; and meanwhile, by using the biological environment-friendly walling material, the forest fire hidden danger caused by burning of couch grass and / or straws and resulting air pollution is reduced, and the damage to environmental resources due to massive use of yellow sand is decreased.
Owner:武汉市木兰之春环保科技有限公司

Special bracket for construction of whole bilateral post-poured flange plate and application method thereof

The invention provides a special bracket for construction of a whole bilateral post-poured flange plate. A connection beam and a main beam are connected with a supporting column, a long inclined tension brace, a short inclined tension brace and a hanging column respectively; the hanging column is hinged to a reinforcing plate and is connected with a bottom template; a lateral template and a top template are mounted on the bottom template; the bottom template is fixedly connected with the main beam through a long hanging strap; the top template is fixedly connected with the main beam through a short hanging strap to form plane brackets; a stable whole bracket is formed between the plane brackets through the connection and fixation of an upper pull rod and a lower pull rod. The special bracket provided by the invention can be used for guaranteeing the whole walking of the bracket; the counter weight does not need to be balanced in a construction process, and a steel plate does not need to be pre-embedded on a beam surface when a T-shaped beam is prefabricated; the whole body does not need to be detached in a walling process, and the construction of the post-poured flange plate of a single-line railway can be rapidly finished; template closing and template detachment can be finished on the left and right sides at the same time; the special bracket is light in weight, low in cost, simple to machine and convenient to walk. In the cost ruction process, the quantity of matching operators is less and the efficiency is high; the construction duration is effectively shortened, the construction cost is reduced and the construction quality is improved; meanwhile, the special bracket is safe and reliable.
Owner:CHINA RAILWAY 21ST BUREAU GROUP THE FOURTH ENG

Energy-saving marble-imitating paint preparation method and product thereof

The invention discloses an energy-saving marble-imitating paint preparation method which comprises the following steps: (1) preparing silicate slurry; (2) preparing white latex paint; (3) toning; and (4) preparing the paint. The invention also discloses an energy-saving marble-imitating paint product prepared by the method. The method disclosed by the invention has the advantages of simple preparation technique, high formation tendency, low cost and high production efficiency. The energy-saving marble-imitating paint product disclosed by the invention has excellent corrosion resistance, high stability, temperature tolerance and weather resistance in natural marble, and overcomes the defects of heavy weight, high price, environmental pollution, radioactivity, non-renewability and the like in the natural marble. After use, the marble-imitating paint has realistic appearance and abundant tactile sensation and textures, ensures the walling to have clean and elegant appearance, and needs low manufacturing cost (only one fifth of the real marble). Besides, the construction process is simple, greatly shortens the construction period, and enhances the construction efficiency; and the marble-imitating paint has the advantages of low self-weight and high safety coefficient, and is beneficial to wide popularization.
Owner:张立功

Flower box guardrail-type enclosing wall

The invention discloses a flower box guardrail type fence, which comprises box-type uprights arranged at intervals, a low-wall flower box is arranged between the bottoms of two adjacent box-type uprights, and two box-type box-type boxes above the low-wall flower boxes There are guardrails between the columns, and the two ends of the guardrails are detachably connected to the corresponding box-type columns. The low-wall flower boxes are filled with nutrient soil for planting environmentally friendly landscapes. The low-wall flower boxes are connected to the adjacent A connecting and fixing device is provided between the box-type uprights; the present invention can ensure the improvement of construction quality, has high overall safety, is beneficial to speed up engineering installation, has high efficiency, and realizes disassembly and installation immediately, and the wall body can be moved, which has the advantages of It is conducive to the protection of the environment, reduces the waste of resources, does not disturb the people during construction, does not generate construction waste, and can be reused, which is conducive to promoting the development of energy saving, emission reduction and low carbon, and greatly reduces the incidence and danger of construction accidents.
Owner:刘保祥

Assembly type bounding wall

InactiveCN103061579ASolve the cracking problemQuick and easy on-site assemblyFencingWallingWall plate
The invention discloses an assembly type bounding wall which mainly comprises a cylinder (2) component and wall plate (3) components, wherein the cylinder (2) component and the wall plate (3) components are assembled to form a bounding wall. The components are formed in dies in a factory and then are transported to a construction field to be assembled, and construction is convenient and rapid and is not limited by seasons. With the adoption of the assembly type bounding wall, bounding walls in various fashions are combined by adopting different combination modes; the components are produced in the factory and are then transported to the construction field to be assembled, on-site assembly is simple and rapid, and the construction period is shortened; the waste of a product is little, the accuracy of the product is high, and the amount of product style is large; the production is not limited by the seasons, the assembly type bounding wall can also be produced in winter, and the winter construction problem is solved; and the deformation capability with a certain quantity exits among assembled square columns and the wall plates, thus solving the problem that a crack is produced on a wall body due to the temperature.
Owner:沈阳兆寰现代建筑产业园有限公司

Curtain wall security detection robot and curtain wall detection system

The invention discloses a curtain wall security detection robot and a curtain wall detection system, belonging to the field of glass curtain walls. The curtain wall security detection robot comprisesan adsorption device and a power unit, wherein the adsorption device comprises at least two flexible sealing rings, the flexible sealing rings are arranged on a base plate of the curtain wall securitydetection robot, and each the flexible sealing ring defines one sealing cavity; at least one air hole is formed in the base plate inside each sealing cavity, a negative pressure generating device isarranged above the base plate, and the air hole is connected with the negative pressure generating device; the power unit comprises multiple walking wheels which are distributed at the two sides of the curtain wall security detection robot, each walling wheel is connected with a transmission shaft, each transmission shaft is connected with a synchronous pulley, all the synchronous pulleys arrangedat the same side of the curtain wall security detection robot are connected by virtue of a synchronous belt, and part of the walking wheels arranged at the same side of the curtain wall security detection robot are connected with a motor by virtue of the transmission shafts. The curtain wall security detection robot disclosed by the invention is good in sealing property and can pass through a sealing glue line between two pieces of glass; meanwhile, the structure is simple, and power-weight ratio is improved.
Owner:CHINA TEST & CERTIFICATION INT GRP CO LTD

Device for vacuuming away drilled material when drilling with a drill in masonry and similar

The present invention relates to a device for vaccuming away drilled material when drilling with a drill in masonry and similar, including a low pressure chamber, at least a suction point and a connector for a suction unit that sucks a cutting accumulated on the suction point. The invention is characterized in that the suction point (14) and the low pressure chamber (5) are separated in space. By means of the invention, it is capable of sucking the drilled material generated during a drilling period reliably without a damage of the walling surface and a relation of the device position.
Owner:ELECTROSTAR

Anticorrosive treated material for highway rail boards and building wall boards and process thereof

A new antiseptics and process for highway safety guards and construction walling board, belonging to a new antiseptic material and process for hardware, especially referring to antisepsis of highway safety guards and construction walling board. Using inorganic material to be primary coat and surface coat, having resolved the pollution problem of technology currently, decreasing the injury of worker, prolonging using life. The main material of primary coat are SiO2, TiO2, Al2O3, CaO and so on and the main material of surface coat are SiO2, Al2O3, CaO, Na2O and so on. The materials are painted to the surface of hardware by grinding, riddling and nodulizing.
Owner:TAOYUAN NANOMETER INST HANDAN CITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products