Method for on-site casting molding of gypsum internal partition wall
A technology of in-situ pouring and inner partition wall, applied in the direction of wall, building material processing, building components, etc. Short cycle, good flatness, fast hardening effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] Example 1 A wall with a size of 4000mm×2670mm and a thickness of 100mm was poured on site.
[0030] (1) Add protein gypsum retarder to building gypsum powder according to 0.5‰ of its mass to obtain modified building gypsum powder.
[0031] Before construction, according to GB / T 17669.4-1999 "Determination of Physical Properties of Construction Gypsum Plaster", the modified building gypsum powder was tested for the two working parameters of standard consistency, water consumption and setting time. The result was that the initial setting time was 20 minutes, and the final The coagulation time is 25 minutes, and the water consumption for standard consistency is 0.65.
[0032] (2) Assemble a formwork with an area of 4000mm×2670mm at the designated wall position, and inflate and expand the inflatable sealing tape to completely seal the joints between the formwork and the formwork and beams and columns, and the thickness of the mold cavity is 100mm.
[0033] (3) Calculate ...
Embodiment 2
[0039] Example 2 A wall with a size of 4000mm×2670mm and a thickness of 120mm was poured on site.
[0040] (1) Add protein gypsum retarder to building gypsum powder according to 0.6‰ of its mass to obtain modified building gypsum powder.
[0041] Before construction, according to GB / T 17669.4-1999 "Determination of Physical Properties of Construction Gypsum Plaster", the modified building gypsum powder was tested for the two working parameters of standard consistency, water consumption and setting time. The result was that the initial setting time was 22 minutes, and the final The setting time is 27 minutes, and the water consumption for standard consistency is 0.60.
[0042] (2) Assemble a formwork with an area of 4000mm×2670mm at the designated wall position, and inflate and expand the inflatable sealing tape to completely seal the joints between the formwork and the formwork and beams and columns, and the thickness of the mold cavity is 120mm.
[0043] (3) Calculate the ...
Embodiment 3
[0049]Example 3 A wall body with a size of 5000mm×2600mm and a thickness of 150mm was poured on site.
[0050] (1) Add protein gypsum retarder to construction gypsum powder according to 0.7‰ of its mass to obtain modified construction gypsum powder.
[0051] Before construction, according to GB / T 17669.4-1999 "Determination of Physical Properties of Construction Gypsum Plaster", the modified building gypsum powder was tested for the two working parameters of standard consistency, water consumption and setting time. The result was that the initial setting time was 24 minutes, and the final The coagulation time is 28 minutes, and the water consumption for standard consistency is 0.58.
[0052] (2) Assemble a formwork with an area of 5000mm×2600mm at the designated wall position, and inflate and expand the inflatable sealing tape to completely seal the joints between the formwork and the formwork and beams and columns, and the thickness of the mold cavity is 150mm.
[0053] (3...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com